Prediksi Progres Aktual Proyek Konstruksi pada Tahap Awal Durasi Menggunakan Earned Value Management

Ery Alfred Ibrahim, Mardiaman Mardiaman

Abstract


This study is motivated by the limitations of previous research, which has predominantly focused on project performance evaluation during the execution or completion stages, while the capability of Earned Value Management (EVM) to predict project progress in the early phase remains underexplored. The objective of this study is to analyze and predict the actual progress performance of construction projects during the early stage of project duration. The research adopts a quantitative descriptive-analytical approach by utilizing key EVM indicators, namely Planned Value (PV), Earned Value (EV), and Schedule Performance Index (SPI), along with the development of a predictive model based on cumulative average performance (SPI_avg). The study was conducted on three public building construction projects with durations ranging from 52 to 68 weeks, with evaluation points set at 10% to 50% of the total project duration. The results indicate that the accuracy of the prediction model is highly influenced by the stability of SPI values during the early stage. Projects with stable performance produce lower prediction errors (approximately 20–45%), whereas projects with high performance fluctuations exhibit significantly higher errors (greater than 60%). Projects experiencing extreme acceleration in the early phase tend to produce overestimated predictions due to bias in SPI values. This study recommends the use of more adaptive prediction models, as well as the integration of complementary methods such as Earned Schedule, to improve prediction accuracy under fluctuating project conditions.

Keywords


earned value management, project progress, progress prediction, schedule performance index, construction project performance

Full Text:

PDF

References


Amruta B. Vyas, & B. V. Birajdar. (2016). Tracking of Construction Projects by Earned Value Management. International Journal of Engineering Research And, 5(03), 829–831. https://doi.org/10.17577/ijertv5is031318

Avlijaš, G. (2022). Using Earned Value Management for More Sustainable Project Schedule Control. Management Journal of Sustainable Business and Management Solutions in Emerging Economies, 1(1), 1–12. https://doi.org/10.7595/management.fon.2022.0011

Balali, A., Valipour, A., Antucheviciene, J., & Šaparauskas, J. (2020). Improving the Results of the Earned Value Management Technique Using Artificial Neural Networks in Construction Projects. Symmetry, 12(1745), 1–16. https://doi.org/10.3390/sym12101745

Ballesteros‐Pérez, P., Sanz‐Ablanedo, E., Mora-Meliá, D., González-Cruz, M. C., Bargues, J. L. F., & Pellicer, E. (2019). Earned Schedule Min-Max: Two New EVM Metrics for Monitoring and Controlling Projects. Automation in Construction, 103, 279–290. https://doi.org/10.1016/j.autcon.2019.03.016

Barrientos-Orellana, A., Ballesteros-Pérez, P., Mora-Melià, D., Cerezo-Narváez, A., & Gutiérrez-Bahamondes, J. H. (2023). Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management. Buildings, 13(1206), 1–18. https://doi.org/10.3390/ buildings13051206

Graciella, & Anondho, B. (2020). Prediksi Durasi Berbasis Earned Schedule Menggunakan Faktor Pengaruh Internal Dan Eksternal Serta Variabel Dummy. JMTS: Jurnal Mitra Teknik Sipil, 3(2), 289–298. https://doi.org/10.24912/jmts.v3i2.6990

Kim, B., & Pinto, J. K. (2019). What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion. Journal of Management in Engineering, 35(2). https://doi.org/10.1061/(asce)me.1943-5479.0000671

Mardiaman, & Indriasari. (2021). Faktor-Faktor Penentu Utama Keterlambatan Pada Pekerjaan Konstruksi Pabrik ( Studi Kasus : Pabrik Kawasan Cikarang ). E-Journal CENTECH 2020, 2(1), 1–11.

http://ejournal.uki.ac.id/index.php/cen

Mardiaman, & Kusuma, E. (2021). Study of Progress Expected Results Based on Percentage of Construction Work Plan Duration. Jurnal Teknik Sipil Universitas Islam Lamongan, 6(2), 167.

https://doi.org/10.30736/cvl.v6i2.628

Martens, A., & Vanhoucke, M. (2020). Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing. J. Manage. Eng., 36(5), 1–10. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000806

Naek, M., Mardiaman, & Azhar. (2023). Penentuan faktor keterlambatan waktu pelaksanaan proyek apbn/apbd dengan anggaran tahun tunggal untuk mengurangi klaim. Menara : Jurnal Teknik Sipil, 18(152), 96–109.

