Pengaruh Negatif Change Order terhadap Biaya, Mutu dan Waktu pada Proyek Konstruksi di Kota Denpasar

I Gusti Ayu Wulan Krisna Dewi, I Made Wahyu Pramana

Abstract


Change orders often occur in constructionprojects, particularly in building projects, involvingadditions, changes, or reductions of work items during the implementation process. These changes significantly affect the project’s cost, quality, and schedule. The negative impact of changeorders is frequently felt across these three aspects, as observed inconstruction projectsin Denpasar. Therefore, ananalysis isneeded to determine the extent ofthe negativeimpact caused by change orders. This study aims to measure the impact of change orders on cost, quality, and time in constructionprojects in Denpasar. The research process began with a literaturereview toidentify the variablesand indicators-related to change orders and theireffects on projectimplementation. Subsequently, questionnaires were prepared and distributed to projectmanagers, sitemanagers, and project leaders in Denpasar as respondents. The collected data was then analyzed using the Partial Least-Square (PLS) method to gain deeper insight into the impact of change orders. The findings reveal that change orders have a significantly negative impact on project performance. Specifically, the influence of changeorders onproject cost is recorded at 31.6%, on quality at 16.8%, and on time at 23.2%. These results highlight that change orders play a crucial role in determining theefficiency and effectiveness of building construction projects. Therefore, effective management of changeorders is essential to minimize their negative impact and ensure that projects are executed according to plan interms of cost, quality, and time..

Keywords


change order; cost; quality; time and PLS.

Full Text:

PDF

References


Agustus, N. (2024) ‘Jurnal Talenta Sipil Faktor Penyebab Contract Change Order pada Proyek’, 7(2), pp. 807–819. Available at: https://doi.org/10.33087/talentasipil.v7i2.600.

Apriani, C. et al. (2022) ‘Analisis Faktor Penyebab Dan Akibat Contract Change Order Pada Proyek Rehabilitasi Dan Renovasi Sarana Dan Prasarana Sekolah Kabupaten Pasaman Dan Kabupaten Pasaman Barat Analysis of the Causes and Consequen Ces of Contract Change Orders on the Rehabilita’, Journal of Applied Engineering Scienties, 5(3), pp. 247–268. Available at: https://ft.ekasakti.org/index.php/JAES/index/.

Beatrix, M. (2014) ‘Analisa Pengaruh Change Order Terhadap Biaya , Waktu’, Prosiding Seminar Nasional Manajemen Teknologi XX, pp. 1–7.

Cho-hui Wu Hsieh, T. and S.L. (2004) ‘Statistical Analysis of Causes for Change Orders in Metropolitan Public Works’, Journal of Project Management, 22(8), pp. 679–686.

Geraldo, M. and Ariesto, F. (2022) ‘Faktor Penyebab Dan Dampak Change Order Terhadap Indikator Performa Proyek’, Jurnal Ilmiah Teknik Sipil a Scientific Journal of Civil Engineering, 11(2), pp. 130–137. Available at: https://ojs.unud.ac.id/index.php/jits/article/view/30361.

Ghozali, I. (2006) Structural Equation Modeling: Metode Alternatif dengan Partial Least Square. Semarang: Badan Penerbit Universitas Diponegoro.

Pheng, L.S. (1995) ‘Effective Management of Contract Variations using a Knowledge Based Decision Support System’, WEBE Series: Working Paper No. 10, (10), pp. 52–59.

Putri, I.R.H. and Waty, M. (2021) ‘Penyebab Change Order Pada Proyek Konstruksi Bangunan Air Wilayah Dki Jakarta’, JMTS: Jurnal Mitra Teknik Sipil, 4(1), p. 249. Available at: https://doi.org/10.24912/jmts.v0i0.10289.

Rajanun, Irwan Lakawa, Sitti Hawa, Haryono, S. (2022) ‘Faktor-Faktor Yang Mempengaruh Contract Change Order pada Pekerjaan Rehabilitasi Jalan Mataiwoi-Abuki’, Sultra Civil Engineering Journal (SCiEJ), 3(1), pp. 9–17.

Sapulette, W. (2009) ‘Analisa Penyebab dan Pengaruh Change Order pada Proyek Infrastruktur dan Bangunan Gedung di Ambon’, Jurnal Teknologi, 6(2), pp. 627–633.

Soeharto, I. (1999) Manajemen Proyek Dari Konseptual Sampai Operasional. Kedua. Jakarta: Erlangga.

Sulistio, H. and Waty, M. (2008) ‘Analysis and Evaluation Change Order in Flexible Pavement (Case Study: Road Projects in East Kalimantan)’, Media Komunikasi Teknik Sipil, 16(1), pp. 31–47.

Syahbani, K.R. (2022) Analisis Pengaruh Contract Change Order ( Cco ) Terhadap Cost Overrun Pada Proyek Jalan Apbd Kabupaten Sragen Tahun 2017-2018. UNIVERSITAS MUHAMMADIYAH SURAKARTA.

Willy Abdillah, J.H. (2015) Partial Least Square (PLS) : Alternatif Structural Equation Modeling (SEM) Dalam Penelitian Bisnis. Yogyakarta: Andi.

Wirawan, I.A.R.W.A.A.W. dan I.P.Y. (2016) ‘Faktor-Faktor Penyebab Change Order Pada Proyek Konstruksi Gedung’, Jurnal Ilmiah Teknik Sipil a Scientific Journal of Civil Engineering, pp. 1–7.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i1.792

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.