Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) dalam Pelaksanaan Proyek Konstruksi di Muara Sabak
Abstract
Risk Management Of Occupational Safety And Health (K3) In Construction Project Implementation In Muara Sabak aims to find out how the implementation of K3 and identify the K3 risks that exist in the project as well as to control the risks. In this construction project, the researcher only reviewed the AC-WC layer work. The results of this study obtained risk levels for AC-WC layer work are classified as very high risk as much as 10%, high risk as much as 40% and medium risk as much as 50%. The appraisal method that reseacher used is Matrix risks scouring by AS/NZS 4360 : 2004.
Keywords
Full Text:
PDFReferences
Australian Standard/ New Zaeland, 2004. Handbook Risk Management Guidlines Companion to AS/NZS 4360 : 2004, Sydney and Wellington.
Burtanto (2020). Panduan Praktis Keselamatan & Kesehatan Kerja untuk Industri. PUSTAKABARUPRESS, Yogyakarta.
Ervianto, I.W. (2005). Manajemen Proyek Konstruksi Edisi Revisi. Yogyakarta. Andi.
Gabby E. M. Soputan (2014). Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3), Jurnal Pascasarjana Teknik Sipil Universitas Sam Rarulangi Vol.4. No.4, Desember 2014.
OHSAS 18001:2007. Occupational Health And Safety Management System – Requirements.
Peraturan Menteri Ketenagakerjaan Republik Indonesia Nomor 5 Tahun 2018 Tentang Keselamatan Dan Kesehatan Kerja Lingkungan Kerja.
Ramli, Soehatman (2010). Pedoman Praktis Manajemen Risiko dalam prespektif K3 OHS Risk Manajemen. Dian Rakyat Jakarta.
Sugiyono (2017). Metode Penelitian Kuantitatif, Kualitatif dan R&D. Cetakan ke-26, ALFABETA, cv, Bandung.
Sukirman, Silvia. 2003. Beton Aspal Campuran Panas. Grafika Yuana Marga, Bandung.
Widiasanti, Irika dan Lenggogeni. (2013). Manajemen konstruksi. PT Remaja Rosdakarya, Bandung.
DOI: http://dx.doi.org/10.33087/talentasipil.v6i1.193
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |