Identifikasi Bahaya Perencanaan Proyek Renovasi Gedung Hotel Horison Express Fatmawati Jakarta

Dhika Febrizal, Nia Kartika

Abstract


The implementation of construction development is an activity that causes many elements of danger, so it has a risk of work accidents. Factors that cause work accidents, ranging from a lack of employee discipline in maintaining occupational health and safety. This identification aims to assess the risks in the Planning of the Horison Express Hotel Building Renovation Fatmawati Jakarta, using a questionnaire with a frequency value (F) and a severity value (A), the results of the identification of the IBPRP method there are work items with a moderate level of risk in the Lt. 1-4 the relative risk value is obtained with a value of 9 (medium), and the work with a high level of risk is in the Lt. Structural Work. 5-6 relative risk values obtained Value of 20 (High), the results of the identification there are 58 basic events that cause the basic risk of 26 items of work, obtained a presentation of the value of low risk level of: 50%, moderate risk level of: 46.5%, and high risk level of: 3.5%. For hazard identification methods other than using the IBPRP method, can use other hazard identification methods for research on the same theme.


Keywords


Risk Identification; Frequensy Rate; Severety; Risk Level

Full Text:

PDF

References


M. Elfan, dkk. (2022). Analisis Potensi Kecelakaan Menggunakan Metode Hazard Identification and Risk Assessment (HIRA). Buletin Utama Teknik, Vol. 17 No.3

Tegar M.F. dkk. (2022). Analisis Pengrndalian Risiko Pada Proses Produksi Tower Segiempat (Fourangle) Dengan Metode HIRA. Jurnal Lingkungan Rekayasa, Vol. 22 No. 1

SP. Ridwan, D. Suhardi (2021), Sistem Perencanaan Manajemen Keselamatan Konstruksi (SMKK) Pada Perencanaan Struktur Bangunan Atas Gedung Hotel Eastern Lavande Bojonegoro. Seminar Kenisinyuran, e-ISSN Online 2797-1775

Fauzan A., dkk (2020), Usulan Perbaikan Penerapan sistem manajemen Keselamatan dan Kesehatan Kerja (SMK3) Pada Perusahaan konstruksi Jalan. JISI, Vol. 7 No.2

Julia A., dkk (2013), Pengaruh Penempatan dan Beban Kerja Terhadap Motivasi Kerja dan Dampaknya pada Prestasi Kerja Pegawai Dinas Tenaga Kerja dan Mobilitas Penduduk Aceh, Jurnal manajemen, Universitas Syiah Kuala, Vol. 2 No. 1

Dipohusodo, I. (1996). Manajemen Proyek Dan Konstruksi jilid I. Kanisius, Yogyakarta

Undang Undang No. 1 Tahun 1970 tentang Keselamatan Kerja.

Undang Undang No. 11 Tahun 2020 tentang Cipta Kerja.

Peraturan Pemerintah No. 50 Tahun 2012 Tentang Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja.

Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat No. 10 Tahun 2021 tentang Pedoman Sistem Manajemen Keselamatan Konstruksi.

Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat No. 14 Tahun 2021 tentang Pedoman Sistem Manajemen Keselamatan Konstruksi.

Kompas.com. (2022). PTPP Garap 3 Proyek Besar di Jakarta Gedung Kejagung hingga Renovasi TMII. Retrieved May, 2022. from https://money.kompas.com/read/2022/05/12/124836526/ptpp-garap-3-proyek-besar-di-jakarta-gedung-kejagung-hingga-renovasi-tmii?page=all

Dataindonesia.id (2022). Kasus Kecelakaan Kerja di Indonesia Alami Tren Meningkat. Retrieved, 2022 from https://dataindonesia.id/sektor-riil/detail/kasus-kecelakaan-kerja-di-indonesia-alami-tren-meningkat




DOI: http://dx.doi.org/10.33087/talentasipil.v6i1.143

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.