Perancangan Geometri Jalan Rel Kereta Api Cepat Surabaya – Jakarta Berdasarkan Jalur Eksisting Stasiun Pasar Turi – Stasiun Lamongan (KM. 0+000 – KM. 41+046)

Cahya Rafiyoga Harnan, Nugroho Utomo, Aulia Dewi Fatikasari

Abstract


Trains have become a reliable mode of land transportation as they can avoid traffic congestion, operate on structured schedules, and offer high passenger and freight capacity. Technological advancements have led to the development of high-speed trains capable of traveling over 300 km/h on dedicated, unobstructed tracks, enhancing travel efficiency and regional connectivity. In Indonesia, the Jakarta–Surabaya high-speed rail project is expected to facilitate mobility, reduce congestion on the Pantura corridor, and complement conventional lines such as the Pasar Turi–Lamongan route. This study aims to analyze the horizontal and vertical alignment design, rail elevation dimensions, and the location of gradient transitions on the high-speed rail line between Pasar Turi and Lamongan stations. The geometric planning of the high-speed rail uses references from Minister of Transportation Regulation No. 7 of 2022 and the book Jalan Rel by Suryo Hapsoro Tri Utomo, with secondary topographic data from Google Earth Pro processed using Global Mapper and Civil 3D. The results indicate that the horizontal alignment is designed with speeds below 350 km/h—specifically 300 km/h, 250 km/h, and 120 km/h—to avoid overlap in closely spaced curves, while the vertical alignment is planned for a design speed of 350 km/h with concave and convex vertical radii of 25,000 meters and a gradient of less than 2%. The study concludes with a rail elevation of 175 mm, curve radii of 8,000 meters for 350 km/h, eight SCS-type curves with some lower-speed segments to prevent spiral overlap, and a vertical alignment on an elevated track with eight curve points, a radius of 25,000 meters, and a maximum gradient of 2%.

Keywords


High-Speed Rail, Horizontal Alignment, Vertical Alignment, Rail Elevation, Pasar Turi Station–Lamongan Station

Full Text:

PDF

References


Dasion, J. J. T., & Utomo, N. (2020). Perencanaan Jalur Ganda (Double Track) Lintasan Kereta Api pada Emplasemen Stasiun Wonokromo - Stasiun Sidoarjo (KM 7+881 - KM 25+510). Jurnal Ilmiah Teknik Sipil , 6(2), 109–118.

Fajriati, R., Utomo, S. H. T., & Muthohar, I. (2020). Analisis Standar Perancangan Geometri Rel Kereta Cepat (Studi Kasus : Kereta Cepat Jakarta - Bandung). Jurnal Manajemen Aset Infrastruktur & Fasilitas, 4(3), 249–260. https://doi.org/10.12962/j26151847.v4i3.7104

Lutfi, F. M. A. (2019). Perancangan Struktur Jalan Rel Lintas Madiun - Kedungbanteng Menggunakan Metode Slab Track. Institut TeknologiSepuluh Nopember.

Mahendra, T. S. S. I., & Fitri, M. (2025). Static Structure Analysis of EMU CR400AF High Speed Train’s Hollow Axle Using Ansys Workbench. JTTM : Jurnal Terapan Teknik Mesin, 6(1), 20–30. https://doi.org/10.37373/jttm.v6i1.1206

Malaiholo, D., Kurniawan, M. A., & Anggraini, N. (2022). Analisa Pengendalian Biaya Dan Waktu Pada Pelaksanaan Proyek (Studi Kasus: Jalur Ganda Kereta Api Mojokerto-Jombang). Jurnal Talenta Sipil Unbari, 5(1), 49. https://doi.org/10.33087/talentasipil.v5i1.97

Marantika, D., Erwinsyah, Moch. B., Hatmoko, J. U. D., & Khasani, R. R. (2017). Analisis Risiko Investasi Proyek Kereta Cepat Jakarta - Bandung. Jurnal Karya Teknik Sipil, 6(1), 324–334. http://ejournal-s1.undip.ac.id/index.php/jktsTelp.:

Pamursari, N., Sari, N., & Bahidin, M. (2023). Review Design Bantalan Pada Jalur Proyek Kereta Cepat Jakarta-Bandung. Jurnal Teknik Sipil Sendi, 4(1), 43–53. http://jim.teknokrat.ac.id/index.php/tekniksipilJurnalTeknikSipil

Peraturan Dinas No. 10, Pub. L. No. 10, Republik Indonesia (1986).

Peraturan Menteri Perhubungan No. 7, Pub. L. No. 7, Republik Indonesia (2022).

Putra, D. D. (2019). Perancangan Geometrik Dan Struktur Jalan Rel Untuk Rencana Kereta Cepat Surabaya - Yogyakarta Seksi Stasiun Madiun - Stasiun Solo Balapan. Institut Teknologi Sepuluh Nopember.

Rinanto, H. A., & Rahardjo, B. (2022). Perencanaan Geometrik Jalan Rel Kereta Cepat Surabaya - Banyuwangi. Jurnal Teknik ITS, 11(2), 79–83.

Salim, I. P., Simanjuntak, M. A. R., & Sulistio, H. (2023). Analisis Kebijakan Pemerintah Dalam Pengembangan Kereta Cepat Di Indonesia Dan Dampaknya Terhadap Manajemen Proyek. Wahana Teknik Sipil, 28(1), 115–130.

Septiana, D. A. (2023). Perencanaan Jalur Ganda (Double Track) Lintasan Kereta Api Pada Stasiun Krian – Stasiun Wonokromo (KM 38+330 - KM 17+361. Universitas Pembangunan Nasional “Veteran” Jawa Timur.

Tetama, A. R., Suharno, & Tyola, Y. N. (2022). Pembangunan Kereta Cepat Jakarta-Bandung: Memaknaikonsultasi Publik Dan Partisipasi Masyarakat Dalam Pengadaan Tanah. Jurnal Widya Bhumi, 2(2), 136–151.

Tysara, L. (2024, January 24). Kawasan Aglomerasi Adalah Pemusatan Lokasi, Ini Contoh Implementasinya di Indonesia. Liputan6.

Utomo, N., & Fatikasari, A. D. (2023). Analisis Perencanaan Ulang Alinyemen Horizontal dan Pelebaran Perkerasan Tikungan di Ruas Jalan Nasional Gumitir (STA 231+000 - STA 235+100). Semesta Teknika, 26(1), 65–77. https://doi.org/10.18196/st.v26i1.18033

Utomo, S. H. T. (2009). Jalan Rel (2nd ed.). Beta Offset Yogyakarta.




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1173

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.