Kinerja Proyek terhadap Efisiensi Waktu dan Biaya dalam Proyek Percepatan Konstruksi Pembangunan Gedung Kantor Kejaksaan Negeri Tual

Iren Sabina Lestia, Lenora Leuhery, Henriette Dorothy Titaley, M. Alit Suryawan

Abstract


Public construction projects frequently encounter challenges related to schedule delays and cost overruns, which can reduce overall project performance. These conditions require an integrated project control system to ensure that implementation remains aligned with planned schedules and budgets. One approach that can be applied is Earned Value Management (EVM), a performance evaluation method that integrates cost and schedule analysis simultaneously, enabling early detection of project deviations. This study aims to evaluate time and cost performance in the Acceleration Project of the Tual District Attorney Office Building Construction and to assess the effectiveness of the acceleration strategy implemented during project execution. The research method uses secondary data analysis consisting of the Bill of Quantities (BOQ), S-curve, weekly progress reports, and actual cost data. These data are analyzed using Planned Value (PV), Earned Value (EV), Actual Cost (AC), and performance indicators including the Cost Performance Index (CPI), Schedule Performance Index (SPI), and Critical Ratio (CR). The results indicate that the project was completed in 26 weeks compared to the planned 33 weeks, resulting in a time efficiency of 7 weeks with an SPI value greater than 1. Although cost inefficiency occurred during the early stages of implementation (CPI < 1), effective cost control measures successfully stabilized expenditures by the end of the project, resulting in CPI and CR values reaching 1. Based on these findings, the application of EVM is recommended as a routine monitoring method for accelerated construction projects to ensure more accurate, systematic, and data-driven control of project time and costs.

Keywords


Project Performance; Time Efficiency; Cost Efficiency; Construction Acceleration; Project Management; Building Construction; Project Scheduling.

Full Text:

PDF

References


Agitiya Wahyu, A., Gunasti, A., & Cahya Dewi, I. (2024). Standarisasi Kinerja Waktu Dan Biaya Dengan Metode Earned Value Pada Tahap Pekerjaan Struktur Proyek. Sustainable Civil Building Management And Engineering Journal, 1(1), 40. Https://Doi.Org/10.47134/Scbmej.V1i1.2138

Ariana, I. K. A., & Lestari, D. A. (2023). Analisis Kinerja Proyek Optimalisasi Spam Gatak Kabupaten Sukoharjo Dengan Metode Earned Value. Journal Of Integrated System, 6(1), 87–102. Https://Doi.Org/10.28932/Jis.V6i1.6521

Azizah, S. U., Yamali, F. R., & Handayani, E. (2020). Analisa Nilai Hasil Terhadap Waktu Pada Proyek Pembangunan Gedung Laboratorium Fkip Tahap Iv (Lanjutan) Universitas Jambi. Jurnal Talenta Sipil, 3(2), 95. Https://Doi.Org/10.33087/Talentasipil.V3i2.35

Fadlilah, M. H., & Romadhon, F. A. (2024). Penyebab Keterlambatan Pekerjaan Konstruksi Proyek Pembangunan Hotel Padma Semarang.

Handayani, E., Amalia, K. R., & Suryani, S. (2021). Analisis Perbandingan Produktivitas Tenaga Kerja Lokal Dengan Tenaga Kerja Yang Didatangkan Dari Luar Kota Jambi. Jurnal Talenta Sipil, 4(1), 66. Https://Doi.Org/10.33087/Talentasipil.V4i1.50

Hariyadi, S., Tjendani, H. T., & Witjaksana, B. (2024). Cost And Time Analysis Using The Earned Value Analysis Method. Eduvest - Journal Of Universal Studies, 4(9), 8273–8283. Https://Doi.Org/10.59188/Eduvest.V4i9.6402

Irawan, J., Rijaluddin, A., & Juliar, E. (2019). Analisa Pengendalian Biaya Dan Waktu Dengan Metode Konsep Nilai Hasil Pada Proyek Pembangunan Gedung Satpol Pp Kabupaten Majalengka. J-Ensitec, 5(02). Https://Doi.Org/10.31949/J-Ensitec.V5i02.1503

Kristiana, R. (2020). Penerapan Earned Value Analysis Sebagai Evaluasi Kinerja Proyek Dari Segi Biaya Dan Waktu. In Jurnal Teknik Sipil: Ix (Number 2).

Latuconsina, A. C., Saleh, M. La, & Gasperz, W. (2024). Analisa Pengendalian Biaya Dan Waktu Pelaksanaan Pada Proyek Pembangunan Ruang Kelas Baru Min 5 Maluku Tengah Dengan Menggunakan Metode Nilai Hasil. Journal Agregate, 3(1), 126–132.

Malaiholo, D., Kurniawan, M. A., & Anggraini, N. (2022). Analisa Pengendalian Biaya Dan Waktu Pada Pelaksanaan Proyek (Studi Kasus: Jalur Ganda Kereta Api Mojokerto-Jombang). Jurnal Talenta Sipil, 5(1), 49. Https://Doi.Org/10.33087/Talentasipil.V5i1.97

Marini Indriani, A., Utomo, G., & Rizqy, M. (2022). Analisis Kinerja Waktu Dan Biaya Proyek Konstruksi Dengan Metode Earned Value Analysis. Jurnal Geoekonomi, 13(2), 128–137. Https://Doi.Org/10.36277/Geoekonomi.V13i2.219

Maya Sari, H., Hendriyani, I., & Ersa Widyaningrum, A. (2021). Earned Value Analysis Pada Proyek Pembangunan Gedung Arsip Kantor Bpn. Jurnal Ilmiah Teknik Sipil Transukma, 3(2), 154–167. Https://Doi.Org/10.36277/Transukma.V3i2.84

Sri Mahapatni, I. A. P., Putra, C., & Murwanta, K. E. (2022). Analisis Kinerja Waktu Dan Biaya Pelaksanaan Proyek Dengan Metode Earned Value Pada Proyek Pembangunan Jembatan Pangkung Dalem Ruas Jalan Gitgit-Wanagiri. Jurnal Ilmiah Kurva Teknik, 11(2), 17–25. Https://Doi.Org/10.36733/Jikt.V11i2.5424

Sukindrawati, B., Kartika, W., & Sarju, S. (2023). Evaluasi Kinerja Waktu Dengan Metode Konsep Nilai Hasil. Menara: Jurnal Teknik Sipil, 18(2), 110–114. Https://Doi.Org/10.21009/Jmenara.V18i2.36648

Sumatha, N. G. I., Wangsa, R. R. A. A., Praganingrum, I. T., & Lovianti, M. P. (2023). Kinerja Biaya Dan Waktu Proyek Dengan Metode Earned Value Management. Journal Teknik Gradien, 15(2), 39–48. Http://Www.Ojs.Unr.Ac.Id/Index.Php/Teknikgradien




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1189

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.