Communication Culture Language Style In Project Implementation In Lamongan City
Abstract
Keywords
Full Text:
PDFReferences
Ahmad, A. et al. (2022) ‘Influence of Construction Project Performance Indicators on Project Success Moderating Role of Pandemic Covid-19 and Project Evaluation Management’, Journal of Business and Social Review in Emerging Economies, 8(1). Available at: https://doi.org/10.26710/jbsee.v8i1.2189.
Ahmed, R., Hussain, A. and Philbin, S.P. (2022) ‘Moderating Effect of Senior Management Support on the Relationship Between Schedule Delay Factors and Project Performance’, EMJ - Engineering Management Journal, 34(3). Available at: https://doi.org/10.1080/10429247.2021.1940033.
Alajmi, A.M. and Ahmed Memon, Z. (2022) ‘A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects’, Smart Cities. Available at: https://doi.org/10.3390/smartcities5040075.
Borysenko, O. and Mygal, S. (2021) ‘IMPACT OF SOCIO-CULTURAL TRANSFORMATION IN THE COMMUNICATIVE DESIGN IN GALICIA’, Proceedings of CBU in Social Sciences, 2. Available at: https://doi.org/10.12955/pss.v2.202.
Choi, B. and Lee, S.H. (2022) ‘The psychological mechanism of construction workers’ safety participation: The social identity theory perspective’, Journal of Safety Research, 82. Available at: https://doi.org/10.1016/j.jsr.2022.05.011.
El-Saboni, M., Aouad, G. and Sabouni, A. (2009) ‘Electronic communication systems effects on the success of construction projects in United Arab Emirates’, Advanced Engineering Informatics, 23(1). Available at: https://doi.org/10.1016/j.aei.2008.07.005.
Eliwa, H.K., Jelodar, M.B. and Poshdar, M. (2022) ‘Information and Communication Technology (ICT) Utilization and Infrastructure Alignment in Construction Organizations’, Buildings, 12(3). Available at: https://doi.org/10.3390/buildings12030281.
Gamil, Y. and Abd Rahman, I. (2023) ‘Studying the relationship between causes and effects of poor communication in construction projects using PLS-SEM approach’, Journal of Facilities Management, 21(1). Available at: https://doi.org/10.1108/JFM-04-2021-0039.
Gamil, Y. and Rahman, I.A. (2017) ‘Identification of causes and effects of poor communication in construction industry: A theoretical review’, Emerging Science Journal. Available at: https://doi.org/10.28991/ijse-01121.
Ghaleb, H. and Abdullah, A.A. (2021) ‘A Conceptual Framework for Impact of Project Complexity on Success of Railway Construction Projects: The Moderating Role of Effective Communications to All Stakeholders’, The Journal of Management Theory and Practice (JMTP), 2(1). Available at: https://doi.org/10.37231/jmtp.2021.2.1.85.
Hussain, A.M. et al. (2018) ‘Causes and Impacts of Poor Communication in the Construction Industry’, 2nd International Conference on Sustainable Construction and Project Management [Preprint], (February 2019).
Jiang, H. et al. (2022) ‘Metro Engineering Project Schedule Optimization Based on Wireless Network Communication and BIM Model Algorithm’, Scientific Programming, 2022. Available at: https://doi.org/10.1155/2022/3900615.
Khanyile, N.S.M., Musonda, I. and Agumba, J.N. (2019) ‘Evaluating the relationship between communication management practices and project outcomes: A case study of Eswatini (Swaziland) construction industry’, Construction Economics and Building, 19(2). Available at: https://doi.org/10.5130/AJCEB.v19i2.6646.
Kim, J. et al. (2022) ‘Improving Sustainable Project Success Strategies Focused on Cost and Schedule for Electrical Construction Project Management’, Sustainability (Switzerland), 14(5). Available at: https://doi.org/10.3390/su14052653.
Likita, A.J. et al. (2022) ‘Lean and BIM Implementation Barriers in New Zealand Construction Practice’, Buildings, 12(10). Available at: https://doi.org/10.3390/buildings12101645.
Liu, Y., van Nederveen, S. and Hertogh, M. (2017) ‘Understanding effects of BIM on collaborative design and constructionAn empirical study in China’, International Journal of Project Management, 35(4), pp. 686–698. Available at: https://doi.org/10.1016/j.ijproman.2016.06.007.
