Analisis Dampak Kinerja Konsultan Manajemen Konstruksi pada Ketepatan Biaya dan Waktu Pembangunan Lapas Bagansiapiapi

Zulfikar Siregar, Eva Rita, Khadavi Khadavi

Abstract


In the construction of Bagansiapiapi prison, there was a critical progress of the work caused by decreasing labor productivity, lack of equipment, and changes in the schedule plan for ready-mix concrete casting materials. The final completion of the physical construction work of Class IIA Bagansiapiapi Prison was delayed by 5 days from the initial contract of 165 calendar days. Therefore, the purpose of this study was to determine the dominant indicators of the Construction Management Consultant regarding the suitability of the cost and completion time of the Bagansiapiapi Prison Construction work. This research method is quantitative descriptive by distributing questionnaires with a Likert scale to respondents involved in the construction project as many as 87 respondents and then testing the validity, reliability and factor analysis. The results of this study indicate that the dominant indicator of the suitability of the cost of completing the Bagansiapiapi Prison Construction work is the accurate price estimation component with a correlation value of 0.856. Then, the dominant indicator of the suitability of the completion time of the Bagansiapiapi Prison Construction work is the material/equipment procurement schedule with a correlation value of 0.895.


Keywords


Performance; Construction Management Consultant; Cost and Time Compliance

Full Text:

PDF

References


Amin, B., Ashad, H., & Maricar, H. (2024). Kajian Peranan Konsultan Manajemen Konstruksi pada Proyek Konstruksi di Makassar. Jurnal Teknik Industri Terintegrasi, 7(3), 1598–1605. https://doi.org/10.31004/jutin.v7i3.30751

Daniel, J., Tuelah, P., Tjakra, J., & Walangitan, D. R. O. (n.d.). PERANAN KONSULTAN MANAJEMEN KONSTRUKSI PADA TAHAP PELAKSANAAN PROYEK PEMBANGUNAN (Studi Kasus : THE LAGOON TAMAN SARI).

Darmali, A., & Waty, M. (2022). Analisis Peranan Konsultan Manajemen Konstruksi Dalam Mencegah Keterlambatan Waktu Konstruksi. JMTS: Jurnal Mitra Teknik Sipil, 5(1), 141–152. https://doi.org/10.24912/jmts.v5i1.16651

Deshariyanto, D. (2013). Faktor – Faktor Yang Mempengaruhi Waktu Pelaksanaan Proyek Konstruksi Di Dinas Pu. Bina Marga Kabupaten Sumenep. Jurnal Ilmiah MITSU, 1(2), 1–11. https://doi.org/10.24929/ft.v1i2.59

Elias, S., Ismail, N., & Basri, B. S. (2022). The Confirmatory Factor Analysis (CFA) of E-Procurement Adoption Model in Malaysian Construction Industry. International Journal of Academic Research in Business and Social Sciences, 12(5), 623–635. https://doi.org/10.6007/ijarbss/v12-i5/13097

Firdausi, A. A., Ghuzdewan, T. A., Saputra, A., & Aminullah, A. (2020). Studi Eksplorasi Faktor-Faktor Kesuksesan Proyek Konstruksi Di Indonesia. Journal of Civil Engineering and Planning, 1(2), 162. https://doi.org/10.37253/jcep.v1i2.1493

Heston, Y. P., Wulandari, M., & Fernando, R. (2024). Improving Supervisory Consultant Performance in Construction Projects: Assessments in the LKPP’s SIKaP Application for Enhanced Efficiency. Sustainable Civil Building Management and Engineering Journal, 1(3), 14. https://doi.org/10.47134/scbmej.v1i3.3123

Ikuabe, M., Aigbavboa, C., Anumba, C., Oke, A., & Aghimien, L. (2022). Confirmatory Factor Analysis of Performance Measurement Indicators Determining the Uptake of CPS for Facilities Management. Buildings, 12(4). https://doi.org/10.3390/buildings12040466

Inkiriwang, R. L. (2019). Metode Estimasi Waktu Penyelesaian KonstruksiBangunan Gedung. Jurnal Sipil Statik, 7(4), 463–470.

Komalasari, D. (2015). Rotasi Varimax dan Median Hirarki Cluster Pada Program Raskin di Kabupaten Lombok Barat. Jurnal Matematika, 5(1), 45–56.

Mudri. (2019). Analisis Faktor Metode Design and Build Pada Proyek Seksi I Jalan Tol Semarang – Batang. Konstruksi, 10(2), 39–56.

Nikumbh, A. R., & S.S. Pimplikar, D. (2014). Role of Project Management Consultancy in Construction Project. IOSR Journal of Mechanical and Civil Engineering, 10(6), 14–19. https://doi.org/10.9790/1684-1061419

Pokhrel, S. (2024). No TitleΕΛΕΝΗ. Αγαη, 15(1), 37–48.

Prudon, P. (2015). Confirmatory Factor Analysis as a Tool in Research Using Questionnaires: A Critique,. Comprehensive Psychology, 4, 03.CP.4.10. https://doi.org/10.2466/03.cp.4.10

Purba, G. R. (2023). Analisis Keterlambatan Proyek Konstruksi Gedung Puskesmas Onanganjang. Jurnal Insinyur Profesional, 2(2), 65–71. https://doi.org/10.24114/jip.v2i2.43493

Satoto, H. F., & Khoiroh, S. M. (2018). Confirmatory Factor Analysis Pada Keselamatan Kerja Di Perusahaan Konstruksi Jawa Timur. Jurnal Teknologi Dan Terapan Bisnis, 1(2), 66–75.

Sugiyono. (2020). Metodologi Penelitian Kuantitatif, Kualitatif dan R & D.

Sukarta, K. G. N., Tjakra, J., & Pratasis, P. A. K. (2021). Peran Konsultan Manajemen Konstruksi Dalam Proyek Pembangunan Gedung. Tekno, 19(79), 307–313. https://ejournal.unsrat.ac.id/index.php/tekno/article/view/38793

Widyastuti, I., Maharani, M., Haryadi, E., & Wijayanti, D. (2024). Pengaruh Biaya Produksi dan Biaya Operasional Terhadap Laba Bersih. Journal of Economics and Business UBS, 13(2), 642–661. https://doi.org/10.52644/joeb.v13i2.1578

Wijaya, A., Andi, A., & Rahardjo, J. (2023). Tingkat Kepuasan Kontraktor Terhadap Kinerja Konsultan Manajemen Konstruksi Di Surabaya. Dimensi Utama Teknik Sipil, 10(2), 137–155. https://doi.org/10.9744/duts.10.2.137-155

Yana, A. A. G. A., Rusdhi, H. A., & Wibowo, M. A. (2015). Analysis of factors affecting design changes in construction project with Partial Least Square (PLS). Procedia Engineering, 125, 40–45. https://doi.org/10.1016/j.proeng.2015.11.007

Zulyaden, Z., & Rinaldy, R. (2021). Analysis Of Project Success Inhibition Factors. International Journal of Engineering, Science and Information Technology, 1(1), 36–40. https://doi.org/10.52088/ijesty.v1i1.208




DOI: http://dx.doi.org/10.33087/talentasipil.v8i1.669

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.