Analisis Faktor-Faktor yang Mempengaruhi Tingkat Akurasi Perkiraan Biaya Awal pada Tahap Konstruksi (Persepsi Kontraktor di kota Jambi)

Uswatun Hasanah, Fakhrul Rozi Yamali, Annisaa Dwiretnani

Abstract


Making a budget or cost estimate is part or project planning. The financial benefits that the constractor and project owner will receive depend on their level of axpertise in estimating the project cost.This research aims to identify which factors moast influence the level of accuracy of initial cost estimates at he construction stage and to find out how much influence these factors have on the level of accuracy of cost estimates. Primary data collection technique with asample of 14 respondents taken from the perceptions of contractors in jambi. The sampling technique in this research used the total sampling method. Data analysis processing in this research used microsoft excel 2010. The research result found that the factor that most influences the level of accuracy of initial cost estimates at the construction stage is the availability of data and information regarding the project with a mean value obtained 4,00 , the second factor is the technique or method used with amean value of 3,82 , the third factor is the skill and experience of the estimator with a mean value of 3,79 , and the fourth factor is the purpose of using the cost estimate with a mean value 3,40.


Keywords


initial project cost, construction project, building, contractor perception.

Full Text:

PDF

References


Abrar Husen (2009) Manajemen Proyek, Penerbit Andi. Yogyakarta.

Anisa Ramadona (2021) Analisis Faktor Faktor Penyebab Selisih Harga Pembiayaan Pada Peningkatan Jalan dikabupaten Tanjung Jabung Timur Penerbit Jurnal Talenta Sipil.

Ari Andri Mardana (2012) Model Estimasi Konstruksi, Gema Teknik UNS surakarta.

Ayu Cri Vinantya Laksmi, Komang Armaeni, Wayan Jawat (2023). Estimasi Biaya Proyek Pada Kontrakor Skala Kecil di Bali pada Masa Pandemi COVID-19. Jurnal PNL (Politeknik Negeri Lhoksewmawe,Bali).

Boby Maulana Ananda Tuah Ate (2022). Evaluasi Rencana Anggaran Biaya Dengan Metode Analisa K Pada Proyek Peningkatan Jalan Rikit –Lawe Kinga di Kabupaten Aceh Tenggara. Penerbit JIMT (Jurnal Ilmiah Mahasiswa Teknik).

D.J Clealand dan W.R king (1987).Sistem Analysis dan project Manajement. Penerbit McGraw-Hill Book Co.new york

Garold D.Oberlender (1993). Project Management For Engineering and Construction.McGraw- Hill. New york.

Hendra S. Raharja Putra (2009). Manajemen Keuangan dan Akuntansi. Jakarta

Imam Soeharto (1995). Manajemen Proyek Tentang Kualitas Suatu Estimasi edisi kedua. Erlangga. Jakarta.

Joseph Gultom, ST (2009) kuisioner tentang faktor – faktor yang mempengaruhi akurasi perkiraan biaya awal Proyek. Penerbit Jurnal Teknik Universitas Pelita Harapan.

Kerzner (2006) Project Manajement. A System Approach To Planning Scheduling and Controling. Penerbit new jersey.

Mora, Li (2001) Penerapan Manajemen Proyek di Bidang Konstruksi. Erlangga. Jakarta.

Poh, Paul S. H, Horner (1995) Komponen Biaya yang Mempengaruhi Estimasi.Erlangga. Jakarta

Render, Heizer (2001). Prinsip-Prinsip Manajemen Proyek. Salemba empat. Jakarta.

Wulfram I Ervianto (2002) Manajemen Proyek Konstruksi. Penerbit Andi Offset. Yogyakarta.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.815

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.