Analisis Koordinasi Antar Pihak pada Proyek Konstruksi Bangunan Gedung Melalui Studi Literatur

Laras Alencia Eka Putri, Tri Kuncoro, Mei Fajri Anugrah Sukma, Retno Dwi Rahmawati

Abstract


Building construction projects involve various parties with different roles, responsibilities, and interests, requiring effective coordination to achieve the established time, cost, and quality targets. The complexity of building construction projects demands the integration of various activities, resources, and decision-making processes among the parties involved. Lack of coordination can lead to various issues such as work delays, communication errors, conflicts between parties, and discrepancies between project outcomes and planning. This research aims to analyze coordination among parties in building construction projects through a literature study approach. The research method used is a literature study with a descriptive qualitative approach through the stages of problem identification, literature search, literature selection, content analysis, and synthesis of research results based on relevant national and international scientific articles. The research results show that the effectiveness of coordination is influenced by factors such as communication, information exchange, stakeholder involvement, decision-making, and information management systems. Coordination obstacles found include delayed information, lack of communication, unclear task distribution, and differing objectives among parties. This study recommends the implementation of regular coordination meetings, increased stakeholder involvement, and the application of an integrated information system to enhance the effectiveness of building construction project coordination.

Keywords


building construction, communication, project coordination, project management, stakeholder.

Full Text:

PDF

References


Agyekum-Mensah, G., & Knight, A. D. (2017). The professionals perspective on the causes of project delay in construction projects. Engineering, Construction and Architectural Management, 24(5), 828–841. https://doi.org/10.1108/ECAM-03-2016-0085

Al Nahyan, M. T., Sohal, A., Hawas, Y., & Fildes, B. (2019). Communication, coordination, decision-making and knowledge-sharing: A case study in construction management. Journal of Knowledge Management, 23(9), 1764–1781. https://doi.org/10.1108/JKM-08-2018-0503

Alaloul, W. S., Liew, M. S., Zawawi, N. A. W. A., & Mohammed, B. S. (2016). Identification of coordination factors affecting building projects performance. Alexandria Engineering Journal, 55(3), 2689–2698. https://doi.org/10.1016/j.aej.2016.06.010

Bygballe, L. E., Swärd, A., & Vaagaasar, A. L. (2016). Coordinating in construction projects and the emergence of synchronized readiness. International Journal of Project Management, 34(8), 1479–1492. https://doi.org/10.1016/j.ijproman.2016.08.006

Chang, A. S., & Shen, F.-Y. (2009). Coordination needs and supply of construction projects. Engineering Management Journal, 21(4), 44–57. https://doi.org/10.1080/10429247.2009.11431844

Chen, Q., Hall, D. M., Adey, B. T., & Haas, C. T. (2021). Identifying enablers for coordination across construction supply chain processes: A systematic literature review. Engineering, Construction and Architectural Management, 28(4), 1083–1113. https://doi.org/10.1108/ECAM-05-2020-0299

Creswell, J. W. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). SAGE Publications.

El-Sawalhi, N., & Hammad, S. (2015). Factors affecting stakeholder management in construction projects in the Gaza Strip. International Journal of Construction Management, 15(2), 157–169. https://doi.org/10.1080/15623599.2015.1035626

Ervianto, W. I. (2005). Manajemen proyek konstruksi (Edisi revisi). Andi.

Formoso, C. T., & Isatto, E. L. (2011). Three theoretical perspectives for understanding inter-firm coordination of construction project supply chains. Construction Economics and Building, 11(3), 1–17. https://doi.org/10.5130/AJCEB.v11i3.2198

Harsian, H. S. (2021). Faktor penghambat komunikasi efektif di proyek konstruksi pemerintah dari perspektif penyedia jasa. Abstract of Undergraduate Research, Faculty of Post Graduate, Bung Hatta University, 17(3), 1–9. https://ejurnal.bunghatta.ac.id/index.php/JPSC2/article/view/19833

Ibdayanti, D. R., Oktavani, C. Z., & Husin, S. (2023). Kepentingan relatif faktor-faktor integrasi manajemen komunikasi pada proyek konstruksi di Banda Aceh. JMTS: Jurnal Mitra Teknik Sipil, 6(1), 57–68. https://doi.org/10.24912/jmts.v6i1.20781

Indah, A. (2018). Identifikasi risiko faktor-faktor komunikasi yang berpengaruh pada kinerja waktu. Jurnal Konstruksi dan Infrastruktur, 4(4), 55–63. https://doi.org/10.33603/jki.v4i4.2253

