Rekomendasi Hasil Analisis Pengendalian Biaya Perbaikan Dermaga Apung di Pelabuhan Talang Duku, Jambi
Abstract
Keywords
Full Text:
PDFReferences
Arikunto, S. (2012). Prosedur Penelitian Suatu Pendekatan Praktik (P. R. Cipta (ed.)).
Azizah, S. U., Yamali, F. R., & Handayani, E. (2020). Analisa Nilai Hasil Terhadap Waktu pada Proyek Pembangunan Gedung Laboratorium FKIP Tahap IV (Lanjutan) Universitas Jambi. Talenta Sipil, 3(2), 95–103. https://doi.org/10.33087/talentasipil.v3i2.35
Bedje, M. R., Sompie, B. F., & Tarore, H. (2012). ANALISIS PENGARUH PENGENDALIAN KUALITAS PELAKSANAAN PROYEK DERMAGA MILIK PEMERINTAH DI SULAWESI UTARA. JURNAL ILMIAH MEDIA ENGINEERING, 2(4).
Biro Komunikasi dan Informasi Publik. (2012). PERBAIKAN DAN PEMBANGUNAN PELABUHAN DAN SARANA LOGISTIK. Kementrian Perhubungan Republik Indonesia. https://dephub.go.id/post/read/perbaikan-dan-pembangunan-pelabuhan-dan-sarana-logistik-15267
Eriyatno. (1996). Ilmu Sistem. IPB Press.
Ho, M. W., & Ho, K. H. (2006). Risk management in large physical infrastructure investments: The context of seaport infrastructure development and investment. Maritime Economics and Logistics, 8(2), 140–168. https://doi.org/10.1057/palgrave.mel.9100153
Malaiholo, D., Kurniawan, M. A., & Anggraini, N. (2022). Analisa Pengendalian Biaya Dan Waktu Pada Pelaksanaan Proyek (Studi Kasus: Jalur Ganda Kereta Api Mojokerto-Jombang). Talenta Sipil, 5(1). https://doi.org/10.33087/talentasipil.v5i1.97
Musso, E., Ferrari, C., & Benacchio, M. (2006). Port Investment: Profitability, Economic Impact and Financing. Research in Transportation Economics, 16(06), 171–218. https://doi.org/10.1016/S0739-8859(06)16008-4
Nasrul, & Susanto, H. (2018). PENGENDALIAN PROYEK DITINJAU DARI SISI WAKTU DAN BIAYA ( Studi Kasus : Proyek Pembangunan Embung Tanjung Durian, Kecamatan Ranah Pesisir, Kabupaten Pesisir Selatan ). Jurnal Penelitian Dan Kajian Ilmiah, XII(10), 110–121.
Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509–526. https://doi.org/10.1080/01446191003674519
Rahman, I. A., Memon, A. H., Nagapan, S., Latif, Q. B. A. I., & Azis, A. A. A. (2012). Time and cost performance of costruction projects in southern and cenrtal regions of penisular Malaysia. CHUSER 2012 - 2012 IEEE Colloquium on Humanities, Science and Engineering Research, 1(1), 52–57. https://doi.org/10.1109/CHUSER.2012.6504280
Rifaldi, M., Sumargo, B., & Zid, M. (2021). PENERAPAN METODE INTERPRETATIVE STRUCTURAL MODELING (ISM) DALAM MENYUSUN STRATEGI PENGELOLAAN SAMPAH (Studi Kasus di Kabupaten Bekasi). Teknik Lingkungan, 2(1).
Sari, M. M., Hadi, T. S., & Aldiansyah. (2020). Faktor Penyebab Pembengkakan Biaya Yang Berpengaruh Terhadap Biaya Akhir Pada Proyek Konstruksi Gedung. Jurnal Infrastruktur, 6(1), 59–67. https://doi.org/https://doi.org/10.35814/infrastruktur.v6i1.1335
Sugiyono. (2013). Metode Pelitian Kuantitatif, Kualitatif, dan R&D (19th ed.). Alfabeta.
Thakkar, J., Deshmukh, S. G., Gupta, A. D., & Shankar, R. (2007). Development of a balanced scorecard: An integrated approach of Interpretive Structural Modeling (ISM) and Analytic Network Process (ANP). International Journal of Productivity and Performance Management, 56(1), 25–59. https://doi.org/10.1108/17410400710717073
Yansen, W. (2010). KORELASI ANTARA PENGENDALIAN KUALITAS RENCANA PELAKSANAAN DENGAN KINERJA PROYEK KONSTRUKSI (Studi Kasus Pada Satuan Kerja Non Vertikal Tertentu Pengembangan Kinerja Pengelolaan Air Minum Provinsi Nusa Tenggara Timur). Jurnal Ilmiah Teknik Sipil, 14(2), 188–197.
DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.971
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |