Analisis Koordinasi Antar Pihak pada Proyek Konstruksi Bangunan Gedung Melalui Studi Literatur
Abstract
Keywords
Full Text:
PDFReferences
Agyekum-Mensah, G., & Knight, A. D. (2017). The professionals perspective on the causes of project delay in construction projects. Engineering, Construction and Architectural Management, 24(5), 828–841. https://doi.org/10.1108/ECAM-03-2016-0085
Al Nahyan, M. T., Sohal, A., Hawas, Y., & Fildes, B. (2019). Communication, coordination, decision-making and knowledge-sharing: A case study in construction management. Journal of Knowledge Management, 23(9), 1764–1781. https://doi.org/10.1108/JKM-08-2018-0503
Alaloul, W. S., Liew, M. S., Zawawi, N. A. W. A., & Mohammed, B. S. (2016). Identification of coordination factors affecting building projects performance. Alexandria Engineering Journal, 55(3), 2689–2698. https://doi.org/10.1016/j.aej.2016.06.010
Bygballe, L. E., Swärd, A., & Vaagaasar, A. L. (2016). Coordinating in construction projects and the emergence of synchronized readiness. International Journal of Project Management, 34(8), 1479–1492. https://doi.org/10.1016/j.ijproman.2016.08.006
Chang, A. S., & Shen, F.-Y. (2009). Coordination needs and supply of construction projects. Engineering Management Journal, 21(4), 44–57. https://doi.org/10.1080/10429247.2009.11431844
Chen, Q., Hall, D. M., Adey, B. T., & Haas, C. T. (2021). Identifying enablers for coordination across construction supply chain processes: A systematic literature review. Engineering, Construction and Architectural Management, 28(4), 1083–1113. https://doi.org/10.1108/ECAM-05-2020-0299
Creswell, J. W. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). SAGE Publications.
El-Sawalhi, N., & Hammad, S. (2015). Factors affecting stakeholder management in construction projects in the Gaza Strip. International Journal of Construction Management, 15(2), 157–169. https://doi.org/10.1080/15623599.2015.1035626
Ervianto, W. I. (2005). Manajemen proyek konstruksi (Edisi revisi). Andi.
Formoso, C. T., & Isatto, E. L. (2011). Three theoretical perspectives for understanding inter-firm coordination of construction project supply chains. Construction Economics and Building, 11(3), 1–17. https://doi.org/10.5130/AJCEB.v11i3.2198
Harsian, H. S. (2021). Faktor penghambat komunikasi efektif di proyek konstruksi pemerintah dari perspektif penyedia jasa. Abstract of Undergraduate Research, Faculty of Post Graduate, Bung Hatta University, 17(3), 1–9. https://ejurnal.bunghatta.ac.id/index.php/JPSC2/article/view/19833
Ibdayanti, D. R., Oktavani, C. Z., & Husin, S. (2023). Kepentingan relatif faktor-faktor integrasi manajemen komunikasi pada proyek konstruksi di Banda Aceh. JMTS: Jurnal Mitra Teknik Sipil, 6(1), 57–68. https://doi.org/10.24912/jmts.v6i1.20781
Indah, A. (2018). Identifikasi risiko faktor-faktor komunikasi yang berpengaruh pada kinerja waktu. Jurnal Konstruksi dan Infrastruktur, 4(4), 55–63. https://doi.org/10.33603/jki.v4i4.2253
Iqbal, M., & Susanto, A. (2024). Peran stakeholder pada proyek konstruksi yang berbasis integrated project delivery (IPD). Jurnal Rekayasa Konstruksi Mekanika Sipil, 8(1), 1–12. https://ejournal.ust.ac.id/index.php/JRKMS/article/view/4280
Jariski, M. (2025). Evaluation of risk-based communication management in PT XYZ design building projects to improve time performance. Journal of Economics, Technology, and Business (JETBIS), 4(5), 186-195. https://jetbis.al-makkipublisher.com/index.php/al/article/view/182
Jayaningrat, D. P., Waluyo, R., Dewantoro, D., & Yan, D. (2024). Penerapan faktor-faktor komunikasi pada proyek konstruksi di Kota Palangka Raya. Jurnal Penelitian UPR, 4(2), 87–97. https://doi.org/10.52850/jptupr.v4i2.15776
Jha, K. N., & Iyer, K. C. (2006). Critical determinants of project coordination. International Journal of Project Management, 24(4), 314–322. https://doi.org/10.1016/j.ijproman.2005.11.005
Krippendorff, K. (2018). Content analysis: An introduction to its methodology (4th ed.). SAGE Publications.
Mentari, D. S., & Mutaqi, A. S. (2024). Faktor komunikasi dan kolaborasi dalam integrated project delivery. Jurnal Rekayasa Konstruksi Mekanika Sipil, 7(1), 34–45. https://ejournal.ust.ac.id/index.php/JRKMS/article/view/3165/2997
Mojidra, R., Sharma, A., & Patel, P. (2025). Communication pathways and project success : analyzing stakeholder coordination impacts on construction outcomes. Journal of Construction Engineering and Technology Management, 4(1), 23–35. https://journals.stmjournals.com/jocetm/article%3D2025/view%3D216133
Ohag, S., Williams, K., & Brown, J. (2023). Critical coordination factors affecting design and build projects. Journal of Construction Project Management, 18(2), 120–136. https://doi.org/10.26418/ijeas.2023.3.01.59-71
Peli, M., Utama, W. P., Jumas, D. Y., Zulherman, Z., Sesmiwati, S., Ariani, V., Roza, F., & Thaha, P. (2022). Faktor determinasi komunikasi efektif di proyek konstruksi dari perspektif multiple stakeholders. Jurnal Studi Komunikasi dan Media, 26(2), 163–178. https://doi.org/10.17933/jskm.2022.4896
Snyder, H. (2019). Literature review as a research methodology: An overview and guidelines. Journal of Business Research, 104, 333–339. https://doi.org/10.1016/j.jbusres.2019.07.039
Soeharto, I. (1999). Manajemen proyek: Dari konseptual sampai operasional. Erlangga.
Sugiyono. (2019). Metode penelitian kuantitatif, kualitatif, dan R&D. Alfabeta.
Susilo, Agustapraja, H. R., & Arif, S. (2026). Analisis waktu dan biaya menggunakan metode time cost trade off rehabilitasi gedung kantor Inspektorat Daerah Kabupaten Tuban. Jurnal Talenta Sipil. http://dx.doi.org/10.33087/talentasipil.v9i1.1043
Turkulainen, V., Aaltonen, K., & Lohikoski, P. (2015). Managing project stakeholder communication: The Qstock festival case. Project Management Journal, 46(6), 74–91. https://doi.org/10.1002/pmj.21547
Utama, W. P., Sikumbang, N., Warman, H., Zulherman, Z., Fuadi, A. B., & Agus, E. (2024). Kajian eksploratori hubungan praktik komunikasi dan hasil proyek konstruksi di Sumatera Barat. Jurnal Teknik Sipil, 31(2), 219–226. https://doi.org/10.5614/jts.2024.31.2.12
Yang, Y., Wei, Z., & Zhang, Z. (2023). Stakeholder relationship in construction projects: A mixed methods review. Buildings, 13(12), 3122. https://doi.org/10.3390/buildings13123122
Yudha, F. P., & Mutaqi, A. S. (2024). Literature review: Pemanfaatan building information modeling (BIM) dalam konstruksi sebagai alat komunikasi dan kolaborasi dalam integrated project delivery. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, 3(4), 214–226. https://doi.org/10.61132/konstruksi.v3i4.1018
Zebua, F. D., Harita, H., & Giawa, J. F. K. (2025). Peran Komunikasi Dan Koordinasi Tim Dalam Keberhasilan Manajemen Proyek Konstruksi. Jurnal Riset Dan Inovasi Teknik Sipil, 1(1), 15–21. https://ojs.unias.ac.id/index.php/jurasi/article/view/530
DOI: http://dx.doi.org/10.33087/talentasipil.v9i2.1409
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |


