Analisis Penerapan Faktor-Faktor Green Supply Chain pada Proyek Konstruksi Gedung di Kota Palangka Raya
Abstract
Keywords
Full Text:
PDFReferences
Badan Pusat Statistik. (2021). Berita Resmi Statistik Pertumbuhan Ekonomi Produk Domestik Bruto NO.13/02/TH.XXIV, 5 Februari 2021. (Indonesian).
Badi, S., & Murtagh, N. (2019). Green Supply Chain Management in Construction: A Systematic Literature Review and Future Research Agenda. Journal of Cleaner Production 223 (2019) 312 – 322.
Balasubramanian, S., & Shukla, V. (2017). Green supply chain management: An empirical investigation on the construction sector. Supply Chain Management, 22(1), 58-81.
Banihashemi, S. A., Khalilzadeh, M., Antucheviciene, J., & Edalapanah, S. A. (2022). Identifying and Prioritizing the Challenges and Obstacles of the Green Supply Chain Management in the Construction Industry Using the Fuzzy BWM Method. Buildings.
Enshasi, A., Kochendoerfer, B., & Rizq, N. (2014). An Evaluation of Environmental Impacts of Construction Projects. Revista. 29 (3), 234-254.
Loorbach, D., van Bakel, J.C., & Whiteman, G., Rotmans, J. (2010). Business strategies for transitions towards sustainable systems. Bus. Strateg. Environ. 19 (2), 133-146.
Lu, P., Qian, L., Chu, Z., & Xu, X. (2016). Role of opportunism and trust in construction projects: empirical evidence from China. J. Manag. Eng. 32 (2), 05015009.
Maulani, F., Suraji, A., & Istijono, B. (2014). Analisis Struktur Rantai Pasok Kontruksi pada Pekerjaan Jembatan. Jurnal Rekayasa Sipil (JRS-Unand), 10(2). https://doi.org/10.25077/jrs.10.2.1- 8.2014. (Indonesian).
Ojo, E., Mbowa, C., & Akinlabi, E. T. (2014). Barriers in Implementing Green Supply Chain Management in Construction industry. Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management, (pp. 1974-1981). Bali, Indonesia.
Seuring, S., Gold, S. (2013). Sustainability management beyond corporate bound-aries: from stakeholders to performance. J. Clean. Prod. 56, 1-6.
Shipeng, L. (2011). A study on green supply chain management of enterprises based on self-locking theory. In Proceedings of International Conference on E-Business and E-Government (ICEE) (1-4).
Siregar, S. (2010). Statistika Deskriptif Untuk Penelitian. Jakarta: PT. Rajagrafindo Persada.
Sugiyono (2019) Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta.
Triandini, A., Waluyo, R., & Nuswantoro, W. (2019). Konsep dan Penerapan Waste Management Pada Kontraktor Di Kota Palangka Raya. Jurnal Teknika.
Uda. S. A. K. A, Hatmoko, J. U. D., & Wibowo, M. A. (2021). Influecing Factors of Energy Consumption in Construction: Contractors Perspectives. Proceedings of the 1st International Conference on Economics Engineering and Social Science, InCEESS 2020, 17-18 July, Bekasi, Indonesia.
Widhiawati, I. A. R., Wiranata, A. A., & Wirawan, I. P.Y. (2016). Faktor-faktor Penyebab Change Order Pada Proyek Konstruksi Gedung. Jurnal Ilmiah Teknik Sipil Vol. 20.
Wiguna, P. A., Rachmawati, F., Rohman, M. A., & Setyaning, L. B. (2021). A Framework for Green Supply Chain Management in the Construction Sector: A Case Study in Indonesia. Journal of Industrial Engineering and Mangement, 2021 – 14(4): 788-807.
Yang & Miller. (2008). Karakteristik Responden. Jakarta: Erlangga.
Zhu, J., Fang, M., Shi, Q., Wang, P., & Li, Q. (2018). Contractor Cooperation Mechanism and Evolution of the Green Supply Chain in Mega Projects. Sustainability 2018.
DOI: http://dx.doi.org/10.33087/talentasipil.v7i2.599
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |


