Analisis Keterlambatan Proyek PT. PP Persero Tbk Pada Pembangunan Gedung MRT Dengan Menggunakan Lean Six Sigma Framework

Mochamad Aldi Wijaya, Irika Widiasanti

Abstract


In general, each construction project has a planned completion time with a set scheduling so that the project can run well. Indonesia is trying to develop infrastructure and public facilities such as the MRT Building Construction Project. This research was conducted at the MRT HUB Building Construction Project Simpang Temu Dukuh Atas Jalan Kendal No. 25, Menteng, Central Jakarta, Special Capital Region of Jakarta 10310 at PT. PP (Persero), Tbk This research aims to obtain factors that cause project delays. This research uses the concept of lean six sigma with the DMAIC phase (Define, Measure, Analyze, Improve, and Control). After being identified, the construction experienced delays in work completion caused by several factors such as overpurchase, delay, and inventories. Lean six sigma helps in finding solutions to minimize delays including not buying goods excessively so as not to cause delays so that workers can work properly without having to wait for the area to be worked on.


Keywords


Work delay, Lean Six Sigma, DMAIC.

Full Text:

PDF

References


Abdelhamid,T dan Mohammed, T., (2005). “Understanding Percent Plan Complete Data Using Statistical Quality Control Chart”, International Workshop On Innovations In Materials And Design Of Civil Infrastructure, December 28 – 29, Cairo, Egypt

Arifiyanti, E. F. (2018). Analisis Penjadwalan Ulang Proyek Akibat Keterlambatan Menggunakan Critical Path Method Studi Kasus: Pembangunan Gudang Tangkapan Dan Sarana Prasarana Kantor Wilayah DJBC Jawa Timur I (Doctoral dissertation, Universitas 17 Agustus 1945 Surabaya).

Carlo, N., Rita, E., Nandi, & Jaya, I. (2019). Dampak dan Solusi Akibat Keterlambatan Proyek Konstruksi Jalan di Sumatera Barat. Proseding Konferensi Nasional Teknik Jalan ke 10, November 4-7, Jakarta, Indonesia http://103.12.84.135/berita/detail/38/PROSIDING-Konferensi- Nasional-Teknik-Jalan-ke-10-KNTJ-10

Gespersz, V. (2007), “Lean Six Sigma For Manufacturing And service Industries”, Gramedia Pustaka Utama, Jakarta.

Hartono, T., Despa., Septiana, T. (2023). Penerapan Lean Construction Untuk Meningkatkan Produktivitas Pada Pekerjaan Capping Layer Di Proyek Tol Kayu Agung - Palembang - Betung Paket II Seksi 3. Prosiding Seminar Nasional Keinsinyuran (SNIP) IV

Koskela, L. (1992), “Application of The Production Philosophy To Construction”, Stanford University.

Messah, Y.A., Widodo, T., dan Adoe, M.L. (2013), “Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi Gedung di Kota Kupang”, Jurnal Teknik Sipil, Vol.II, No.2.

Nandi. (2019). Analisis penyebab dan Dampak Keterlambatan Proyek Konstruksi Jalan Provinsi Sumatera Barat. Padang: M.Sc Thesis, Universitas Bung Hatta.

Nyata, D. S. (2017). Analisis Keterlambatan Pada Proyek PT. Jatim Taman Steel di Gresik Dengan Menggunakan Lean Six Sigma Framework.

Saini dan Sujata. (2013), “Lean Six Sigma-Process Improvement Techniques”, Internasional Journal Of Recent Research and Review, Vol. VI, Iss. 3.

Zahara, F. (2014), “Pengendalian Kualitas Part Trim Rear Quarter Right APV Arena Dengan Menggunakan Metode Six Sigma Di PT. Suzuki Indomobil Motor”, Jurnal Optimasi Sistem Industri, Vol.13, No.1. 486-502.




DOI: http://dx.doi.org/10.33087/talentasipil.v7i1.436

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.