Analisis Produktivitas Tenaga Kerja dengan Metode Time Study pada Proyek Pedestrian Depan Stadion Surajaya Lamongan
Abstract
Human resources are very important in the work environment, especially in the construction sector. Without a qualified and productive workforce, the project results will not be satisfactory. This research aims to observe the productivity of workers while constructing the pedestrian in front of the Surajaya Stadium in Lamongan, focusing on rebar work, formwork installation, and concreting using the time study method. The initial stage involves analyzing the project and collecting data that will be used as material for observing labor productivity. The productivity for foundation rebar work is recorded at 134.86 kg/person/day, and for column rebar work at 96.84 kg/person/day. The productivity value for formwork also varies, reaching 351.82 m²/person/day for slab formwork work.. Casting work has varying productivity, for example 9.10 m3/person/day for foundation casting. Several factors that affect productivity are the lack of worker skills, hot weather, and obstacles at the project site. The productivity of rebar work, formwork installation, and casting in this project is low due to the lack of worker skills, hot weather causing fatigue, and access barriers. To improve efficiency, training for workers, scheduling work hours, and managing the surrounding environment are necessary.
Keywords
Full Text:
PDFReferences
Efendi, A., Dwiretnani, A., & Setiawan, A. (2022). Analisa Penjadwalan Proyek dengan Menggunakan Metode Line Of Balance (LOB) pada Proyek Pedestrian Jl. MH. Thamrin-Jl. Halim Perdana Kusuma. Jurnal Talenta Sipil, 5(2), 346.
Fikri, H. (2023). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Struktur Atas. 44–50.
Inovatif, J. M., Haryanto, M. P., Roberth, H. H., Soumokil, M. D., Ambon, P. N., & Study, T. (2025).
Irpan. (2021). Analisa Produktivitas Pekerja Dengan Metode Time Study Pada Proyek Pembangunan Gedung Rumah Sakit Pertamina Tarakan. 1–128.
Iskandar, D. N., & Pranata, G. (2024). Analisis Produktivitas Tenaga Kerja Pada Pengerjaan Kolom Di Proyek Dnl. JMTS: Jurnal Mitra Teknik Sipil, 7(1), 321–328. https://doi.org/10.24912/jmts.v7i1.26716
Maharani, R. K., & Yunita, S. D. (2021). Analisis Keterlambatan Proyek Jalur Pejalan Kaki (Studi Kasus: Jalur Pedestrian Jalan Kandang Roda – Pakansari). Jurnal Teknik Sipil, 2(2), 34–40.
Malamassam, L. (2016). Analisa Produktivitas Pekerja Dengan Metode Time Study Pada Proyek Pembangunan Gedung Teknik Industri ITS. Jurnal Produktivitas Pekerja Dengan Metode Time Study Pada Proyek Pembangunan Gedung Teknik Industri ITS, 157.
Pramana, I. M. W., Arya, I. W., & Wiraga, I. W. (2023). Jurnal Talenta Sipil. 6(2), 328–335.
Rahmadiani, Pramanda, H., Ariansyah, D., & Kurniasari, F. D. (2023). Analisa Produktivitas Tenaga Kerja Terhadap Biaya Dan Waktu Pelaksanaan Proyek Pusdalops Tahap III Kota Banda Aceh. Journal of Planning and Research in Civil Engineering, 2(2), 228–235.
Sandi, C. K., Cahyono, N., Husodo, I. T., & Permata Suwandi, P. A. (2020). Analisis Produktivitas Pekerja Dengan Metode Time Study Pada Pekerjaan Kolom (Studi Kasus Proyek Rehabilitasi Pasar Johar Kota Semarang). Jurnal Teknik Sipil Giratory UPGRIS, 1(1), 1–10. https://doi.org/10.26877/giratory.v1i1.5421
Saputra, R. A., & Kabdiyono, E. A. (2022). Percepatan Pelaksanaan Pembangunan Pedestrian Di Kawasan X Jakarta Selatan Dengan Metode Time Cost Trade Off. Jurnal Tera, 2(1), 98–107.
Setiawardani Alifen, Ratna Alexandernius, Kelvin Kustanto, R. (2022). Apartemen Menggunakan Metode Time Study. 64–70.
SHELEMO, A. A. (2023). Nucl. Phys., 13(1), 104–116.
Syahrul, A. F. R., & Adistama, G. A. Y. P. (2018). Produktivitas Pekerja Pada Pekerjaan Bata Ringan Dengan Metode Time Study Pada Bangunan Gedung Bertingkat Di Surabaya. Rekayasa Teknik Sipil, 3(3), 1–10.
Tarip, T. (2024). Media Ilmiah Teknik Sipil , Volume 12 , Nomor 1 , Januari 2024 : 8-20 Media Ilmiah Teknik Sipil , Volume 12 , Nomor 1 , Januari 2024 : 8-20. Media Ilmiah Teknik Sipil, 12(1), 8–20.
DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.961
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |