Analisis Biaya dan Waktu pada Proyek Jembatan (Studi Kasus Proyek Pembangunan Jembatan Candisari Sambeng Kabupaten Lamongan) dengan Menggunakan Metode Earned Value

M. Jazuli, Rio Rahma Dhana

Abstract


Project management has three main objectives when carrying out construction projects including cost, quality, and time. If a project can be completed with a predetermined level of quality or quality, then the project has been successfully managed. This research uses earned value method. That is a method of knowing costs based on the work that has been done. Thus we can find out whether the Candisari Sambeng bridge construction project in Lamongan Regency is faster or longer than the schedule that has been made. CV value has a negative value in the 15th period, namely -Rp 18,078,304 SV value there is a negative value until the 18th period with a value of -Rp 494,817,905 CPI value found in the 15th week period with a value of 0.995. The SPI value in the 18th period with a final SPI value of 0.903 estimated cost (EAC) is. IDR 5,166,992,802 estimated EAS time for the jembata replacement project of 21,320 weeks. If the performance is considered the same project, the cost required to complete the construction of the bridge is Rp 5,166,992,802 from the total project budget of Rp 5,346,534,000 so that it gets a profit of Rp 179,541,198, and the time needed to complete the construction work is 21,320 weeks from the specified time of 21 weeks so that the project implementation is delayed for 0,320 weeks.y.


Keywords


Project, Delay, Cost, Time, Earned Value

Full Text:

PDF

References


Callahan, M. 1992. Construction Project Scheduling, Mc Graw Hill, New York

Ervianto, W.I. 2002. Manajemen Proyek Konstruksi.Penerbit Andi. Yogyakarta

Johan, A. F. (2020). Analisis Earned Value Terhadap Biaya dan Waktu Pada Proyek Pembangunan Gudang Farmasi. Universitas Islam Indonesia Yogyakarta, 61(1), 41–49

Moleong, Lexy J. (1991). Metode Penelitian Kualitatif. Bandung: PT. Remaja Rosdakarya.

PMBOK, 2013. Project Mnagement Body Of Knowledge Guide. Newtown Square: Project Management Institute, Inc.

Pratiwi, 2012, Pengendalian Biaya Dan Waktu Puskesmas Tabaringan, Universitas Hasanuddin, Makassar.

Rahman, Irfanur. 2010. Earned Value Analysis Terhadap Biaya Pada Proyek Pembangunan Gedung. Surakarta: Universitas Sebelas Maret.

Santoso,Budi. 2003. Manajemen Proyek. Penerbit Guna Widya Anonim, Surabaya

Soeharto, Iman. 1995. Manajemen Proyek Dari Konseptual Sampai Operasional. Penerbit Erlangga. Jakarta.

Soemardi B.W, dkk., 2007 Konsep Earned Value untuk Pengelolaan Proyek Konstruksi, Penerbit ITB Bandung




DOI: http://dx.doi.org/10.33087/talentasipil.v7i1.376

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.