Manajemen Risiko Kesehatan, Keselamatan, Kerja dan Lingkungan (K3L) pada Proyek Pembangunan Embung Tukad Unda Provinsi Bali
Abstract
The construction work of the Tukad Unda Reservoir is located in a former sand quarry area characterized by water-filled pits and unstable coral aggregates. This area also serves as a lahar flow path during eruptions of Mount Agung, which remains active. This condition was identified through geological and geotechnical sampling tests. The aim of this study is to analyze the Occupational Health, Safety, and Environment (HSE) risks that can be identified in this project. Data were collected through interviews, brainstorming sessions, and field observations. Risk coefficients were scored based on risk acceptability. The assessment focused on dominant risks that require management actions, specifically those categorized as “high” and “very high” risk levels. The final identification results revealed a total of 75 risks based on the type of work, consisting of 28 risks (37%) in sub-structural work, 41 (55%) in structural activities, and 6 (8%) in architectural activities. Based on the sources of risk, 26 risks (35%) originated from equipment, 27 (36%) from materials, and 22 (29%) from environmental factors. In terms of impact targets, 64 risks (85%) affect humans, 10 (13%) affect both humans and the environment, and 1 (1%) affects the environment alone. Based on the analysis using the AS/NZS 4360:2004 standard, 17 risks (23%) were classified as low risk, 39 (52%) as medium risk, and 19 (25%) as high risk. Risk ownership was predominantly allocated to the contractor's HSE supervisors (56%), followed by site managers (35%) and technical staff (9%). It is recommended that competent and authorized personnel at the project site conduct safety briefings before commencing any work activities to minimize the potential for unwanted incidents. Workers are also advised to pay more attention to occupational health and safety by wearing appropriate personal protective equipment (PPE) and complying with all established regulations and standard operating procedures (SOPs).
Keywords
Full Text:
PDFReferences
Bachtiar, E., Mahyuddin, M., Nur, N., Tumpu, M., Rosyidah, M., Setiawan, A., & Mukrim, M. (2021). Manajemen K3 Konstruksi.
Balai Wilayah Sungai Bali - Penida. (2017). Laporan Akhir Tukad Unda. Balai Wilayah Sungai Bali.
Bayu Dharma, A. A., Adnyana Putera, I. G. A., & Parami Dewi, A. A. D. (2017). Manajemen Risiko Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Jambuluwuk Hotel & Resort Petitenget. Jurnal Spektran, 5(1). https://doi.org/10.24843/spektran.2017.v05.i01.p06
D.N.Sc, H., & El-sayed Ebied, E. (2018). Occupational Health Hazards as Perceived by Poultry Processing Slaughterhouse Workers. The Medical Journal of Cairo University, 86, 1129–1138. https://doi.org/10.21608/mjcu.2018.56127
Dewi, R. N. (2023). Occupational Health and Safety Risk Analysis Using AS/NZS 4360:2004 in a Fish Meatball Industry. Jurnal Teknik Industri, Politeknik Jembrana, 25(1), 31–42. https://doi.org/https://doi.org/10.9744/jti.25.1.31-42
Hartono, W., Handayani, D., & Hapsari, A. N. (2023). Analisis Manajemen Risiko Kecelakaan Kerja pada Pekerjaan Fondasi dan Pile Cap Proyek Konstruksi Jembatan Beton. Jurnal Matriks Teknik Sipil, 11(3), 277–283. https://doi.org/https://doi.org/10.20961/mateksi.v11i3.76705
Odakkal, R. (2007). Risk Management Guidelines Companion to AS/NZS 4360:2004. Standards Australia International Ltd.
Peraturan Menteri Tenaga Kerja Dan Transmigrasi Republik Indonesia (2010). https://jdih.kemnaker.go.id/asset/data_puu/peraturan_file_PER08.pdf
Puteri, E. P., Handayani, E., & Zulfiati, R. (2023). Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) dalam Pelaksanaan Proyek Konstruksi di Muara Sabak. Jurnal Talenta Sipil, 6(1). https://doi.org/10.33087/talentasipil.v6i1.193
Ramli, S. (2010). Sistem Manajemen Keselamatan dan Kesehatan Kerja OHSAS 18001 / Soehatman Ramli. In Ed. 1 (p. 257). Dian Rakyat. https://simpus.mkri.id/opac/detail-opac?id=7231
Sari, D., Pujotomo, D., & Wardani, N. (2017). Risk analysis using AS/NZS 4360:2004, Bow-Tie diagram and ALARP on construction projects of Banyumanik Hospital. In AIP Conference Proceedings (Vol. 1902). https://doi.org/10.1063/1.5010630
Selamat, Nafryzal, C., & Utama, L. (2025). Analisis Risiko terhadap Keselamatan dan Kesehatan Kerja dalam Proses Penggantian Katalis di Butane Treater di PT. X. Jurnal Talenta Sipil, 8(1), 466–477. https://doi.org/10.33087/talentasipil.v8i1.675
Shima, R. D., Puspadewi, S., & Hazairin, H. (2023). Kajian Variabel Risiko Kecelakaan Kerja dan Upaya Mitigasi Risiko Berdasarkan pada Proyek Pembangunan SUTT 150 kV di Kota X Berdasarkan Standar AS/NZS 4360:2004. RekaRacana: Jurnal Teknik Sipil, 9(3). https://doi.org/https://doi.org/10.26760/rekaracana.v9i3.186
Siregar, S. (2017). Metode Penelitian Kuantitatif (4th ed.). Kencana. https://books.google.co.id/books?id=IjTMDwAAQBAJ&printsec=frontcover&hl=id&source=gbs_ge_summary_r&cad=0#v=onepage&q&f=false
Sistem Manajemen Keselamatan Dan Kesehatan Kerja (1996). https://k3.um.ac.id/wp-content/uploads/2019/04/Permen-Kemen-Tenaga-Kerja-No.-05-Tahun-1996-Sistem-Manajemen-K3.pdf
Sugiyono. (2013). Metode penelitian pendidikan pendekatan kuantitatif, kualitatif dan R&D. Alfabeta.
Undang-Undang Republik Indonesia Nomor 1 Tahun 1970 Tentang Keselamatan Kerja (1970). https://jdih.esdm.go.id/common/dokumen-external/uu-01-1970.pdf
Wiyasa, I. W., Adnyana Putera, I. G. A., & Nadiasa, M. (2015). Manajemen Risiko Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Ciputra World Jakarta. In Jurnal Spektran. Jurnal Spektran. https://doi.org/10.24843/spektran.2015.v03.i01.p01
DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.982
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |