Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja pada Proyek Pembangunan Universitas Terbuka Surabaya
Abstract
A construction project is an activity that has a time limit for implementation, activities in construction projects are temporary. Before the project begins, a period for the start and end of the work is usually set. Implementation of a management system that focuses on occupational health and safety (K3) is very necessary in ongoing construction projects. Currently, PT. Tunas Jaya Sanur is building the Open University of Surabaya, which calls for an effective management system for occupational health and safety. This is to make the workplace safe and comfortable for employees and to prevent and lessen the likelihood of work accidents. The research aims to analyze the implementation of K3 and K3 monitoring through questionnaires distributed to management staff, K3 staff, and field workers. The method used in this research is a quantitative method, using survey methods and statistical analysis. The research results show that in the development of the Open University of Surabaya has developed an excellent Occupational Safety and health management system as well as the classification of the level of achievement of respondents (TCR).
Keywords
Full Text:
PDFReferences
Abunawas, N. F. A. S. G. K. (2023). KONSEP UMUM POPULASI DAN SAMPEL DALAM PENELITIAN. JURNAL PILAR, 14(1), 15–31. https://doi.org/10.21070/2017/978-979-3401-73-7
Anggraini, R., Sugiarto, S., Sipil, M. T., Teknik, F., Aceh, B., Sipil, J. T., Teknik, F., & Aceh, B. (2019). PERJALANAN TERHADAP PEMILIHAN MODA ANGKUTAN UMUM RUTE BANDA ACEH – TAPAKTUAN. 2(4), 294–305.
Armalisa. (2021). METODE CRASHING TERHADAP PENAMBAHAN JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI. 1–18.
Damayanti, E. F., & Wahyuningsih, A. S. (2023). Determinan Tindakan Tidak Aman pada Pekerja Proyek. Indonesian Journal of Conservation, 12(1), 173–183. https://doi.org/10.15294/jsi.v12i1.41919
Ghozali. (2016). Aplikasi Analisis Multivariete SPSS 23. Badan Penerbit universitas Diponegoro.
Mauliddiyah, N. L. (2021). Pengaruh Kualitas Produk Dan Harga Produk Terhadap Keputusan Pembelian Produk Pada Ukm Maleo Lampung Timur. 1(3), 6.
Maulina, N., & Syafitri, L. (2019). DENGAN KELUHAN KELELAHAN MATA PADA PENJAHIT SEKTOR USAHA INFORMAL DI KECAMATAN BANDA SAKTI KOTA LHOKSEUMAWE TAHUN 2018. 5(2), 44–58.
Natalia. (2022). Gambaran Pelaksanaan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Di PT. PLN (Persero) Unit Pelaksana Pelayanan Pelanggan (UP3) Tolitoli. Jurnal KESMAS, 11(4), 35–43.
Peraturan Pemerintah (PP) Nomor 50 Tahun 2012 Tentang Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja, Pub. L. No. 50 (2012). https://peraturan.bpk.go.id/Details/5263/pp-no-50-tahun-2012
Puteri, E. P., Handayani, E., Zulfiati, R., Dwiretnani, A., & Dony, W. (2023). Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) dalam Pelaksanaan Proyek Konstruksi di Muara Sabak. Jurnal Talenta Sipil, 6(1), 163. https://doi.org/10.33087/talentasipil.v6i1.193
Rabukuntari. (2023). Pengaruh Usia dan Jenis Kelamin Terhadap Selera Menonton Tayangan Berita Menggunakan Metode Regresi Logistik Ordinal. Journal of Advances in Information and Industrial Technology, 5(1), 11–22. https://doi.org/10.52435/jaiit.v5i1.310
Rahmadeni, R. (2023). Pemodelan Status Gizi Balita Menggunakan Regresi Logistik Ordinal (Studi Kasus: Puskesmas Limapuluh Di Kota Pekanbaru). Jurnal Sains Matematika Dan Statistika, 9(2), 21. https://doi.org/10.24014/jsms.v9i2.19080
Rizal, M., & Darwis, M. (2022). Sosialisasi Keselamatan Dan Kesehatan Kerja (K3) Konstruksi Bagi Para Pelaku Konstruksi Pemula Di Kota Ternate. Journal Of Khairun Community Services (JKC), 2(2), 117–122.
Sanaky, M. M. (2021). Analisis Faktor-Faktor Keterlambatan Pada Proyek Pembangunan Gedung Asrama Man 1 Tulehu Maluku Tengah. Jurnal Simetrik, 11(1), 432–439. https://doi.org/10.31959/js.v11i1.615
Sari, E. P., & Sukardi, S. (2020). Optimalisasi Penggunaan E-learning dengan Model Delone dan McClean. Journal of Education Technology, 4(2), 141. https://doi.org/10.23887/jet.v4i2.24819
Sugiyono. (2019). Metode penelitian kuantitatif kualitatif dan R dan D / Sugiyono. Alfabeta.
Tumpia, A., Sam, U., & Manado, R. (2021). ANALISIS DESKRIPTIF FAKTOR-FAKTOR RESISTENSI INDIVIDU PADA PERUBAHAN ORGANISASI PT . PEGADAIAN ( PERSERO ) KANWIL V MANADO DESCRIPTIVE ANALYSIS OF INDIVIDUAL RESISTANCE FACTORS IN ORGANIZATIONAL CHANGES IN PT . PEGADAIAN ( PERSERO ) KANWIL V MANADO oleh : 9(2), 469–475.
Yulistina. (2020). Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja pada Proyek Pembangunan Gereja Mawar Sharon Surabaya PT. Tatamulia Nusantara Indah. Jurnal Teknik Sipil, 1(1), 13–18. https://doi.org/10.31284/j.jts.2020.v1i1.932
DOI: http://dx.doi.org/10.33087/talentasipil.v8i1.801
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |


