Biaya dan Waktu pada Pelaksanaan Pekerjaan Struktur Balok Precast dan Balok Konvensional
Abstract
Concrete is a construction material that is widely used in Indonesia, when compared to the use of wood and steel materials, there are two methods of concrete work, namely the conventional method and the precast method. In the Kuta Art Market Development Project there are several blocks using the conventional method and some using the precast method. How to compare the cost and time of conventional beam work and the precast method and which method is more effective to use. To be able to determine the choice of the right method to use, an analysis of costs and implementation time is carried out. Furthermore, the results of the analysis are compared so as to get an effective method to use. From the results of the analysis carried out at the Kuta Art Market Development Project, a comparison of costs and implementation time obtained that the total cost for the work of 5 conventional blocks was IDR 47,656,004.04 and the time needed to complete the work of 5 conventional blocks was 5 days. Whereas the total cost required for the work of 5 precast beams is Rp. 46,006,742.42 and the time required to complete the work of 5 precast beams is 4.09 days. When compared, the cost of precast beam work is Rp. 1,649,301.32 (3.5%) cheaper and the execution time for precast beam work is 0.91 days (18%) faster than conventional beam work.
Keywords
Full Text:
PDFReferences
Purnomo, A.D. 2018. Batako Batako Kait Sebagai Alternatif Dinding Pasangan Untuk Bangunan Tahan Gempa. Tugas Akhir Fakultas Teknik Sipil dan Perencanaan Universitas Islam Indonesia
Astari, N. M., Subagyo, A. M., & Kusnadi. 2021. Perencanaan Manajemen Proyek dengan Metode Critical Path Method (CPM) dan Program Evaluation and Review Technique (PERT). Jurnal Konstruksia, 13(1), 164ā180.
Setyoningrum, A. 2006. Tinjauan produktivitas tenaga kerja pada pekerjaan pemasangan batu granit studi kasus proyek pembangunan gedung bukopin kantor cabang Solo. Jurnal Teknik Sipil Universitas Narotama. Surabaya.
Diputra, G.A.M.L. 2015. Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Struktur Beton Balok Dan Pelat Lantai. Laporan Penelitian Mandiri Teknik Sipil, Fakultas Teknik, Universitas Udayana. Bali
Rani, H. A., & Fuadi, Z. 2016. Efisiensi dan efektivitas pelaksanaan struktur kolom antara metode precast dengan konvensional. Jurnal Teknik Sipil, 5(3), 269-278.
Risdiyanti, A., & Siswoyo, S. 2018. Analisa perbandingan biaya dan waktu antara metode konvensional dan pracetak (Studi kasus: Underpass Bundaran Satelit Mayjend Sungkono Surabaya). Axial: Jurnal Rekayasa Dan Manajemen Konstruksi, 6(2), 69- 78.
Ardika, I. N., Salain, I. M. A. K., & Sukrawa, I. M. 2019. Studi eksperimen pelat beton bertulang pracetak satu arah berpenampang āuā sebagai alternatif struktur lantai. Jurnal Spektran, 7(2), 280.
Dwitanto, M. 2020. Penerapan Konsep Nilai Hasil Pada Proyek Pembangunan Gedung Di Kota Pontianak Study Kasus Pada Proyek Pembangunan Ruko 4 Lantai Dijalan Pangeran Natakusuma Pontianak. Jurnal Teknik Sipil. Pontianak.
Haryati, S., & Hermawan, A. R. 2021. Pelaksanaan pekerjaan struktur atas dengan beton pracetak pada proyek gedung. Construction and Material Journal, 3(2), 79-87.
Sediyanto, Alkik, M. H. 2018. Analisis perbandingan waktu dan biaya pada pelaksanaan pekerjaan kolom precast dan konvensional. Jurnal Teknik Sipil Universitas Mercu Buana, 2(1), 28ā35.
Devania, A., & Hermawan, A. R. 2020. Modifikasi struktur gedung dengan beton pracetak pada apartemen the conexio. Construction and Material Journal, 2(2), 115-122.
Handayani, A., dan Fahmi, 2020, Siklus produksi (cycle time)betonpracetak dengan metode beton self compacting concrete(SCC), Rekayasa Sipil, Vol.9,No. 1, hal. 18-24
Moniaga, F., & Rompis, V. 2019. Analisa sistem manajemen kesehatan dan keselamatan kerja (smk3) proyek konstruksi menggunakan metode hazard identification and risk assessment. Jurnal Ilmiah Realtech, 15(2), 65-73.
Aini, N. 2020. Analisa Penerapan Manajemen Waktu Pada Proyek Pembangunan Gedung Workshop Pembelajaran Keterampilan Man 1 Lombok Tengah : Fakultas Teknik Universitas Muhammadiah Mataram. Nusa Tenggara Barat.
Ulianto, W. D., & Musyafa, A. 2019. Analisis Perbandingan Biaya Pelaksanaan Pekerjaan Balok dan Kolom Menggunakan Metode Konvensional Cor di Tempat dan Precast. Jurnal Teknik Sipil Universitas Islam Indonesia.
DOI: http://dx.doi.org/10.33087/talentasipil.v7i2.628
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |


