Studi Manajemen Konstruksi Bangunan Spillway dan Intake pada Bendungan Bulango Ulu Provinsi Gorontalo Menggunakan Metode Fasttrack dan Crashing
Abstract
The construction of the Bulango Ulu Dam consists of several stages of work involving many resources, both human, material, and heavy equipment. Therefore, good construction management is needed so that project can be completed on time, cost efficiently, and good quality. This research was conducted with the aim of knowing which method is optimal in accelerating the Bulango Ulu Dam project. In this study, rescheduling is carried out with 2 project acceleration optimization methods, namely the fasttrack and crashing methods. The fasttrack method is done by changing the work dependency logic of the work on the critical path. While the crashing method is done by adding overtime for 2 hours per day to the work on the critical path as well. After optimizing the project, there were changes in term of cost and duration. In the fasttrack method, it has a cost efficiency of 0,26% and a duration effectiveness of 5,90%. While the crashing method has a cost efficiency of 1,27% and duration effectiveness of 4,46%. Based on the research conducted, the fasttrack method has a superior duration effectiveness than the crashing method which is 5,90%. While in terms of cost efficiency, the crashing method is superior to the fasttrack method by 1,27%.
Keywords
Full Text:
PDFReferences
Abdul, F. F., Maryati, S., & Koem, S. (2024). Analisis Persepsi dan Strategi Adaptasi Masyarakat Terhadap Bencana Banjir di Kota Gorontalo. 12(1), 493–503.
Al-bab, U., & Hepiyanto, R. (2024). Analisa Manajemen Waktu Pekerjaan Renovasi Pembangunan Cafe Terakota. Jurnal Talenta Sipil, 7(1), 142. https://doi.org/10.33087/talentasipil.v7i1.400
Alifudin, S. A., Juwono, P. T., & Cahya, E. N. (2024). Studi Manajemen Konstruksi Proyek Rehabilitasi Spillway. Jurnal Teknologi Dan Rekayasa Sumber Daya Air, 04(01), 228–238.
Badan Penanggulangan Bencana Daerah Jawa Timur. (2023). Banjir: Penyebab, Pengertian, dan Dampaknya. https://web.bpbd.jatimprov.go.id/2023/10/19/banjir-pengertian-penyebab-dan-dampaknya/#:~:text=Banjir disebabkan oleh berbagai faktor,yang meningkat dapat menyebabkan banjir.
Candra, Y. F. K., Juwono, P. T., & Cahya, E. N. (2023). Studi Manajemen Konstruksi Proyek Pembangunan Infrastruktur Pengendali Banjir Sungai Welang di Kota Pasuruan. Jurnal Teknologi Dan Rekayasa Sumber Daya Air, 3(1), 12–21. https://doi.org/10.21776/ub.jtresda.2023.003.01.02
Firdaus, A. W., Juwono, P. T., & Cahya, E. N. (2022). Studi Manajemen KonstruksiRehabilitasi Saluran Irigasi MricanKanan Kabupaten Jombang MenggunakanMetode Fasttrackdan Crashing. Jurnal Teknologi Dan Rekayasa Sumber Daya Air, 3(1), 263–273.
Kementerian Pekerjaan Umum. (2016). Pedoman Umum Analisa Harga Satuan Pekerjaan. 11. https://www.academia.edu/download/55451947/PerMen_No_11-PRT-M-2013.pdf
Muhammad, D. A., Juwono, P. T., & Cahya, E. N. (2024). Studi Manajemen Konstruksi Proyek Pembangunan Pelimpah Pada Bendungan Bendo Metode Fasttrack dan Crashing. Jurnal Teknologi Dan Rekayasa Sumber Daya Air, 4(1), 640–644. https://doi.org/10.21776/ub.jtresda.2024.004.01.054
Peraturan Pemerintah Republik Indonesia. (2021). Peraturan Pemerintah Nomor 35 Tahun 2021 Tentang Perjanjian Kerja Waktu Tertentu, Alih Daya, Waktu Kerja dan Waktu Istirahat, dan Pemutusan Hubungan Kerja [Government Regulation Number 35 of 2021 concerning Work Agreements for Certain Time, Outsourcing, W. Peraturan Pemerintah Republik Indonesia Nomor 35 Tahun 2021, 086142, 42. https://peraturan.bpk.go.id/Home/Details/161904/pp-no-35-tahun-2021
Pratama, M. L. T., Juwono, P. T., & Cahya, E. N. (2024). Studi Manajemen Proyek Pembangunan Main Dam pada. Jurnal Teknologi Dan Rekayasa Sumber Daya Air, 04(01), 605–615.
DOI: http://dx.doi.org/10.33087/talentasipil.v7i2.573
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |