Analisa Penjadwalan Proyek dengan Menggunakan Metode Line Of Balance (LOB) pada Proyek Pedestrian Jl. MH. Thamrin-Jl. Halim Perdana Kusuma

Ahmad Efendi, Annisa Dwiretnani, Ari Setiawan

Abstract


Choosing the appropriate method in project scheduling is an important thing to meet the needs in construction. Construction projects that have repetitive or repetitive work require a continuous and well-scheduled supply of labor, because the repetitive project work must be able to continue to progress without being delayed. Of the several project scheduling methods, line of balance (LoB) is more suitable for repetitive projects because line of balance (LoB) is a construction project scheduling method in the form of a line that represents one type of recurring activity package. LoB can be applied to repetitive projects. Repetitive projects are construction projects whose work is done repeatedly. The study objectives to be achieved are as follows: To find out the form of the Line of Balance (LoB) method network in the “Pedestrian JL. H. Thamrin - JL. Halim Perdana Kusuma". Knowing what is the optimal time to complete the project “Pedestrian JL. MH. Thamrin - JL. Halim Perdana Kusuma” using the Line of Balance (LoB) method. From the results of the analysis using the LOB method, the optimal project completion duration is 218 days, while the existing project time schedule is 240 days. So the calculation using the LOB method is 22 days faster than the existing time schedule.


Keywords


Project Scheduling Method, repetitive project, LoB . Method

Full Text:

PDF

References


Akhirson Karaini, Armaini. (1987). Pengantar Manajemen Proyek. Jakarta: Gunadarma.

Arianto, Arif. (2010). Eksplorasi Metode Bar Chart, CPM, PDM, PERT, Line of Balance dan Time Chainage Diagram dalam Penjadwalan Proyek Konstruksi. Tesis, Semarang: Universitas Diponegoro.

Aulia, Muhammad Abrar. (2017). Analisis Pengguanaan Metode Penjadwalan Line Of Balance Pada Proyek Konstruksi Repetititf. Semarang : Universitas Diponegoro.

Badri, Sofwan. (1991). Dasar-Dasar Network Planning, Dasar-Dasar Pelaksanaan Jaringan Kerja. Yogyakarta: Penerbit PT Rineka Cipta.

Halimi, Jamalan. (2018). Analisis Penjadwalan Ulang Dengan Menggunakan Metode LSM (Linier Scheduling Method/ Line Of Balance) (Rescheduling Analysis With LSM/ LOB Methode). Universitas Islam Indonesia.

Hegazy. (2001). Management of The Rim. UK : University Of Brighton.

Husen, Abrar. (2010). Manajemen Proyek. Serpong: Andi Offset.

Kenley. (2009). Location Based Management for Construction. Amazon.

Soeharto, Iman. (1999). Manajemen Proyek. Jakarta: Penerbit Erlangga.

Widiasanti, Irika dan Lenggogeni. (2013). Manajemen Konstruksi. Jakarta: Remaja Rosdakarya.




DOI: http://dx.doi.org/10.33087/talentasipil.v5i2.137

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.