Produktivitas Alat Berat pada Pekerjaan Preservasi dan Peningkatan Kapasitas Jalan Nasional Studi kasus Simpang Niam Lubuk Kambing-Merlung
Abstract
The use of heavy equipment in civil engineering, mining and large-scale earthmoving works is almost inevitable. In fact,this tool is a factor that really determines the successful completion of work on time in accordance with the required quality. When compared to human labor using simple conventional equipment such as hoes, shovels, baskets, pounding tools for compaction and so on, using heavy equipment has many advantages that promise benefits. Moreover, if a job requires technical requirements and high precision, then the choice of using heavy equipment is a very appropriate alternative. The advantage of using heavy equipment compared to manual tools is that you can complete construction work more quickly. Apart from optimizing working time, construction costs can also be adjusted. Tool productivity depens on the type of tool, worj method, work area conditions and the time needed to complete a job. So, an analysis of the calculation of the heavy equipment requirements required and an analysis of the implementation time required by each tool is required, taking into account the calculation steps, namely: calculating the production capacity of each heavy equipment in order to obtain the productivity value, so that the number of each tool required can be determined.
Keywords
Full Text:
PDFReferences
Afriandi, Mekky. (2014). Analisa Perhitungan Alat Berat Pada Proyek Peningkatan Jalan Simpang Seling – Muaro Jernih Kabupaten Merangin. Tugas Akhir, Jurusan Teknik Sipil Universitas Batanghari Jambi, Jambi.
Badan Standar Nasional 2013, Beban Minimum Untuk Perancangan Bangunan dan Struktur lain, SNI-1727-2013, Jakarta.
Analisa Harga Satuan Pekerjaan. AHSP - SNI. (2016).
Astuti, Novianti Dyah. (2020). Analisa Efisiensi Pelaksanaan Proyek Peningkatan Jalan Brebes – Sigempol Ditinjau Dari Produktivitas Alat Berat Dan Analisa Harga Satuan. Tugas Akhir, Jurusan Teknik Sipil Universitas Pancasakti Tegal, Tegal.
Buluatie, Nurhadinata. (2013). Optimalisasib iaya dan waktu dengan metode timecost trade off. Tugas Akhir, Jurusan Teknik Sipil Universitas Gorontalo, Gorontalo.
Putra, Muhammad Irfan Hari. (2018). Analisa Pemilihan Alat Berat Pada Pekerjaan Galian Dan Timbunan Proyek Pembangunan Fakultas Hukum. Tugas Akhir, Jurusan Teknik Sipil Dan Perencanaan Universitas Islam Indonesia Yogyakarta, Yogyakarta.
Menteri Pekerjaan Umum No. 11/PRT/M/2013
Rasyid, R (2008), AnalisisProduktivitas Alat-Alat Berat Proyek, Tugas Akhir S1Jurusan Teknik Sipil Universitas Islam Indonesia, Yogyakarta
Rostiyanti, S.F. (2002), “Alat-alat Berat untuk proyek konstruksi”, Rineka Cipta Jakarta.
Rochmanhadi, (1982), Alat-alat Berat dan Penggunaannya, Departemen Pekerjaan Umum, Jakarta.
Suryadharma, (1998), Sifat-Sifat Beberapa Macam Tanah, Yogyakarta.
UU Nomor 38 (2009)
Widodo, Y, (2017), Dokumentasi Wheel Loader Komatsu WA380-3, Samarinda.
Wigroho, Heryanto,Y dan Suryadharma, H, (1998), Alat - Alat Berat Revisi, Universitas Atma Jaya Yogyakarta, Yogyakarta.
Wanna, Lordy Frand De. (2016). Analisis Biaya Penggunaan Alat Berat pada Pekerjaan Peningkatan Jalan Simpang Tudameda-Nemberala..
DOI: http://dx.doi.org/10.33087/talentasipil.v8i1.704
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |