Studi Perbandingan Produktivitas Teori dan Realitas pada Pekerjaan Konstruksi Keselamatan Pesisir di Teluk Jakarta Tahap 6 Paket 4

Kurniawan Widhitomo, Moh Azhar, Mardiaman Mardiaman

Abstract


Coastal protection infrastructure in Jakarta Bay is essential to mitigate flooding due to sea level rise and land subsidence. The use of spun piles with inner boring methods supported by Hydraulic Static Pile Driver (HSPD) technology is intended to ensure efficient and low-impact pile driving operations. However, in practice, productivity discrepancies between theoretical planning and field realization remain a significant issue. This study aims to analyze and compare theoretical productivity (based on contractual planning) with actual field productivity in the installation of spun piles for a coastal safety project in Jakarta Bay Phase 6 Package 4. A descriptive quantitative approach was used, combining direct field observations, time-lapse video analysis, and secondary data from contract documents. Productivity was measured in meters per hour (m/h) and piles per day (piles/day). Deviations between theoretical and actual productivity were identified, and causal factors were analyzed. Theoretical productivity was 3.59 m/h with 3.5 piles/day, while actual field productivity reached only 3.2 m/h with 3.33 piles/day. This discrepancy resulted in an estimated delay of 5 workdays (4.8% deviation). The primary contributing factors were inconsistent hydraulic pressure, environmental constraints, equipment limitations, and varying operator skill levels. The study confirms that real-time monitoring and productivity assessment tools are crucial for timely project delivery. It also highlights the need for adaptive planning and systematic operator training. The findings provide practical guidance for enhancing productivity in future coastal foundation projects using HSPD technology.


Keywords


Piling Productivity, Hydraulic Static Pile Driver, Inner Boring System, Coastal Safety, Time Study

Full Text:

PDF

References


Abdel-hamid, Mohamed, and Hanaa Mohamed Abdelhaleem. 2020. “Impact of Poor Labor Productivity on Construction Project Cost.” International Journal of Construction Management 0 (0): 1–8. https://doi.org/10.1080/15623599.2020.1788757.

Ahmed, Minhaz, and Wang Xu. 2023. “Investigation of Pile Construction and Productivity Loss: An Analysis of Macro Impact Factor.” World Journal of Engineering and Technology 11 (04): 932–64. https://doi.org/10.4236/wjet.2023.114062.

Chen, Keyu, Jianfei Yang, Jack C P Cheng, Weiwei Chen, and Chun Ting. 2020. “Automation in Construction Transfer Learning Enhanced AR Spatial Registration for Facility Maintenance Management.” Automation in Construction 113 (February): 103135. https://doi.org/10.1016/j.autcon.2020.103135.

Dwiretnani, Annisaa, and Indra Agustian Daulay. 2019. “Kinerja Alat Hydraulic Static Pile Driver (HSPD) Pada Proyek Perluasan Terminal Bandara Sultan Thaha Jambi.” Jurnal Talenta Sipil 2 (2): 67. https://doi.org/10.33087/talentasipil.v2i2.20.

Hakim, Arif Rahman. 2018. “Analisis Produktivitas Hydraulic Static Pile Driver Pada Pembangunan Apartemen Victoria Square Tower B Tangerang Banten.” Jurnal Teknik Sipil Jurnal Teorities Dan Terapan Bidang Rekayasa Sipil 25 (2): 103–12. https://doi.org/10.5614/jts.2018.25.2.3.

Hakim, Arif Rahman, and Amirul Akbar. 2018. “Analisis Produktivitas Hydraulic Static Pile Driver Pada Pembangunan Apartemen Victoria Square Tower B Tangerang Banten.” Jurnal Teknik Sipil 25 (2): 103. https://doi.org/10.5614/jts.2018.25.2.3.

Limanto, Sentosa. 2009. “Analisis Produktivitas Pemancangan Tiang Pancang Pada Bangunan Tinggi Apartemen.” In Seminar Nasional, 293–305.

Limanto, Sentosa. 2018. “Analisis Produktivitas Pemancangan Tiang Pancang Pada Bangunan Tinggi Apartemen.” In Seminar Nasional 2009 – Jurusan Teknik Sipil, FT-UKM, 15 Agustus 2009 ANALISIS, 2009.

Pratama, Muhammad Indra, and Adwitya Bhaskara. 2020. “Komparasi Biaya Dan Waktu Pekerjaan Tiang Pancang Metode Hydraulic Static Pile Driver Dengan Drop Hammer.” Reviews in Civil Engineering 4 (2): 62–68. https://doi.org/10.31002/rice.v4i2.3038.

Primaswari, Gitaning, Agung Bhakti Utama, and Galih Adya Taurano. 2022. “Hydraulic Static Pile Driver.” ORBITH 18 (1): 11–21. https://doi.org/https://doi.org/10.32497/orbith.v18i1.3559.

Primaswari, Gitaning, and Adityo Budi Utomo. 2022. “Hydraulic Static Pile Driver.” ORBITH 18 (2): 98–108.

Puspitasari, Melati, and Afrizal Nursin. 2021. “Analisis Produktivitas Alat Pancang Hydraulic Static Pile Driver Untuk Meningkatkan Kinerja Waktu Pada Proyek Apartemen Apple 3 Condovilla.” Construction and Material Journal 3 (3): 207–17. https://doi.org/10.32722/cmj.v3i3.4162.

Salim, Mukhamad Afif, and Agus Bambang Siswanto. 2023. “Analisis Perbandingan Metode Pemancangan Dengan Diesel Hammer Dan Hydraulic Static Pile Driver.” Journal of Civil Engineering and Technology Sciences 1 (2): 13–24. https://doi.org/10.56444/jcets.v1i2.

Saputra, Erlan, and Trijeti Halim. 2011. “Produktivitas Alat Pancang Terhadap Analisa Waktu Pada Pekerjaan Banjir Kanal Timur.” Konstruksia 2 (2): 43–51.

Shang, Gao, Low Sui Pheng, and Wee Jia Hui. 2018. “Drivers and Barriers for Multiskilling Workers in the Singapore Construction Industry.” International Journal of Construction Management 0 (0): 1–16. https://doi.org/10.1080/15623599.2018.1484851.

Siregar, Adde Currie, Santi Yatnikasari, Fitriyati Agustina, Vebrian Vebrian, and Muhammad Jalil. 2023. “Analisis Perbandingan Produktivitas Alat Pancang Drop Hammer Dan Jack in Pile Proyek Pembangunan SMAN 14 Samarinda.” Jurnal Teknik Sipil 19 (2): 174–84. https://doi.org/10.28932/jts.v19i2.5344.

Syahruddin, Safarudin, and Albert Stanley Michelim. 2022. “Comparative Study of the Use of Hydraulic Pile Driver and Crane Mounted Drop Hammer in the Piling of Precast Prestressed Concrete Piles for Building Foundations in Kubu Raya Regency.” Journal of Civil Engineering University of Tanjungpura 22 (2): 164–74.

Syahrudin, Syahrudin, Nuh M. Safaruddin, Soeryamassoeka B S, and Sutandar Erwin. 2022. “Study Of Productivity And Costs On The Implementation Method Of Foundation Work Using Precast Concrete Pile As A Substitute To The Use Of Wooden Pile Foundations In Low Rise Building (Housing).” Jurnal Teknik Sipil 22 (1): 41. https://doi.org/10.26418/jtst.v22i1.55158.

Yanuar, Setiyo Ferdi, Hilfi Harisan Ahmad, and lanka Cahya Dew. 2024. “Analisa Biaya Pekerjaan Pemancangan CCSP Di Hulu Bendung.” Jurnal EXTRAPOLASI 21 (1): 79–93.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.952

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.