Iqbal, M., & Susanto, A. (2024). Peran stakeholder pada proyek konstruksi yang berbasis integrated project delivery (IPD). Jurnal Rekayasa Konstruksi Mekanika Sipil, 8(1), 1–12. https://ejournal.ust.ac.id/index.php/JRKMS/article/view/4280

Jariski, M. (2025). Evaluation of risk-based communication management in PT XYZ design building projects to improve time performance. Journal of Economics, Technology, and Business (JETBIS), 4(5), 186-195. https://jetbis.al-makkipublisher.com/index.php/al/article/view/182

Jayaningrat, D. P., Waluyo, R., Dewantoro, D., & Yan, D. (2024). Penerapan faktor-faktor komunikasi pada proyek konstruksi di Kota Palangka Raya. Jurnal Penelitian UPR, 4(2), 87–97. https://doi.org/10.52850/jptupr.v4i2.15776

Jha, K. N., & Iyer, K. C. (2006). Critical determinants of project coordination. International Journal of Project Management, 24(4), 314–322. https://doi.org/10.1016/j.ijproman.2005.11.005

Krippendorff, K. (2018). Content analysis: An introduction to its methodology (4th ed.). SAGE Publications.

Mentari, D. S., & Mutaqi, A. S. (2024). Faktor komunikasi dan kolaborasi dalam integrated project delivery. Jurnal Rekayasa Konstruksi Mekanika Sipil, 7(1), 34–45. https://ejournal.ust.ac.id/index.php/JRKMS/article/view/3165/2997

Mojidra, R., Sharma, A., & Patel, P. (2025). Communication pathways and project success : analyzing stakeholder coordination impacts on construction outcomes. Journal of Construction Engineering and Technology Management, 4(1), 23–35. https://journals.stmjournals.com/jocetm/article%3D2025/view%3D216133

Ohag, S., Williams, K., & Brown, J. (2023). Critical coordination factors affecting design and build projects. Journal of Construction Project Management, 18(2), 120–136. https://doi.org/10.26418/ijeas.2023.3.01.59-71

Peli, M., Utama, W. P., Jumas, D. Y., Zulherman, Z., Sesmiwati, S., Ariani, V., Roza, F., & Thaha, P. (2022). Faktor determinasi komunikasi efektif di proyek konstruksi dari perspektif multiple stakeholders. Jurnal Studi Komunikasi dan Media, 26(2), 163–178. https://doi.org/10.17933/jskm.2022.4896

Snyder, H. (2019). Literature review as a research methodology: An overview and guidelines. Journal of Business Research, 104, 333–339. https://doi.org/10.1016/j.jbusres.2019.07.039

Soeharto, I. (1999). Manajemen proyek: Dari konseptual sampai operasional. Erlangga.

Sugiyono. (2019). Metode penelitian kuantitatif, kualitatif, dan R&D. Alfabeta.

Susilo, Agustapraja, H. R., & Arif, S. (2026). Analisis waktu dan biaya menggunakan metode time cost trade off rehabilitasi gedung kantor Inspektorat Daerah Kabupaten Tuban. Jurnal Talenta Sipil. http://dx.doi.org/10.33087/talentasipil.v9i1.1043

Turkulainen, V., Aaltonen, K., & Lohikoski, P. (2015). Managing project stakeholder communication: The Qstock festival case. Project Management Journal, 46(6), 74–91. https://doi.org/10.1002/pmj.21547

Utama, W. P., Sikumbang, N., Warman, H., Zulherman, Z., Fuadi, A. B., & Agus, E. (2024). Kajian eksploratori hubungan praktik komunikasi dan hasil proyek konstruksi di Sumatera Barat. Jurnal Teknik Sipil, 31(2), 219–226. https://doi.org/10.5614/jts.2024.31.2.12

Yang, Y., Wei, Z., & Zhang, Z. (2023). Stakeholder relationship in construction projects: A mixed methods review. Buildings, 13(12), 3122. https://doi.org/10.3390/buildings13123122

Yudha, F. P., & Mutaqi, A. S. (2024). Literature review: Pemanfaatan building information modeling (BIM) dalam konstruksi sebagai alat komunikasi dan kolaborasi dalam integrated project delivery. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, 3(4), 214–226. https://doi.org/10.61132/konstruksi.v3i4.1018

Zebua, F. D., Harita, H., & Giawa, J. F. K. (2025). Peran Komunikasi Dan Koordinasi Tim Dalam Keberhasilan Manajemen Proyek Konstruksi. Jurnal Riset Dan Inovasi Teknik Sipil, 1(1), 15–21. https://ojs.unias.ac.id/index.php/jurasi/article/view/530




DOI: http://dx.doi.org/10.33087/talentasipil.v9i2.1409

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.