Analisis Resource Leveling Menggunakan Precedence Diagram Method (PDM) pada Gedung Mako Lanal Balikpapan
Abstract
The construction of the Mako Lanal building is to realize the fulfillment of the needs of facilities and facilities / infrastructure to support the main tasks and functions of the Navy. With the planned cost of this building construction project amounting to IDR 11,884,285,000.00. With a duration of 210 days starting on May 06 - December 01, 2021. Researchers conducted rescheduling using the Precedence Diagram Method (PDM) using the Microsoft Project 2016 program. The results of the calculation of the amount of labor before the leveling of labor are uneven and fluctuations occur, with a maximum workforce of 76 workers. therefore, the leveling of labor will be carried out. By rescheduling the relationship between jobs. after smoothing the workforce the maximum number after smoothing is 38 workers.
Keywords
Full Text:
PDFReferences
Ashworth, allan. (1988). PERENCANAAN BIAYA BANGUNAN. JAKARTA: PT. Gramedia Pustaka Utama.
Badri, Sofwan. (1997). DASAR-DASAR NETWORK PLANNING. Jakarta : Rineka Cipta.
Husen, Abrar. (2010). MANAJEMEN PROYEK. SERPONG: ANDI OFFSET.
Joe Daniel Hutagaol, Sendi, Wibowo, M. A., & D.S., T. (2013). PERBANDINGAN METODE CRITICAL PATH METHOD (CPM), PRECEDENCE DIAGRAM METHOD (PDM), DAN LINE OF BALANCE (LOB) TERHADAP PROYEK REPETITIF. 1–23.
Kalam, A. M., Pratiwi, R., & Hendriyani, I. (2022). KLINIK KORPRI DENGAN METODE PERATAAN TENAGA KERJA (Studi Kasus Proyek Renovasi Klinik Korpri Sepinggan Baru Balikpapan) SKRIPSI Universitas balikpapan 2022.
Leonard, A., Dundu, T. A. K. T., & Walangitan, D. R. O. (2019). PERATAAN TENAGA KERJA DENGAN MENGGUNAKAN MICROSOFT PROJECT PADA PROYEK REHABILITASI PUSKESMAS MINANGA. Jurnal Sipil Statik, 7(10), 1261–1268.
Maharany, Leny dan Fajarwati (2006). ANALISIS OPTIMASI PERCEPATAN DURASI PROYEK DENGAN METODE LEAST COST ANALYSIS.
Rahmaniah, L., Pratiwi, R., & Hendriyani, I. (2022). REHABILITASI SEKOLAH SYARIKAT ISLAM MADINATUL IMAN THE LEVELLING OF WORKERS ANALYSIS ON THE SCHOOL REHABILITATION PROJECT MADINATUL IMAN ISLAMIC SOCIETY IN BALIKPAPAN USING MS PROJECT UNIVERSITAS BALIKPAPAN. 05.
S. Mubarak, (2015). CONSTRUCTION PROJECT SCHEDULING AND CONTROL.
Serra, T., & Gil, J. M. (2013). PRICE VOLATILITY IN FOOD MARKETS: CAN STOCK BUILDING MITIGATE PRICE FLUCTUATIONS?. EUROPEAN REVIEW OF AGRICULTURAL ECONOMICS, 40(3), 507-528. doi: https://doi.org/10.1093/erae/jbs041
DOI: http://dx.doi.org/10.33087/talentasipil.v7i2.488
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |


