Rekomendasi Hasil Analisis Pengendalian Biaya Perbaikan Dermaga Apung di Pelabuhan Talang Duku, Jambi

Triyanto Triyanto, Manlian Ronald A Simanjuntak, Pio Ranap Tua Naibaho

Abstract


Indonesia's high logistics costs, reaching 23% of its GDP, highlight the urgent need for port efficiency as a key solution. This study aims to analyze the factors contributing to cost overruns in the floating pier repair project at Talang Duku Port, Jambi, and to formulate effective cost control recommendations. The research employed cost control breakdown structure analysis, multiple linear regression using the Least Squares method via EViews 10, and Interpretative Structural Modeling (ISM) to determine improvement priorities. The findings reveal 21 variables affecting cost overruns, with five dominant factors: design errors, financial difficulties, inflation, poor management and supervision, and ineffective communication. Among these, design errors had the most significant impact, with the highest coefficient (0.064471). Based on ISM analysis, the top priority corrective actions include anticipating sudden design changes, financial difficulties, and inflation, followed by improving project management and communication systems. The study concludes that proper design planning and strong coordination among stakeholders are crucial to minimizing cost overruns and enhancing overall port efficiency.

Keywords


Analysis of Cost Control; ISM; Port Efficiency and Effectiveness; Floating Pier.

Full Text:

PDF

References


Arikunto, S. (2012). Prosedur Penelitian Suatu Pendekatan Praktik (P. R. Cipta (ed.)).

Azizah, S. U., Yamali, F. R., & Handayani, E. (2020). Analisa Nilai Hasil Terhadap Waktu pada Proyek Pembangunan Gedung Laboratorium FKIP Tahap IV (Lanjutan) Universitas Jambi. Talenta Sipil, 3(2), 95–103. https://doi.org/10.33087/talentasipil.v3i2.35

Bedje, M. R., Sompie, B. F., & Tarore, H. (2012). ANALISIS PENGARUH PENGENDALIAN KUALITAS PELAKSANAAN PROYEK DERMAGA MILIK PEMERINTAH DI SULAWESI UTARA. JURNAL ILMIAH MEDIA ENGINEERING, 2(4).

Biro Komunikasi dan Informasi Publik. (2012). PERBAIKAN DAN PEMBANGUNAN PELABUHAN DAN SARANA LOGISTIK. Kementrian Perhubungan Republik Indonesia. https://dephub.go.id/post/read/perbaikan-dan-pembangunan-pelabuhan-dan-sarana-logistik-15267

Eriyatno. (1996). Ilmu Sistem. IPB Press.

Ho, M. W., & Ho, K. H. (2006). Risk management in large physical infrastructure investments: The context of seaport infrastructure development and investment. Maritime Economics and Logistics, 8(2), 140–168. https://doi.org/10.1057/palgrave.mel.9100153

Malaiholo, D., Kurniawan, M. A., & Anggraini, N. (2022). Analisa Pengendalian Biaya Dan Waktu Pada Pelaksanaan Proyek (Studi Kasus: Jalur Ganda Kereta Api Mojokerto-Jombang). Talenta Sipil, 5(1). https://doi.org/10.33087/talentasipil.v5i1.97

Musso, E., Ferrari, C., & Benacchio, M. (2006). Port Investment: Profitability, Economic Impact and Financing. Research in Transportation Economics, 16(06), 171–218. https://doi.org/10.1016/S0739-8859(06)16008-4

Nasrul, & Susanto, H. (2018). PENGENDALIAN PROYEK DITINJAU DARI SISI WAKTU DAN BIAYA ( Studi Kasus : Proyek Pembangunan Embung Tanjung Durian, Kecamatan Ranah Pesisir, Kabupaten Pesisir Selatan ). Jurnal Penelitian Dan Kajian Ilmiah, XII(10), 110–121.

Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509–526. https://doi.org/10.1080/01446191003674519

Rahman, I. A., Memon, A. H., Nagapan, S., Latif, Q. B. A. I., & Azis, A. A. A. (2012). Time and cost performance of costruction projects in southern and cenrtal regions of penisular Malaysia. CHUSER 2012 - 2012 IEEE Colloquium on Humanities, Science and Engineering Research, 1(1), 52–57. https://doi.org/10.1109/CHUSER.2012.6504280

Rifaldi, M., Sumargo, B., & Zid, M. (2021). PENERAPAN METODE INTERPRETATIVE STRUCTURAL MODELING (ISM) DALAM MENYUSUN STRATEGI PENGELOLAAN SAMPAH (Studi Kasus di Kabupaten Bekasi). Teknik Lingkungan, 2(1).

Sari, M. M., Hadi, T. S., & Aldiansyah. (2020). Faktor Penyebab Pembengkakan Biaya Yang Berpengaruh Terhadap Biaya Akhir Pada Proyek Konstruksi Gedung. Jurnal Infrastruktur, 6(1), 59–67. https://doi.org/https://doi.org/10.35814/infrastruktur.v6i1.1335

Sugiyono. (2013). Metode Pelitian Kuantitatif, Kualitatif, dan R&D (19th ed.). Alfabeta.

Thakkar, J., Deshmukh, S. G., Gupta, A. D., & Shankar, R. (2007). Development of a balanced scorecard: An integrated approach of Interpretive Structural Modeling (ISM) and Analytic Network Process (ANP). International Journal of Productivity and Performance Management, 56(1), 25–59. https://doi.org/10.1108/17410400710717073

Yansen, W. (2010). KORELASI ANTARA PENGENDALIAN KUALITAS RENCANA PELAKSANAAN DENGAN KINERJA PROYEK KONSTRUKSI (Studi Kasus Pada Satuan Kerja Non Vertikal Tertentu Pengembangan Kinerja Pengelolaan Air Minum Provinsi Nusa Tenggara Timur). Jurnal Ilmiah Teknik Sipil, 14(2), 188–197.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.971

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.