Prediksi Progres Aktual Proyek Konstruksi pada Tahap Awal Durasi Menggunakan Earned Value Management
Abstract
Keywords
Full Text:
PDFReferences
Amruta B. Vyas, & B. V. Birajdar. (2016). Tracking of Construction Projects by Earned Value Management. International Journal of Engineering Research And, 5(03), 829–831. https://doi.org/10.17577/ijertv5is031318
Avlijaš, G. (2022). Using Earned Value Management for More Sustainable Project Schedule Control. Management Journal of Sustainable Business and Management Solutions in Emerging Economies, 1(1), 1–12. https://doi.org/10.7595/management.fon.2022.0011
Balali, A., Valipour, A., Antucheviciene, J., & Šaparauskas, J. (2020). Improving the Results of the Earned Value Management Technique Using Artificial Neural Networks in Construction Projects. Symmetry, 12(1745), 1–16. https://doi.org/10.3390/sym12101745
Ballesteros‐Pérez, P., Sanz‐Ablanedo, E., Mora-Meliá, D., González-Cruz, M. C., Bargues, J. L. F., & Pellicer, E. (2019). Earned Schedule Min-Max: Two New EVM Metrics for Monitoring and Controlling Projects. Automation in Construction, 103, 279–290. https://doi.org/10.1016/j.autcon.2019.03.016
Barrientos-Orellana, A., Ballesteros-Pérez, P., Mora-Melià, D., Cerezo-Narváez, A., & Gutiérrez-Bahamondes, J. H. (2023). Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management. Buildings, 13(1206), 1–18. https://doi.org/10.3390/ buildings13051206
Graciella, & Anondho, B. (2020). Prediksi Durasi Berbasis Earned Schedule Menggunakan Faktor Pengaruh Internal Dan Eksternal Serta Variabel Dummy. JMTS: Jurnal Mitra Teknik Sipil, 3(2), 289–298. https://doi.org/10.24912/jmts.v3i2.6990
Kim, B., & Pinto, J. K. (2019). What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion. Journal of Management in Engineering, 35(2). https://doi.org/10.1061/(asce)me.1943-5479.0000671
Mardiaman, & Indriasari. (2021). Faktor-Faktor Penentu Utama Keterlambatan Pada Pekerjaan Konstruksi Pabrik ( Studi Kasus : Pabrik Kawasan Cikarang ). E-Journal CENTECH 2020, 2(1), 1–11.
http://ejournal.uki.ac.id/index.php/cen
Mardiaman, & Kusuma, E. (2021). Study of Progress Expected Results Based on Percentage of Construction Work Plan Duration. Jurnal Teknik Sipil Universitas Islam Lamongan, 6(2), 167.
https://doi.org/10.30736/cvl.v6i2.628
Martens, A., & Vanhoucke, M. (2020). Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing. J. Manage. Eng., 36(5), 1–10. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000806
Naek, M., Mardiaman, & Azhar. (2023). Penentuan faktor keterlambatan waktu pelaksanaan proyek apbn/apbd dengan anggaran tahun tunggal untuk mengurangi klaim. Menara : Jurnal Teknik Sipil, 18(152), 96–109.
Narbaev, T., & Marco, A. De. (2013). An Earned Schedule-based regression model to improve cost estimate at completion. International Journal Of Project Management, 12(5), 1–12.
https://doi.org/10.1016/j.ijproman.2013.12.005
Nugraha, N. E., Handayani, F. S., & Setiono. (2024). Analisis Earned Value Terhadap Biaya Dan Waktu Gedung Direktorat Politeknik Pu Semarang Dengan Primavera P6. Jurnal Riset Rekayasa Sipil Universitas Sebelas Maret, 8(1), 10–17.
Ottaviani, F. M., Marco, A. De, Narbaev, T., & Rebuglio, M. (2024). Improving Project Estimates at Completion through Progress-Based Performance Factors. Buildings, 14(643), 1–22. https://doi.org/10.3390/ buildings14030643
Pascual, J. L., 2, J. C. M. R., & Rambaud, S. C. (2021). The Enhanced-Earned Value Management ( E-EVM ) Model : A Proposal for the Aerospace Industry. Symmetry, 13(232), 1–18.
https://doi.org/10.3390/sym13020232
Przywara, D., & Rak, A. (2021). Monitoring of time and cost variances of schedule using simple earned value method indicators. Applied Sciences (Switzerland), 11(4), 1–13. https://doi.org/10.3390/app11041357
Rinaldi, R., & Mardiaman. (2020). Analisis Kriteria Pemilihan Pemenang Tender Kontaktor Konstruksi di DKI Jakarta. Jurnal Teknik Sipil Universitas Teuku Umar, 6(2), 85–100.
Roberta, I., & Mardiaman. (2025). Evaluasi Perbandingan Kinerja Proyek Konstruksi Pabrik Kelapa Sawit Menggunakan Metode Earned Value : Studi Kasus Dua Proyek Pabrik Kelapa Sawit. Jurnal Arsip Rekayasa Sipil dan Perencanaan (JARSP), 8(3), 242–249. https://doi.org/10.24815/jarsp.v8i3.46033
Saifuddin, A., Ridwan, A., & Damara, B. (2025). Pengendalian Biaya dan Waktu Menggunakan Metode EVM (Earned Value Management) pada Proyek Pembangunan Akses Sirkulasi Lapangan Gajah Mada. Jurnal Talenta Sipil, 8(2), 755–762. https://doi.org/10.33087/talentasipil.v8i2.942
Sipala, L. O. M. A., Mardiaman, & Sukahar, A. G. (2026). Analisis Faktor Dominan Keterlambatan Waktu Pelaksanaan Proyek Rumah Susun Di Papua Barat Daya. Menara: Jurnal Teknik Sipil, 21(2), 59–66. https://doi.org/10.21009/jmenara.v21i2.65421
Widjaja, C. M., & Anondho, B. (2021). Validasi Batas Atas Batas Bawah Estimasi Durasi Gedung Konstruksi Bertingkat Berbasis Earned Schedule. Jurnal Muara Sains, Teknologi, Kedokteran, Dan Ilmu Kesehatan, 5(1), 103–110. https://doi.org/10.24912/jmstkik.v5i1.8746
Yang, J., & Lai, T.-H. (2023). Selecting EVM, ESM, and EDM(t) for Managing Construction Project Schedule. Engineering Construction & Architectural Management, 31(12), 4988–5006. https://doi.org/10.1108/ecam-02-2023-0115
Zalukhu, A. E., Zebua, D., Lase, C. A., Harefa, F. N., & Dermawan, F. (2024). Analisis Faktor Penyebab Pembengkakan Biaya Pada Proyek Konstruksi. IDENTIK: Jurnal Ilmu Ekonomi, Pendidikan Dan Teknik, 01(01), 38–47.
DOI: http://dx.doi.org/10.33087/talentasipil.v9i2.1374
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |