Manajemen Biaya dan Waktu Pelaksanaan Proyek Pembangunan Co-Working Space Kabupaten Lamongan

Rasio Hepiyanto, Rio Rahma Dhana, Andreyas Dian Febrianto

Abstract


In construction projects, particularly in the development of the Co-Working Space in Lamongan Regency, discrepancies between the planned schedule and actual outcomes often occur, both in terms of time and cost. This is generally caused by ineffective planning and control during project execution. This study aims to analyze cost and time management of the project to achieve more efficient and timely implementation. The research method applies the Critical Path Method (CPM) as the primary approach to determine the critical path and minimum project duration, complemented by the Program Evaluation and Review Technique (PERT) to estimate time uncertainties. The results show that using CPM, the critical path involves activities A, B, D, F, G, E, V, X, AA, AB, AD, AE, AG, AK, AT, BA, AU, AV, AY, BB, BD, AZ, BH, and BE with a total duration of 136 days, saving 22 days from the initial plan of 158 days. Using PERT with the same critical path, the project is estimated to be completed in 148 days, saving 10 days, with a cumulative distribution value of 3.7, indicating a 99.98% probability of project completion before the target date. In conclusion, CPM and PERT are effective for controlling project cost and time, with CPM providing greater time efficiency.

Keywords


Time; Cost; Project; Acceleration; Network; CPM; PERT.

Full Text:

PDF

References


Castollani, Alief, and Sarjono Puro. 2020. “Analisis Biaya Dan Waktu Pada Proyek Apartemen Dengan Metode Earned Value Concept.” Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS) 3(1): 39–48. doi:10.54367/jrkms.v3i1.701.

Dwiretnani, Annisaa, Elvira Handayani, and Niko Saputra. 2023. “Evaluasi Penjadwalan Waktu Proyek Pembangunan Gedung Menggunakan Critical Path Method (CPM).” Jurnal Talenta Sipil 6(2): 391. doi:10.33087/talentasipil.v6i2.334.

Fahrian, Budi Haryanto, and Mardewi Jamal. 2021. “Perbandingan Penjadwalan Proyek Dengan Metode PDM (Precedence Diagram Method) & CPM (Critical Path Method) (Studi Kasus: Lanjutan Pembangunan Proyek Gedung SD Islamic Center Samarinda).” Jurnal Teknologi Sipil 5(2): 17–25.

Iluk, Tsalist, Ahmad Ridwan, and Sigit Winarto. 2020. “JURMATEKS Penerapan Metode CPM Dan PERT Pada Gedung Parkir 3 Lantai Grand.” 3(2). doi:10.1016/j.sbspro.2015.11.378.A.

Ir. Iman Soeharto. 1999. “Manajemen Proyek Jilid 1 (Dari Konseptual Sampai Operasional).” Manajemen Proyek Jilid 1 (Dari Konseptual sampai Operasional). doi:10.3938/jkps.60.674.

Iriyanto, S. M., and A. Y. Rarung. 2019. “Analisa Efektivitas Penjadwalan Proyek Rumah Susun Papua 1 Dengan Metode Pert.” Jurnal PORTAL SIPIL 8(2): 1–11.

Ma’rifatul Muniroh, Meidy Kempa, and C.G. Buyang. 2021. “Pengendalian Biaya Dan Waktu Dengan Earned Value Concept Pada Proyek Penataan Bangunan.” Jurnal Simetrik 11(1): 404–10.

Maulidi, Ahmad, Syamsul Arifin, and Hernu Suyoso. 2021. “Penjadwalan Proyek Konstruksi Menggunakan Critical Path Method (Studi Kasus: Gedung Laboratorium Terpadu Fakultas Teknik Universitas Jember).” Jurnal Ilmiah MITSU 9(1): 1–8. doi:10.24929/ft.v9i1.992.

Nudja S, I Ketut Nudja. 2016. “Perencanaan Kebutuhan Dan Penjadwalan Sumber Daya Pada Pelaksanaan Proyek Konstruksi.” Paduraksa 5(2): 13–23.

Perwitasari, Dian, Ahmad Fahreza, and Kirana R. Ririh. 2021. “Analisis Percepatan Waktu Proyek Perumahan Menggunakan Metode PERT Dan Fast Track.” RekaRacana: Jurnal Teknil Sipil. doi:10.26760/rekaracana.v7i1.226.

Ramadhani, Ivan Dwi, Isnaini Zulkarnain, Adde Currie Siregar, and Dheka Shara Pratiwi. 2023. “Optimasi Penjadwalan Proyek Menggunakan Metode CPM (Studi Kasus: Pembangunan Jalan Sungai Manggis, Kecamatan Sambutan, Samarinda).” Journal of Civil Engineering, Building and Transportation 7(2): 1–6. https://ojs.uma.ac.id/index.php/jcebt/article/view/10311%0Ahttps://ojs.uma.ac.id/index.php/jcebt/article/download/10311/5172.

Ruiz Jaramillo, Raimer Lartsimin, and Heyner Yuliano Marquez Yauri. 2022. “Changes in the PMBOK Guide of the Project Management Institute, Its Certification and Application in Project Management: A Systematic Literature Review.” Sciéndo 25(4): 437–43. doi:10.17268/sciendo.2022.055.

Utomo, Fajar Prasetyo, and Mulyono. 2021. “Penjadwalan Ulang Proyek Konstruksi Menggunakan Metode PDM Dan CPM (Studi Kasus Pada Pembangunan Toserba Yogya Di Pekalongan).” Ujm 10(1): 63–72. http://journal.unnes.ac.id/sju/index.php/ujm.

Wahyudi, M Rizal, and Astuti Boer. 2019. “Tingkat Efisiensi Biaya Pekerjaan Bekisting Struktur Core Wall Menggunakan Metode Semi Sistem Dan Climbing System Terhadap Metode Konvensional (Studi Kasus: Proyek Pembangunan Menara Bank Rakyat Indonesia Pekanbaru).” JURNAL SAINTIS 19(02): 51. doi:10.25299/saintis.2019.vol19(02).3917.

Widodo, Slamet, Asriadi Asriadi, Wilis Sutiono, Faried Desembardi, Hafidz N. Fauzi, and Muhammad Nur Fajar. 2023. “Optimalisasi Biaya Dan Waktu Pekerjaan Perumahan Griya Pekerja Sejahtera.” Konstruksia 15(1): 27. doi:10.24853/jk.15.1.27-33.

Wulandari, Ayu. 2021. “Peninjauan Optimalisasi Time Schedule Menggunakan Metode CPM Dan PERT Pada Proyek Pembangunan Jalan Transmigrasi Teget Kabupaten Bener Meriah.” Jurnal Ilmiah Mahasiswa Teknik [JIMT 1: 1–15.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.951

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.