Implementasi Building Information Modeling (BIM) Pada Konstruksi High Risk Building

Mochammad Nuril Faizal Akbar, Lila Ayu Ratna Winanda, Yosimson Petrus Manaha

Abstract


Almost all construction companies in Indonesia use conventional methods in planning, including volume analysis. The weakness of the conventional method is that it requires more time with low precision. The need for updating the implementation to the planning results is also difficult to do. Therefore, the purpose of this research is to implement Building Information Modeling (BIM), which is a method to display virtual construction before physical construction begins, based on the Autodesk Revit application. Analysis using the Autodesk Revit application automatically generates a work volume of 4,333,885m³ for concrete work and 666,338.61kg for reinforcement work in the case under review. The results of the analysis show that the application of Building Information Modeling (BIM) in construction projects can simplify and accelerate the design process.


Keywords


Building Information Modeling; High Risk Building; Work Volume.

Full Text:

PDF

References


Alimin, M. (2023). Penerapan Bulding Information Modelling ( BIM ) Autodesk Revit dalam Pembuatan Bar Bending Schedule ( BBS ) Pondasi Pile Cap Proyek Apartemen Jkt Living Star - Jakarta Timur. 2(2).

Berlian P., C. A., Adhi, R. P., Hidayat, A., & Nugroho, H. (2016). Perbandingan Efisiensi Waktu, Biaya, Dan Sumber Daya Manusia Antara Metode Building Information Modelling (BIM) Dan Konvensional (Studi Kasus: Perencanaan Gedung 20 Lantai). Jurnal Karya Teknik Sipil, 5(2), 220–229. http://ejournal-s1.undip.ac.id/index.php/jkts

Ferial, R., Hidayat, B., Pesela, R. C., & Daoed, D. (2022). Quantity take-off berbasis building information modeling (bim) studi kasus: gedung bappeda padang. Jurnal Rekayasa Sipil (JRS-Unand), 17(3), 228. https://doi.org/10.25077/jrs.17.3.228-238.2021

I Gusti Agung Adnyana Putera. (2022). MANFAAT BIM DALAM KONSTRUKSI GEDUNG: SUATU KAJIAN PUSTAKA. Jurnal Ilmiah Teknik Sipil, 26, 43–52.

Juliani, M. P., & Renaningsih, R. (2023). Analisa Perbandingan Volume Beton Metode Konvensional pada Hasil Bill of Quantity (BQ) dan BIM Autodesk Revit 2020 terhadap Efektifitas Biaya. Prosiding Seminar Nasional Teknik Sipil UMS, 631–637.

KemenPUPR. (2018). PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT REPUBLIK INDONESIA NOMOR 22/PRT/M/2018 TENTANG PEMBANGUNAN BANGUNAN GEDUNG NEGARA.

Marizan, Y. (2019). Penggunaan Software Autodesk Revit. Jurnal Ilmiah Beering’s, 06(01), 15–26.

Murphy, W. K., & Ismailiyah Al Athas, S. (2020). Penggunaan Clash Detection Untuk Efisiensi Biaya Dan Waktu Pada Perencanaan Bangunan Industrial Berbasis IPD. Sustainability in Architecture, 7, 69–77.

Pramana, I. M. W., Arya, I. W., & Wiraga, I. W. (2023). Jurnal Talenta Sipil. 6(2), 328–335. https://doi.org/10.33087/talentasipil.v7i2.629

Reista, I. A. (2022). Implementasi Building Information Modeling (BIM) Dalam Estimasi Pekerjaan Struktural dan Arsitektural Pada Proyek Perencanaan Gedung Utama RS Berau. Jurnal Institut Teknologi Sains Bandung, 1–17.

Sabil, D., & Erizal. (2023). Penerapan Buidling Information Modeling (BIM) 5D pada Proyek Gedung Simpang Temu Dukuh Atas, Jakarta Pusat. Jurnal Teknik Sipil Dan Lingkungan, 8(02), 95–104. https://doi.org/10.29244/jsil.8.02.95-104

Saputra, Y. A., Purwaamijaya, I. M., & Masri, R. M. (2022). Implementasi Model Gambar Kerja, Analisis Struktur, Penjadwalan Dan Rencana Anggaran Biaya Dengan Metode Bim. Kokoh, 20(2), 125–134. https://doi.org/10.17509/k.v20i2.52366

Sari, K. P., Suraji, A., Irawan, D., & Halim, A. (2024). EFEKTIVITAS PENGGUNAAN TEKNOLOGI BUILDING INFORMATION MODELLING ( BIM ) DALAM DESAIN RUMAH 3 LANTAI. 7, 51–59.

Widiastuti, E. (2022). ANALISA PERBANDINGAN VOLUME METODE KONVENSIONAL DAN BUILDING INFORMATION MODELING (BIM) AUTODESK REVIT 2021 TERHADAP EFEKTIFITAS BIAYA (Studi Kasus Proyek Pembangunan Rumah susun Pekerja Industri Batang III Tower 10). ANALISA PERBANDINGAN VOLUME METODE KONVENSIONAL DAN BUILDING INFORMATION MODELING (BIM) AUTODESK REVIT 2021 TERHADAP EFEKTIFITAS BIAYA (Studi Kasus Proyek Pembangunan Rumah Susun Pekerja Industri Batang III Tower 10), M, 1–14.

Yadi, S., Yusuf, E., Yusuf, E., Soebandono, B., & Soebandono, B. (2023). Quantity Take Off pada Perencanaan Gedung Apartemen Menggunakan BIM Revit. Jurnal TeKLA, 5(1), 47. https://doi.org/10.35314/tekla.v5i1.3422




DOI: http://dx.doi.org/10.33087/talentasipil.v8i1.855

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.