Penjadwalan Ulang Proyek Pembangunan Perumahan Unit Nabawi Grand Zam Zam dengan Metode Linear Scheduling Method (LSM)

Musa Ghiffary, Rasio Hepyanto, Yosef Cahyo Setitanto P

Abstract


Scheduling is one of the crucial aspects in the execution of construction projects, as it directly affects the project's resource requirements. Therefore, an appropriate method is needed to obtain an effective and efficient schedule. This study conducts a rescheduling using the Linear Scheduling Method (LSM) on the Nabawi Grand Zam Zam Housing Project, aiming to provide an alternative schedule for comparison with the initial schedule prepared by the contractor. The data used in this research includes the initial project schedule in the form of an S-curve, along with other supporting data such as the budget plan and the housing site plan. The final result of the LSM calculation, considering the delays, shows that the 68-unit housing project can be completed within 148 working days. This indicates that the schedule produced using the LSM method is more optimal than the existing project schedule, which requires 156 working days (a difference of 8 days). Therefore, based on the conducted research, scheduling using the Linear Scheduling Method can improve time efficiency in project execution.

Keywords


Project, Scheduling, Linear Scheduling Method.

Full Text:

PDF

References


Bhaskara, A., Maulana, F. M., & Masagala, A. M. (2021). Analisis Penjadwalan Waktu Dan Biaya Proyek Dengan Menggunakan Linear Scheduling Method. Jurnal Teknik Sipil UBL, 12.

Dipohusodo, I. (1996). Manajemen Proyek & Konstruksi. Kanisius.

Efendi, A., Dwiretnani, A., & Setiawan, A. (2022). Analisa Penjadwalan Proyek dengan Menggunakan Metode Line Of Balance (LOB) pada Proyek Pedestrian Jl. MH. Thamrin-Jl. Halim Perdana Kusuma. Jurnal Talenta Sipil, 5(2), 346. https://doi.org/10.33087/talentasipil.v5i2.137

Lessy, G. T., Jamlaay, O., & Saleh, L. M. (2024). Analisis Penerapan Metode Line Of Balance Pada Pembangunan Ruang Kelas Baru Madrasah Ibtidaiyah Negeri 5 Maluku Tengah. JOURNAL AGREGATE, 3(1).

Melly, S., Haryono, I., Mulyati, E., Setyawati, D., Ibrahim, A., Hidayanto, Saptadi, N. T. S., Rela, Z. I., & Tiawan. (2014). Manajemen Proyek. CV HEI PUBLISHING INDONESIA. www.HeiPublishing.id

Paharudin, Nadir, M., & Anshari, A. I. (2024). Manajemen Proyek. PT MAFY MEDIA LITERASI INDONESIA.

Soini, M., Leskela, I., & Seppanen, O. (2004). Implementation of Line-of-Balance Based Scheduling and Project Control System in a Large Construction Company. Dalam S. Bertelsen & C. T. Formoso (Ed.), 12th Annual Conference of the International Group for Lean Construction. http://iglc.net/Papers/Details/313/pdf

Subachtiar, B., Yulianto, T., Nugroho, M. W., Sundari, T., & Ramadhani, R. (2024). Penerapan Linear Scheduling Method (Lsm) Pada Peningkatan Jalan Raya Cangkingrandu. 04(01), 1–9.

Susanti, R., & Lukman. (2019). Studi Eksplorasi Metode Penjadwalan Pada Proyek Konstruksi Jalan Tol Semarang-Solo Ruas Ungaran-Bawen. Jurnal Proyek Teknik Sipil, 2(1), 1–13. https://ejournal2.undip.ac.id/index.php/potensi

Tamalika, T., Maryadi, D., Mz, H., Fuad, I. S., & Alamsyah, M. N. (2022). Analisis Penjadwalan Ulang Proyek Power House pada Rumah Sakit dengan Metoda PERT, CPM dan Fishbone Diagram (Studi Kasus Pada Kontraktor Di Kota Palembang). Prosiding Seminar Nasional Mercu Buana Conference on Industrial Engineering, 4, 164–172.

Urrahmi, M., Zukhrina Oktaviani, C., & Mubarak, dan. (2023). Darussalam Banda Aceh Kode Pos 23111 2 cut.zukhrina@unsyiah.ac.id Masuk. Jurnal Mitra Teknik Sipil, 6(1), 31–38.

Utami, A., & Nugraheni, F. (2023). Analisis penjadwalan waktu pelaksanaan proyek dengan Linear Scheduling Method (LSM) pada proyek pembangunan perumahan. Proceeding Civil Engineering Research Forum, 3(1).

Verolio, & Pamadi, M. (2023). Analisa Penjadwalan Metode Linier Scheduling Method atau Line of Balance (LSM/LOB) Perumahan Devely Residence Kota batam. Civil Engineering and Architecture Journal, 1(1). https://doi.org/10.37253/leader.v1i1.7661

Widiasanti, I., & Lenggogeni. (2013). Manajemen Konstruksi. PT Remaja Rosdakarya Offset.

Yanto, D. (2019). Analisis Durasi Penjadwalan Ulang Proyek Pembangunan Perumahan Dengan Menggunakan Metode LSM (LINEAR SCHEDULING METHOD) (Studi Kasus : Griya Asri Permai Kabupaten Indragiri Hulu). Universitas Islam Riau.




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1004

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.