The number of bids is less than 80% of the HPS, meaning that the work offered will be carried out at a cost of less than 80% of the estimated cost of the person in charge of the work. In the 2020 period the average percentage of contract value with an offer value of < 80% HPS at Agency x tends to increase significantly by 80% compared to the 2019 period. If the HPS preparation is assumed to have been carried out in accordance with expertise and supported by accountable data. Therefore, the implementation of a contract with a bid value below 80% HPS has a greater possibility of risk in the field compared to a contract value with an offer value above 80% HPS. The method used in carrying out this research is the descriptive method, namely through direct interviews with the Commitment Making Officer (PPK) at agency x to obtain information about the purpose of this research, namely, knowing what risks arise, the causes of risks, and what anticipatory steps are taken. to reduce risk. From the results of data processing after being validated with sources, the risks that arise are: contract extension, contract termination, reduced construction age, disputes, and bad news from local media caused by the bid value which is considered unreasonable. Steps taken by the owner as the owner of the project to reduce risk are Terminating the contract for projects found to be deviant according to applicable regulations and tightening supervision to maintain the quality of work.

Keywords


Self Estimated Price (HPS); Contract Value; Bid.

Full Text:

PDF

References


Antari, V. A., & Saleh, M. (2023). Penerapan Diskresi Pejabat Fungsional Pengelola Pengadaan Barang/Jasa Dalam Penyelenggaraan Pengadaan Barang/Jasa Pemerintah. Hukum Bisnis, 7, 2023.

Bs Iso 31000:2018. (2018). Risk Management - Guidelines (1st Ed.). Bsi.

Chen, Q., Reichard, G., & Beliveau, Y. (2008). Multiperspective Approach To Exploring Comprehensive Cause Factors For Interface Issues. Journal Of Construction Engineering And Management, 432–441. Https://Doi.Org/10.1061/Asce0733-93642008134:6432

Duha, I. (2023). Tren Penawaran Dibawah 80% Hps Untuk Memenangkan Paket Tender Pekerjaan Konstruksi Studi Kasus Pada Balai Pelaksana Pemilihan Jasa Konstruksi Wilayah Kalimantan Selatan T.A. 2023. Prosiding Seminar Nasional Teknik Tahun 2023 (Senastika 2023), 39–46.

Fauzi, A., Maharani Putri, A., Fitriyani, F., Astriyani, R., Arisana, V., & Indah Cahyani, Y. (2024). Tinjauan Ancaman Dan Risiko Pada Sistem Keamanan Internet Of Things, Berbasis Cloud Computing Dalam Penggunaan E-Commerce Dan Rencana Strategis. Jurnal Kewirausahaan Dan Multi Talenta, 126–137. Https://Doi.Org/10.38035/Jkmt.V2i2

Flanagan, R., & Norman, G. (2000). Risk Management And Construction.

Hambarsari, P. D., & Inggit, K. (2016). Analisis Pengaruh Pertumbuhan Ekonomi, Pertumbuhan Penduduk Dan Inflasi Terhadap Tingkat Kemiskinan Di Jawa Timur Tahun 2004-2014. Jurnal Ekonomi & Bisnis, 1, 257–282.

Handayani, E., Amalia, K. R., & Suryani, S. (2021). Analisis Perbandingan Produktivitas Tenaga Kerja Lokal Dengan Tenaga Kerja Yang Didatangkan Dari Luar Kota Jambi. Jurnal Talenta Sipil, 4(1), 66. Https://Doi.Org/10.33087/Talentasipil.V4i1.50

Jange, B., Idie, D., Pattiran, M., & Tindage, J. (2023). Peran Inovasi Teknologi Dalam Meningkatkan Efisiensi Operasional Dalam Manajemen Ekonomi: Sebuah Kajian Kritis Literatur. 7, 216–221.

Kurniawan, S. (2023). Pengaruh Pertumbuhan Ekonomi, Pertumbuhan Ekonomi Kuadrat Dan Perdagangan Internasional Terhadap Pencemaran Udara Di Kawasan Barat Indonesia Dan Kawasan Timur Indonesia Periode 2014 – 2019. Pascasarjana Universitas Lampung.

Mandaladikari, D. A. (2020). Implementasi Nilai - Nilai Syariah Dan Kesejahteraan Masyarakat Studi Pada Induk Koperasi Angkatan Darat. Uin Syarif Hidayatullah Jakarta.

Mmurdana. (2013). Analisis Risiko Pada Pekerjaan Pengamanan Pantai Klating Di Kabupaten Tabanan. Media Bina Ilmiah, 7, 64–68. Http://Www.Lpsdimataram.Com

Murtiana Sari, E. (2020). Comparison Of Risk Management Analysis Between Pmbok. Https://Www.Researchgate.Net/Publication/348692214

Rosmayanti, S., Mualana, A., & Gunadi, T. (2024). Peluang Dan Tantangan Ekonomi Bisnis Dan Kesehatan Di Era Society 5.0. Jurnal Ilmiah Manajemen, 15, 113–130.

Suhandoyo, S. (2020). Metode Penelitian Kualitatif.

Undang-Undang. (2020). Menteri Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i1.781

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.