Lu, W., Xu, J. and Söderlund, J. (2020) ‘Exploring the Effects of Building Information Modeling on Projects: Longitudinal Social Network Analysis’, Journal of Construction Engineering and Management, 146(5). Available at: https://doi.org/10.1061/(asce)co.1943-7862.0001823.
Ma, G., Jiang, S. and Jia, J. (2022) ‘Investigating the adoption of social media in the construction industry: empirical evidence from project teams in China’, Engineering, Construction and Architectural Management, 29(10). Available at: https://doi.org/10.1108/ECAM-05-2021-0456.
Malik, S. et al. (2021) ‘Exploring the relationship between communication and success of construction projects: The mediating role of conflict’, Sustainability (Switzerland), 13(8). Available at: https://doi.org/10.3390/su13084513.
Martins, S.S. et al. (2022) ‘Evaluation of 4D BIM tools applicability in construction planning efficiency’, International Journal of Construction Management, 22(15). Available at: https://doi.org/10.1080/15623599.2020.1837718.
Muktar Ishaq, I. et al. (2019) ‘Improving Communication between Client and Contractor during Construction Project in Nigerian Construction Industry’, JOURNAL OF TECHNOLOGY MANAGEMENT AND BUSINESS, 6(3).
Muneer, M. et al. (2022) ‘A Quantitative Study of the Impact of Organizational Culture, Communication Management, and Clarity in Project Scope on Constructions’ Project Success with Moderating Role of Project Manager’s Competencies to Enhance Constructions Management Practices’, Buildings, 12(11). Available at: https://doi.org/10.3390/buildings12111856.
Nasirzadeh, F. et al. (2022) ‘Labour productivity in Australian building construction projects: a roadmap for improvement’, International Journal of Construction Management, 22(11). Available at: https://doi.org/10.1080/15623599.2020.1765286.
Naveed, F. and Khan, K.I.A. (2022) ‘Investigating the influence of information complexity on construction quality: a systems thinking approach’, Engineering, Construction and Architectural Management, 29(3). Available at: https://doi.org/10.1108/ECAM-05-2020-0311.
Olaniran, H.F. (2015) ‘On The Role Of Communication In Construction Projects In Nigeria’, INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH, 4.
Ramadhan, W., Prasetyo, R.F. and Raflis (2023) ‘The Effect of Communication on Supply Chain Management Performance on Construction Projects in Jakarta’, IOP Conference Series: Earth and Environmental Science, 1203(1). Available at: https://doi.org/10.1088/1755-1315/1203/1/012009.
Rodrigues, M.R. and Lindhard, S.M. (2023) ‘Benefits and challenges to applying IPD: experiences from a Norwegian mega-project’, Construction Innovation, 23(2). Available at: https://doi.org/10.1108/CI-03-2021-0042.
Schönbeck, P., Löfsjögård, M. and Ansell, A. (2020) ‘Quantitative review of construction 4.0 technology presence in construction project research’, Buildings. Available at: https://doi.org/10.3390/buildings10100173.
Siju, N.M., Shafiyia, S. and Ben Maaouia, M. (2022) ‘APPLICATIONS OF DRONE TECHNOLOGY IN CONSTRUCTION PROJECTS: A SYSTEMATIC LITERATURE REVIEW’, International Journal of Research -GRANTHAALAYAH, 10(10). Available at: https://doi.org/10.29121/granthaalayah.v10.i10.2022.4810.
Suleiman, A. (2022) ‘Causes and effects of poor communication in the construction industry in the mena region’, Journal of Civil Engineering and Management, 28(5), pp. 365–376. Available at: https://doi.org/10.3846/jcem.2022.16728.
Suleiman, A. et al. (2023) ‘ADDRESSING THE CAUSES AND EFFECTS OF POOR COMMUNICATION IN THE JORDANIAN CONSTRUCTION INDUSTRY: A STUDY ON IMPROVING PROJECT PERFORMANCE’, Civil and Environmental Engineering [Preprint]. Available at: https://doi.org/10.2478/cee-2023-0014.
Zaman, U. et al. (2021) ‘Exploring the critical nexus between authoritarian leadership, project team member’s silence and multi-dimensional success in a state-owned mega construction project’, International Journal of Project Management, 39(8). Available at: https://doi.org/10.1016/j.ijproman.2021.10.007.
Zulch, B. (2014) ‘Leadership Communication in Project Management’, Procedia - Social and Behavioral Sciences, 119. Available at: https://doi.org/10.1016/j.sbspro.2014.03.021.
DOI: http://dx.doi.org/10.33087/talentasipil.v8i1.824
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |