Perencanaan Sumber Daya Material pada Pekerjaan Arsitektur dengan Material Requerement Planning (MRP) pada Proyek Gedung Bertingkat

Muh. Darul Muttaqin, I Nyoman Dita Pahang Putra

Abstract


Construction in Indonesia is one of the government's top priorities in an effort to improve the welfare of the society. Construction planning must be carefully planned in order to achieve efficiency in project implementation, in terms of time and cost. A construction project requires planning and controlling material inventory. The purpose of material planning and control is so that construction projects can run smoothly, effectively and efficiently. Material planning and control can be analyzed using the material requirements planning (MRP) method. In this study, using economic order quantity (EOQ) and period order quantity (POQ) techniques. Cost budget design data, s-curves, work unit price analysis, and work progress reports are the data components to be processed. The results showed the cost of procurement of materials needed with the EOQ technique, namely: purchase cost of IDR 8,466,623,718.49, ordering cost of IDR 1,598,050.00, and storage cost of IDR 8,942,979.62. The total cost required is IDR 8,477,164,748.11. Furthermore, for the POQ technique, namely: purchase cost of IDR 8,466,623,718.49, ordering cost of IDR 1,598,050.00 and storage cost of IDR 9,674,554.05. The total cost required is IDR 8,477,896,322.53 Comparison of the costs required from the EOQ and POQ techniques can be concluded that Material Requirement Planning (MRP) using the Economic Order Quality (EOQ) technique is less costly than the Period Order Quantity (POQ) technique. Material procurement using Economic Order Quality (EOQ) is more effective. This is because the EOQ technique requires less costly / economic procurement compared to the POQ technique. In addition, with the application of the EOQ technique, there is a clearer material ordering schedule and the amount of material ordered is in accordance with the needs so that the material storage is not too much.


Keywords


Material procurement, economic order quantity (EOQ), period order quantity (POQ), construction project.

Full Text:

PDF

References


Bayudhana, Z. D., & Kamandang, Z. R. (2023). Material Requirement Planning Berdasarkan Hasil Resource Leveling Pada Proyek Konstruksi Jalan Tol. Jurnal RADIAL: Jurnal Peradaban Sains, Rekayasa dan Teknologi, 11(1), 259-271. doi:https://doi.org/10.37971/radial.v11i1.392

Fachrurrozi, & Almahdy, I. (2016). Lot sizing material requirement planning pada produk tipe wall mounting di industri box panel. Penelitian dan Aplikasi Sistem dan Teknik Industri, 10(3), 182840. https://publikasi.mercubuana.ac.id/index.php/pasti/article/view/1714/1313

Febriantoro, H., Winanda, L. A. R., Nainggolan, T. H., Manaha, Y. P., & Indra, S. (2023). Manajemen Pengendalian Material Pada Bangunan Rumah Sakit Umum Daerah Kota Masohi. Paper presented at the Seminar Nasional Teknik Sipil. doi:https://doi.org/10.56071/sintesi.v1i1.690

Jonsson, P., & Mattsson, S. A. (2006). A longitudinal study of material planning applications in manufacturing companies. International Journal of Operations & Production Management, 26(9), 971-995. doi:https://doi.org/10.1108/01443570610682599

Lestari, S., & Nurdiansah, D. D. (2018). Analisa perencanaan kebutuhan material pada perusahaan manufaktur kertas dengan metode material requirement planning (MRP). Jurnal INTECH Teknik Industri Universitas Serang Raya, 4(2), 59-64. doi: https://doi.org/10.30656/intech.v4i2.956

Maddeppungeng, A., Setiawati, D. N., & Tuqa, B. (2021). Perencanaan Persediaan Material Dengan Menggunakan Metode Material Requirement Planning (MRP) Pada Proyek Apartemen (Studi Kasus: Proyek Pembangunan Nines Plaza & Residence Tower B). Fondasi: Jurnal Teknik Sipil 10(1), 69-80. https://jurnal.untirta.ac.id/index.php/jft/article/view/10624/7175

Putri, A. S., & Rosydi, B. I. (2020). Analysis of raw material inventory for insecticide packaging bottle with material requirement planning: a case study. Jurnal Sistem dan Manajemen Industri 4(2), 93-98. doi: https://doi.org/10.30656/jsmi.v4i2.2765

Ramadhan, M. A. I., Rafie, R., & Nuh, S. M. (2023). Perencanaan Material dengan Penerapan Metode Material Requirement Planning (MRP) dengan Penggunaan Lot For Lot (LFL) dan Period Order Quantity (POQ) Sebagai Teknik Lot Sizing dalam Pengendalian Bahan (Studi Kasus: Renovasi Pasar Kapuas Indah dan Mall Pelayanan Publik (Multiyears) Kota Pontianak). JeLAST: Jurnal PWK, Laut, Sipil, Tambang, 10(2). doi:http://dx.doi.org/10.26418/jelast.v10i2.67922

Romadhon, A. F., & Tenriajeng, A. T. (2020). Analisis Faktor-Faktor Penyebab Keterlambatan Kerja Pada Proyek Pembangunan Gedung Bertingkat Di Indonesia. Jurnal Proyek Teknik Sipil, 3(1), 10 doi:https://doi.org/10.14710/potensi.2020.7023

Tannady, H., & Pratama, Y. D. (2019). Analisis Perencanaan Persediaan Bahan Baku Menggunakan Metode Economic Order Quantity Dengan Pertimbangan Stockout Cost (Studi Kasus Pada PT. Multi Logam Presisi). Jurnal Spektrum Industri, 17(2), 93. doi:http://dx.doi.org/10.12928/si.v17i2.13944

Wahyuni, A., & Syaichu, A. (2015). Perencanaan Persediaan Bahan Baku dengan Menggunakan Metode Material Requirement Planning (MRP) Produk Kacang Shanghai pada Perusahaan Gangsar Ngunut-Tulungagung. Spektrum Industri, 13(2), 141. doi:http://dx.doi.org/10.12928/si.v13i2.2692




DOI: http://dx.doi.org/10.33087/talentasipil.v7i2.572

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.