Analisis Biaya dan Waktu pada Proyek Pembangunan Gudang dan Musholla Area Mainsub Tuban III-IV dengan Metode Earned Value
Abstract
The Warehouse and Musholla Development Project for the Mainsub Tuban II-IV Area is scheduled to be completed within 18 weeks with a contract value of Rp1,543,013,748.08. The purpose of this study was to determine the cost and time performance and the factors that caused the delay and progress of the project. The method used in this study is the Earned Value method which uses elements of cost and time as well as physical performance of the work. Data obtained from the project include the project Time Schedule, Budget Estimate Plan (RAB), weekly project reports, and actual costs, then cost, schedule, variance, performance index analysis was carried out by explaining the problems that emerged during the study. From the results of the analysis, it is known that the costs incurredare lower than the budgeted costs (costs are more efficient than planned) and the completion of the project is according to schedule, which is 18 weeks. However, there was a delay in progress in the 5th and 6th weeks indicated by the SPI (Schedule Performance Index) values of 0.766 and 0.934, which means that the implementation time is slower than the planned schedule caused by technical problems with the implementation of soil excavation that is not in accordance with the plan. The delay in progress can be pursued by accelerating in the 10th week to the 15th week with quite significant progress. The estimated final cost calculation result of the project is Rp1,492,777,469.16 with a completion time of 18 weeks.
Keywords
Full Text:
PDFReferences
Belferik, R., Ardiyan, A., Zulkarnain, I., Munizu, M., Samosir, J. M., Afriyadi, H., . . . Prasetyo, A. (2023). Manajemen Proyek. Jambi: PT. Sonpedia Publishing Indonesia.
Callahan, M. T., Quackenbush, D. G., & Rowings, J. E. (1992). Construction Project Scheduling. McGraw-Hill.
Djojowirono, S. (2005). Manajemen Konstruksi. Yogyakarta: Biro Penerbit FT UGM.
Ervianto, W. I. (2002). Manajemen Proyek Konstruksi. Yogyakarta: ANDI Yogyakarta.
Fleming, Q. W., & Koppelman, J. M. (1994). The Essence and Evolution of Earned Value. AACE Transactions.
Hassan, H., Mangare, J. B., & Pratasis, P. A. (2016). Faktor-Faktor Penyebab Keterlambatan Pada Proyek Konstruksi Dan Alternatif Penyelesaiannya (Studi Kasus: Di Manado Town Square III). Jurnal Sipil Statik, Vol.4 No.11 (657-664).
Jazuli, M., & Dhana, R. R. (2024). Analisis Biaya dan Waktu pada Proyek Jembatan (Studi Kasus Proyek Pembangunan Jembatan Candisari Sambeng Kabupaten Lamongan) dengan Menggunakan Metode Earned Value. Jurnal Talenta Sipil, Vol 7, No 1.
Maromi, M. I., & Indrayani, R. (2015). Metode Earned Value Untuk Analisa Kinerja Biaya Dan Waktu Pelaksanaan Pada Proyek Pembangunan Condotel De Vasa Surabaya. Jurnal Teknik ITS, Vol. 4, No. 1.
Mockler, R. J. (1972). The Management Control Process. Appleton-Century-Crofts.
Nurdiana, A. (2015). Analisis Biaya Tidak Langsung Pada Proyek Pembangunan Best Western Star Hotel & Star Apartment Semarang. Teknik, 36 (2) 105-109.
Rani, H. A. (2016). Manajemen Proyek Konstruksi. Yogyakarta: Grup Penerbitan CV BUDI UTAMA.
Santosa, B. (2009). Manajemen Proyek. Yogyakarta: Graha Ilmu.
Soeharto, I. (1995). Manajemen Proyek Dari Konseptual Sampai Operasional. Jakarta: Erlangga.
Soemardi, B. W., Abduh, M., Wirahadikusumah, R. D., & Pujoartanto, N. (2007). Konsep Earned Value untuk Pengelolaan Proyek Konstruksi. Bandung: Institut Teknologi Bandung (ITB).
Sudarsana, D. K. (2008). Pengendalian Biaya Dan Jadual Terpadu Pada Proyek Konstruksi. Jurnal Ilmiah Teknik Sipil, Vol. 12, No. 2.
Sultan, & Nurcahyo, C. B. (2024). Analisis Kinerja Waktu Pada Proyek Pembangunan Gedung Smart Automation Workshop PENS dengan Metode Earned Value. Jurnal Teknik ITS, Vol. 13, No. 2.
DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.913
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |