Penyebab Keterlambatan Jasa Konstruksi Terintegrasi Rancang Bangun Revitalisasi Rusun Penjaringan (Tower A, B, E dan F) Jakarta Utara

Barnet Sitepu, Moh. Azhar, Pio Ranap Tua Naibaho

Abstract


Construction project delays are one of the main problems in the construction service industry in Indonesia, which have an impact on increased costs, decreased work quality, and disruption to project completion schedules. The Penjaringan Flats Revitalization Project (Towers A, B, E, and F) in North Jakarta is one example of a project that experienced time constraints due to the complexity of implementation and external factors such as the Covid-19 pandemic. This study aims to identify the factors that influence delays in the Penjaringan Flats Revitalization Design-Build Integrated Construction Services project. The research method used is a qualitative approach with descriptive analysis based on field data, supervision reports, meeting minutes, and project documentation during the 2019–2021 period. The results of the study show that there are nine main variables causing delays, namely situational factors, managerial factors, contract and document scope, planning and scheduling, materials, labor, site characteristics, control, and the Covid-19 pandemic. Of these nine variables, the five dominant factors that significantly influenced delays were cost factors, unexpected events, the experience of supervisors or field managers, and communication between contractors and consultants and between owners and contractors. The conclusion of this study confirms that cost efficiency, external risk management, and good communication and workforce competence are key factors in preventing construction project delays in the future.

Keywords


Project Delay, Construction Services, Design and Build, Flat Revitalization, Dominant Factors.

Full Text:

PDF

References


Boy, W., Erlindo, R., Ridho, D., & Fitrah, A. (2021). Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Gedung Kuliah Pada Masa Pandemi Covid 19. In Universitas Dharma Andalas (Vol. 01, Issue 1).

Darsa, R., Nulyani, R., & Zaitul, Z. (2023). Kajian Faktor Kinerja Sumber Daya Manusia Kontraktor Terhadap Kualitas Mutu Pekerjaan Proyek Kontruksi Jalan Di Kota Sungai Penuh. Jurnal Ilmiah Universitas Batanghari Jambi, 23(3), 2831. Https://Doi.Org/10.33087/Jiubj.V23i3.4399

Dewanto, D., & Kharin, H. C. (2021). Faktor-Faktor Yang Mempengaruhi Kinerja Karyawan Proyek Konstruksi: Systematic Review. Info Artikel : Diterima 4 Desember. Https://Doi.Org/10.14710/Mkmi.21.2.142-147

Fadlilah, M. H., & Romadhon, F. A. (2024). Penyebab Keterlambatan Pekerjaan Kontruksi Proyek Pembangunan Hotel Padma Semarang.

Fassa, F., Wibowo, A., & Soekiman, A. (2021). Sumber Daya Manusia Di Industri Konstruksi Periode 2011–2020: Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Konstruksi: Sebuah Tinjauan Sistematis.

Hasanah, U., Yamali, F. R., & Dwiretnani, A. (2025). Analisis Faktor-Faktor Yang Mempengaruhi Tingkat Akurasi Perkiraan Biaya Awal Pada Tahap Konstruksi (Persepsi Kontraktor Di Kota Jambi). Jurnal Talenta Sipil, 8(2), 855. Https://Doi.Org/10.33087/Talentasipil.V8i2.815

Ian, R. M., & Jamal. (2025). Analisis Faktor Penyebab Keterlambatan Proyek Konstruksi Di Indonesia. In Jurnal Kajian Teknik Sipil (Vol. 10, Issue 1).

Malaiholo, D., Kurniawan, M. A., & Anggraini, N. (2022). Analisa Pengendalian Biaya Dan Waktu Pada Pelaksanaan Proyek (Studi Kasus: Jalur Ganda Kereta Api Mojokerto-Jombang). Jurnal Talenta Sipil, 5(1), 49. https://doi.org/10.33087/talentasipil.v5i1.97

Marpaung, D. P., Dwiretnani, A., & Ropiah, R. (2020). Evaluasi Rencana Manajemen Mutu Pada Proyek Pembangunan Jembatan Rantau Kapas Tuo Tahun Anggaran 2017. Jurnal Talenta Sipil, 3(1), 37. Https://Doi.Org/10.33087/Talentasipil.V3i1.26

Oktra, D., Yulius, N., & Anif, B. (2019). Kajian Manajemen Sumber Daya Yang Mempengaruhi Keterlambatan Proyek (Studi Kasus: Proyek Konstruksi Gedung Di Kota Bukittinggi). 2(1). Http://Jurnal.Ensiklopediaku.Org

Ophiyandri, T., Hadiguna, R. A., & Honesti, D. (2023). Penyebab Keterlambatan Konstruksi Proyek Jalan Kota Di Provinsi Sumatera Barat. Jurnal Bangunan, Konstruksi & Desain, 1(2), 109–114. Https://Doi.Org/10.25077/Jbkd.1.2.109-114.2023

Rizal, A. H., Biaya, P., Keterlambatan, P., Proyek, P., Bendungan, K., Rizal, A. H., Fay, S., & Krisnayanti, D. S. (2024). Pengaruh Biaya Terhadap Penyebab Keterlambatan Penyelesaian Proyek Konstruksi Bendungan. In Jurnal Teknik Sipil (Vol. 13, Issue 1).

Sadad, I., & Sangidana, G. A. (2024). Analisis Pengaruh Manajemen Konstruksi Dalam Penanganan Keterlambatan Pada Proyek Konstruksi. In Jurnal Teknika Sains (Vol. 09).

Sari, A. N., & Suryan, V. (2021). Pandemi Covid-19: Dampak Terhadap Pekerjaan Konstruksi. Jurnal Talenta Sipil, 4(2), 214. Https://Doi.Org/10.33087/Talentasipil.V4i2.77

Simanjuntak, I. J., Siagian, R. T., Prasetyo, R., Rozak, N. F., & Purba, H. H. (2022). Manajemen Risiko Pada Proyek Konstruksi Jembatan: Kajian Literatur Sistematis. Jurnal Teknologi Dan Manajemen, 20(1), 59–76. Https://Doi.Org/10.52330/Jtm.V20i1.47

Wahyuning Tyas, A., & Paing Heru Waskito, J. (2021). Analisa Faktor-Faktor Penyebab Keterlambatan Proyek Pembangunan Jembatan Joyoboyo. 9(2), 71–078.

Widiasanti, I., Johanes Saputra, R., Hary Handrawan, E., Fallah, A., Mauldi, I., & Prakoso Joyonegoro, R. (2024). Analisis Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Konstruksi. Jambura, 6(5). Http://Ejurnal.Ung.Ac.Id/Index.Php/Jimb




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1115

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.