Narbaev, T., & Marco, A. De. (2013). An Earned Schedule-based regression model to improve cost estimate at completion. International Journal Of Project Management, 12(5), 1–12.

https://doi.org/10.1016/j.ijproman.2013.12.005

Nugraha, N. E., Handayani, F. S., & Setiono. (2024). Analisis Earned Value Terhadap Biaya Dan Waktu Gedung Direktorat Politeknik Pu Semarang Dengan Primavera P6. Jurnal Riset Rekayasa Sipil Universitas Sebelas Maret, 8(1), 10–17.

Ottaviani, F. M., Marco, A. De, Narbaev, T., & Rebuglio, M. (2024). Improving Project Estimates at Completion through Progress-Based Performance Factors. Buildings, 14(643), 1–22. https://doi.org/10.3390/ buildings14030643

Pascual, J. L., 2, J. C. M. R., & Rambaud, S. C. (2021). The Enhanced-Earned Value Management ( E-EVM ) Model : A Proposal for the Aerospace Industry. Symmetry, 13(232), 1–18.

https://doi.org/10.3390/sym13020232

Przywara, D., & Rak, A. (2021). Monitoring of time and cost variances of schedule using simple earned value method indicators. Applied Sciences (Switzerland), 11(4), 1–13. https://doi.org/10.3390/app11041357

Rinaldi, R., & Mardiaman. (2020). Analisis Kriteria Pemilihan Pemenang Tender Kontaktor Konstruksi di DKI Jakarta. Jurnal Teknik Sipil Universitas Teuku Umar, 6(2), 85–100.

Roberta, I., & Mardiaman. (2025). Evaluasi Perbandingan Kinerja Proyek Konstruksi Pabrik Kelapa Sawit Menggunakan Metode Earned Value : Studi Kasus Dua Proyek Pabrik Kelapa Sawit. Jurnal Arsip Rekayasa Sipil dan Perencanaan (JARSP), 8(3), 242–249. https://doi.org/10.24815/jarsp.v8i3.46033

Saifuddin, A., Ridwan, A., & Damara, B. (2025). Pengendalian Biaya dan Waktu Menggunakan Metode EVM (Earned Value Management) pada Proyek Pembangunan Akses Sirkulasi Lapangan Gajah Mada. Jurnal Talenta Sipil, 8(2), 755–762. https://doi.org/10.33087/talentasipil.v8i2.942

Sipala, L. O. M. A., Mardiaman, & Sukahar, A. G. (2026). Analisis Faktor Dominan Keterlambatan Waktu Pelaksanaan Proyek Rumah Susun Di Papua Barat Daya. Menara: Jurnal Teknik Sipil, 21(2), 59–66. https://doi.org/10.21009/jmenara.v21i2.65421

Widjaja, C. M., & Anondho, B. (2021). Validasi Batas Atas Batas Bawah Estimasi Durasi Gedung Konstruksi Bertingkat Berbasis Earned Schedule. Jurnal Muara Sains, Teknologi, Kedokteran, Dan Ilmu Kesehatan, 5(1), 103–110. https://doi.org/10.24912/jmstkik.v5i1.8746

Yang, J., & Lai, T.-H. (2023). Selecting EVM, ESM, and EDM(t) for Managing Construction Project Schedule. Engineering Construction & Architectural Management, 31(12), 4988–5006. https://doi.org/10.1108/ecam-02-2023-0115

Zalukhu, A. E., Zebua, D., Lase, C. A., Harefa, F. N., & Dermawan, F. (2024). Analisis Faktor Penyebab Pembengkakan Biaya Pada Proyek Konstruksi. IDENTIK: Jurnal Ilmu Ekonomi, Pendidikan Dan Teknik, 01(01), 38–47.




DOI: http://dx.doi.org/10.33087/talentasipil.v9i2.1374

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.