Perataan Jumlah Tenaga Kerja pada Proyek Perencanaan Pembangunan Guest House dengan Microsoft Project

Febriani Febriani, Reno Pratiwi, Suheriah Mulia Devi

Abstract


Labor leveling in construction projects is a crucial strategy to optimize resources, improve work efficiency, and reduce excessive workforce fluctuations. However, this aspect is often overlooked due to the project's primary focus on timely completion rather than efficient labor utilization. This study aims to analyze the effectiveness of labor leveling in enhancing construction project efficiency. The method used is a case study of a Guest House construction project in Balikpapan with a total area of 1,514.875 m² and a duration of 308 calendar days. Microsoft Project was used to perform resource leveling through task rescheduling. The results showed that before leveling, the maximum number of workers reached 157 with uneven distribution. After leveling, the peak workforce was reduced to 125 workers, with the highest concentration occurring in week 15. Although it had no direct impact on labor wages, the implementation of leveling successfully reduced transportation and accommodation costs from Rp 1,886,830,000 to Rp 455,569,000. Therefore, labor leveling is proven to improve project efficiency and reduce potential resource waste in construction projects.

Keywords


Workforce Levelling; Construction Project; Resource Levelling; Microsoft Project; Cost Efficiency.

Full Text:

PDF

References


Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2023). Analisa harga satuan pekerjaan (AHSP) konstruksi tahun 2023.

Dimyati, D., Supriyadi, M., & Kurniawan, B. (2014). Manajemen proyek konstruksi. Andi.

Hamilton, A. (1997). Project scheduling and control. McGraw-Hill.

Hansen, D. R., & Mowen, M. M. (2009). Managerial accounting (8th ed.). South-Western College Pub.

Heizer, J., Render, B., & Munson, C. (2016). Operations management: Sustainability and supply chain management (12th ed.). Pearson Education Limited.

Mahapatni, M. (2019). Construction planning and management. PHI Learning Private Limited.

Mardiasmo. (2002). Akuntansi sektor publik. Andi.

Meredith, J. R., & Mantel, S. J. (2010). Project management: A managerial approach (8th ed.). Wiley.

Mursyidi. (2008). Akuntansi biaya. Refika Aditama.

Pandya, B. H., Raval, J. J., & Makwana, R. B. (2024). Analysis of resource levelling technique using MS Project. International Journal of Creative Research Thoughts (IJCRT), 12(2), 545–552.

Patton, M. Q. (2002). Qualitative research & evaluation methods (3rd ed.). Sage Publications.

Prawirosentono, S. (2007). Manajemen operasi. Bumi Aksara.

Putri Alnisa, S., Pratama, H., & Yuliani, R. (2024). Analisis produktivitas tukang dan pekerja dalam menentukan kebutuhan biaya tenaga kerja. Jurnal Talenta Sipil, 7(1), 45–52.

Soeharto, I. (1999). Manajemen proyek: Dari konseptual sampai operasional. Erlangga.

Suputra, I. G. N. O. (2012). Manajemen proyek konstruksi: Teori dan praktik. Graha Ilmu.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.958

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.