Analisis Perbandingan Produktivitas Tukang dan Pekerja Menggunakan Metode Time Study dan Analisis Harga Satuan Pekerjaan 2022
Abstract
The working time of handymen and workers before project implementation can be calculated from the labor coefficient in units of work quantity so that productivity can be known. However, between productivity based on the 2022 AHSP coefficient and field productivity often experience differences. This study aims to calculate the productivity of handymen and workers using the time study method and the comparison of the productivity of handymen and workers the time study method against the 2022 AHSP labor coefficient in the construction of projects in Palangka Raya City for red brick wall installation work. Data collection techniques with observation by recording work time and quantity of work as well as the number of handymen and workers. The data was analyzed using the time study method assisted by Microsoft Excel. The results showed that worker productivity: 6.38 m2⁄OH and handyman: 5.83 m2⁄OH. Comparison of work productivity using the time study method to the productivity of the 2022 AHSP coefficient in red brick wall installation work shows that worker productivity has a greater value and builders have a smaller value than productivity based on the 2022 AHSP coefficient.
Keywords
Full Text:
PDFReferences
Alami, N., Aziz, U. A., & Margiarti, D. (2021). Studi Komparasi Perbandingan Rencana Anggaran Biaya Antara Metode Analisa Harga Satuan Pekerjaan (AHSP) Dan Standar Nasional Indonesia (SNI). 5, 10.
Arifin, S., (2019). Analisa Produktivitas Pekerja Pada Pekerjaan Pasangan Batu Bata Di Perumahan Grand City Balikpapan. Jurnal Teknik Sipil Politeknik Negeri Balikpapan, Vol. 03(2).
Arya, I. Made Prana, I. Wayan Muka, and Ida Ayu Putu Sri Mahapatni. Perbandingan Waktu Dan Biaya Pada Pekerjaan Pasangan Dinding Dengan Metode Time Study Pada Proyek Konstruksi Gedung. Widya Teknik 13.01 (2020): 27-35.
Dai, D., Nuswantoro, W., & Purwantoro, A. (2012). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pembangunan Perumahan Di Palangka Raya (Studi Kasus Perumahan Pt. Permata Biru Membangun). Rekayasa Rancang Bangun, 13(2), 100–108.
ILO. (2023). Statistics on Labour Productivity. International Labour Organization.
Jaharman, J., & Armizoprades, A. (2021). (2021). Analisa Perbandingan Biaya Dan Waktu Pelaksanaan Dinding Bata Merah Dan Dinding Bata Ringan Pada Pembengunan Rumah Susun Institut Teknologi Padang. Journal of Applied Engineering Scienties, 4(2), 19–35.
Kartika, N., Robial, S. M., & Pratama, A. (2021). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Kolom Di Proyek Pembangunan Gedung Pemda Kabupaten Sukabumi. Jurnal Momen Teknik Sipil, Vol. 03(2).
Kementerian PUPR, Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 1 Tahun 2022 tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum dan Perumahan Rakyat. Republik Indonesia, 2022.
Marlina, L. (2018). Bab II Landasan Teori. In : Journal of Chemical Information and Modeling,pp. 7–19.
Setiawan, A., Sulaksono, A., Anggi, P.A.P.,& Husodo, I. T.(2022). Analisa Perbandingan Produktivitas Tenaga Kerja Aktual Pada Pekerjaan Kolom Dengan Analisa Harga Satuan Pekerjaan (AHSP). In : Science and Engineering National Seminar, Vol. 05(1),pp. 275-282.
Sinaga, William Swendy. Partogian, R. H. W. A. Z. (2016). Pengaruh Dimensi Ukuran Batu Bata Merah dan Campuran Mortar Terhadap Karakteristik Mekanik Pasangan Dinding. Jurusan Teknik Sipil Fakultas Teknik Universitas Brawijaya, 1(3).
Sugiyono. (2012). Populasi dan Spesimen Penelitian. UPI Edu, Vol .15(2).
Supusepa, A. D. D., Sumanti, F. P. Y., & Dundu, A. K. T. (2022). Analisis Rencana Anggaran Biaya Dan Waktu Pelaksanaan Pekerjaan Pada Pembangunan Gedung GKI Moses Wanggo Kecamatan Muara Tami, Jayapura. Tekno, 20(81), 169–178.
Tedja, M., Charleshan, C., & Efendi, J. (2014). Perbandingan Metode Konstruksi Dinding Bata Merah dengan Dinding Bata Ringan. ComTech: Computer, Mathematics and Engineering Applications, 5(1), 272.
Wibawa, S. P. R., Arya, I. W., & Yasada, G. (2022). Analisis Produktivitas Tenaga Kerja Pada Pengerjaan Pasangan Dinding Menggunakan Batu Bata Konvensional. Repositori Politeknik Negeri Bali.
DOI: http://dx.doi.org/10.33087/talentasipil.v7i2.598
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |