Faktor Penyebab Contract Change Order pada Proyek Konstruksi Sumber Daya Air Padang Pariaman

Jonadi Jonadi, Zuherna Mizwar, Wahyudi P Utama

Abstract


Government infrastructure projects in water resources projects generally apply a unit price contract system. This is because implementing a unit price contract system is not difficult and is balanced in terms of sharing risks from contract changes between providers and users of construction services. In the unit price contract system, it is very possible for contract changes to occur on construction projects. Changes in the implementation of construction projects can occur repeatedly and are difficult to avoid. The aim of the research is to identify the factors that cause Contract Change Orders and the dominant factors that cause them during the implementation phase of construction projects in the water resources sector. The research was carried out by distributing questionnaires to respondents involved in water resources construction project work at the Padang Pariaman PUPR Service for the 2019 to 2021 budget year and then carrying out factor analysis. In research on the factors that cause Contract Change Orders to occur during the implementation phase of water resources construction projects in Padang Pariaman Regency, there are 4 factors that cause Contract Change Orders during the implementation phase of water resources construction projects, namely managerial factors, regulatory factors. from parties who have the authority to make decisions, planning factors, design change factors. The dominant factor that causes the Contract Change Order to occur during the implementation stage of a water resources construction project is the managerial factor.


Keywords


construction projects; contract change orders; managerial

Full Text:

PDF

References


Asnawi, M. N., 2017. Masalah-Masalah Hukum, [Online] Volume 46(1), pp. 55-68

Azwar, S. 1986. Reliabilitas dan Validitas: Interpretasi dan Komputasi, Yogyakarta: Pustaka Pelajar.

Bogdan, Robert, Taylor, Steven J. & DeVault, Marjorie L. (ed). 2016. Introduction to Qualitative Research Methods: A Guidebook and Resouce. Edisi keempat. New York: John Wiley & Sons. Hal. 5

Cynthia Apriani, Hardi Wijaya, Julita Andrini. 2022. Analisis Faktor Penyebab Dan Akibat Contract Change Order Pada Proyek Rehabilitasi Dan Renovasi Sarana Dan Prasarana Sekolah Kabupaten Pasaman Dan Kabupaten Pasaman Barat, Journal of Applied Engineering Scienties: Vol 5 No 3

Desai, J.N., Pitroda, J. and Bhavsar, J. J. 2015. A Review on Change Order and Assessing causes Affecting Change Order In Construction. Journal of International Academic Research for 2 (12): 152-162.

Dharmayanti, G., Janasuputra, I., & Wiryasa, N. 2021. Analisis Faktor Penyebab Contract Change Order Dan Pengaruhnya Terhadap Kinerja Pelaksanaan Proyek Konstruksi Di Lingkungan Pemerintah Kabupaten Badung. Jurnal Spektran, 9(2), 141-148.

Ghozali, I. 2016. Aplikasi Analisis Multivariate dengan Program IBM SPSS 23, Edisi Kedelapan. Semarang: Badan Penerbit Universitas Diponegoro.

Gumolili, S., Sompie, B., & Rantung, J. 2012. Analisa Faktor-Faktor Penyebab Change Order Dan Pengaruhnya Terhadap Kinerja Waktu Pelaksanaan Proyek Konstruksi Di Lingkungan Pemerintah Provinsi Sulawesi Utara. Jurnal Ilmiah Media Engineering, 2(4), 98522.

Hair, J. F., Ringle, C. M., & Sarstedt, M. 2011. PLS-SEM: Indeed a silver bullet. Journal of Marketing Theory and Practice, 19(2), 139–152.

Hansen, S., Rostiyanti, S. F., & Rif’at, A. 2020. Causes, Effects, and Mitigations Framework of Contract Change Orders: Lessons Learned from GBK Aquatic Stadium Project. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 05019008.

Johnson, L. A. (2008). Relationship of Institutional Methods to Students Engagement in Two Public High Schools. American Secondary Education, Vol. 36, pp. 69-87.

Khamim, M., & Harsanti, W. 2019. Analisis Penyebab Addendum Dan Pengaruhnya Terhadap Efektivitas Sasaran Proyek Pembangunan Gedung Di Kota Malang. PROKONS Jurusan Teknik Sipil, 12(1), 8.

Martanti, A. Y. Y. 2019. Analisis Faktor Penyebab Contract Change Order Dan Pengaruhnya Terhadap Kinerja Kontraktor Pada Proyek Konstruksi Pemerintah. Rekayasa Sipil, 7(1), 32.

M Aziz A., Marthen Riyandi W., Dianita Ratna K., Nugroho Hartono. 2016. Analisa Faktor Penyebab Keterlambatan

Progress Terkait Dengan Manajemen Waktu (Studi Kasus: Pelaksanaan Pembangunan Gedung UPT PP Politeknik Negeri Semarang). Wahana Teknik Sipil, 21 (2), 61-74

Rachman, Tahar. 2018. Kompetensi Pendamping Pembangunan Desa. Angewandte Chemie International Edition, 6(11), 951–952.: 10–27.

Santoso, Singgih. 2006. SPSS Statistik Multivariat. Jakarta: PT. Elex Media Komputindo.

Sugiyono. 2010. Metode Penelitian Pendidikan Pendekatan Kuantitatif, Kualitatif Dan R&D. Bandung: Alfabeta.

Supriyanti, D. 2019. Faktor-Faktor Penyebab Pekerjaan Ulang pada Pelaksana Konstruksi Anggota Gapensi di Kota Malang untuk Proyek Konstruksi. Reka Buana: Jurnal Ilmiah Teknik Sipil dan Teknik Kimia, 4(2), 120-128.

Sutopo, Y. dan A. Slamet. 2017. Statistik inferensial. Andi: Yogyakarta.

Syahbani, S., Wijaya, H. and Andraini, J. 2023. Analisa Faktor Penyebab Contract Change (CCO) Pada Proyek Pembangunan T/L 150 Kv Pasaman-Simpang Empat Section 2 Dan Gi Simpang Empat, Journal of Applied Engineering Scienties, 5(3), pp. 161-175.

Waty, M., & Sulistio, H. 2021. Identifikasi Risiko Change Order Proyek Konstruksi Jalan. Jurnal Muara Sains, Teknologi, Kedokteran Dan Ilmu Kesehatan, 5(1), 225.




DOI: http://dx.doi.org/10.33087/talentasipil.v7i2.600

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.