Pengaruh Clash Detection Pada Proses Perencanaan Biaya Pada Laboratorium PUT

Alwan Izzudin, Irika Widiasanti

Abstract


One effort to avoid repetitive work due to errors in construction project planning can be detected from the start by implementing BIM (Building Information Modeling) which can carry out collision analysis (Clash detection) in each discipline of structural work, architecture, MEP and other disciplines. Before the existence of BIM, clashes that occurred in the building construction process were one of the factors causing work costs to increase. So implementing Building Information Modeling is one effort to avoid these problems. In this research, clash detection analysis will be carried out in the PUT Lab building in the structural, architectural and MEP work disciplines. The stages carried out in this research were first carrying out 3D Modeling using Autodesk Revit software on the PUT Lab building, then carrying out clash detection analysis using Autodesk Naviswork software and calculating the cost budget plan for each job affected by clash detection. After carrying out clash detection, clashes can be found that occur in the structural, architectural and MEP work disciplines which after calculating the budget plan can save work costs of up to 80 million rupiah.


Keywords


Building Information Modelling, Clash detection, Cost Budget Plan

Full Text:

PDF

References


Eastman, C.M., 2011. BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. John Wiley & Sons.

Nugrahini, F.C. and Permana, T.A., 2020. Building Information Modelling (BIM) dalamTahapan Desain dan Konstruksi di Indonesia, Peluang Dan Tantangan (Studi Kasus Perluasan T1 Bandara Juanda Surabaya). Agregat, 5(2), pp.459-467.

Adhi, R.P., Berlian, C.A., Hidayat, A. and Nugroho, H., 2016. Perbandingan efisiensi waktu, biaya, dan sumber daya manusia antara metode Building Information Modelling (BIM) dan konvensional (studi kasus: perencanaan gedung 20 lantai). Jurnal Karya Teknik Sipil, 5(2), pp.220-229..

Prajawati, D.A. and Soenyoto, S., 2013. Sistem Pengendalian Konstruksi Pada Proyek Perluasan Kantor Dan Halaman Parkir Di Jababeka Cikarang Bekasi. Bentang: Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil, 1(2), pp.106-119.

Heryanto, S. and Subroto, G., 2020. KAJIAN PENERAPAN BUILIDNG INFORMATION MODELLING (BIM) DI INDUSTRI JASA KONSTRUKSI INDONESIA. Architecture Innovation, 4(2), pp.193-212.

Ramadiaprani, R., 2012. Aplikasi building information modeling (bim) Menggunakan software tekla structures 17 pada Konstruksi gedung kuliah tiga lantai fahutan Ipb, Bogor.

Afsari, K., 2012. Building Information Modeling in Concept Design Stage. Master of Science in Digital Architectural Design, University of Salford, Manchester.

Park, H.J., 2008. Evolution+ BIM: The utilization of building information modelling at an early design stage. CAADRIA 2008, pp.552-559.

Fundra, Y., 2014. Evaluasi Penerapan Building Information Modelling (BIM) Pada Industri Konstruksi Indonesia (Doctoral dissertation, Thesis, Tidak Dipublikasikan, Magister Teknik Sipil Universitas Diponegoro, Semarang).

Arissaputra, S. and Yaya, Y., 2023. PENGARUH CLASH DETECTION PADA BIAYA PEMBANGUNAN APARTEMEN DI JAKARTA. Technologic Politeknik Astra, 14(1).




DOI: http://dx.doi.org/10.33087/talentasipil.v7i1.466

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.