Penggunaan Metode Time Cost Trade Off Berbasis Algoritma Genetika
Abstract
Keywords
Full Text:
PDFReferences
Ali, A., & Naeem, S. (2022). The Controller Parameter Optimization For Nonlinear Systems Using Particle Swarm Optimization And Genetic Algorithm. Journal of Applied and Emerging Sciences, 12(1).
Ammar, M. A. (2020). Efficient Modeling Of Time-Cost Trade-Off Problem By Eliminating Redundant Paths. International Journal of Construction Management, 20(7), 812-821.
Aristyono, D., Hakim, A., & Della Oganda, D. (2024). Optimasi Penjadwalan Proyek Dengan Kombinasi Critical Path Method dan Algoritma Genetika (Studi Kasus: Pt. Hervindo Inti Nusantara). Industrial Engineering Student Scientific Journal, 2(2), 94-102.
Assyura, D. M., & Khoiri, M. (2023). Estimasi Biaya dan Waktu Pekerjaan Underpass pada Jalan Tol Serpong-Balaraja Menggunakan Metode Erection dengan Transfer Beam. Jurnal Teknik ITS, 12(1), D64-D69.
Bourne, L. M., & Weaver, P. (2018). The Origins of Schedule Management: The Concepts Used in Planning, Allocating, Visualizing And Managing Time In A Project. Frontiers of Engineering Management, 5(2), 150-166.
Dirgiantara, D. R., & Sutantiningrum, K. H. (2024, December). Optimalisasi Penjadwalan Proyek Lapangan Olahraga: Faktor Keterlambatan dan Pengembangan Strategi. In Prosiding Seminar Nasional Teknik Sipil (Vol. 6, No. 1, pp. 217-227).
Fauzananda, F. A. (2025). Optimasi Biaya dan Waktu dengan Meode Time Cost Trade Offpada Proyek Rumah Sakit Kanker Dharmais (Doctoral dissertation, Universitas Islam Indonesia).
JUNIAWAN, I. (2024). Analisis Percepatan Waktu Pelaksanaan Proyek Dengan Metode Tcto (Time Cost Trade Off (Studi Kasus: Pembangunan Gedung 2A RSU Bangli) (Doctoral dissertation, Universitas Mahasaraswati Denpasar).
Krisnandi, K., & Agung, H. (2017). Implementasi Algoritma Genetika Untuk Memprediksi Waktu dan Biaya Pengerjaan Proyek Konstruksi. Jurnal Ilmiah FIFO, 9(2), 90-97.
Kurniawan, W. (2015). Analisa Metode Time Cost Trade Off Pada Pelaksanaan Proyek Pembangunan Gedung The Samator Surabaya.
Messah, Y. A., Berelaku, D. C. S., Ramang, R., Project, M., Kritis, L., Slope, C., Trade-, T. C., & Cost, C. (2023). Perbandingan Penambahan Waktu Kerja Dan Penambahan Tenaga Kerja Terhadap Biaya Pelaksanaan Proyek. 12(2).
Muzdalifah, L., Kurniawati, E. F., Ulul, E. D., & Pamitra, K. G. (2019). Penjadwalan Proyek Perumahan Dengan Optimasi Waktu dan Biaya Harian. Jurnal Riset dan Aplikasi Matematika (JRAM), 3(2), 78-88.
Nurazizah, N., Firdasari, F., & Purwandito, M. (2023). Penerapan Metode Time-Cost Trade-Off dalam Optimalisasi Biaya dan Jadwal Proyek Laboratorium Dasar Universitas Samudra. Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi, 6(1), 94-103.
Priyo, M., & Aulia, M. R. (2016). Aplikasi Metode Time Cost Trade Off Pada Proyek Konstruksi: Studi Kasus Proyek Pembangunan Gedung Indonesia. Semesta Teknika, 18(1), 30–43. https://doi.org/10.18196/st.v18i1.703
Salman, O., Melissourgos, T., & Kampouridis, M. (2023, July). Optimization of trading strategies using a genetic algorithm under the directional changes paradigm with multiple thresholds. In 2023 IEEE Congress on Evolutionary Computation (CEC) (pp. 1-8). IEEE.
Salman, R. A. (2023). Analisis Pengaruh Probabilitas Crossover Terhadap Kinerja Algoritma Genetika Dalam Optimasi Penjadwalan Matakuliah. Jurnal Teknoif: Teknik Informatika Institut Teknologi Padang, 11(2), 69–74.
Saputro, W. A. (2025). Analisis Biaya dan Durasi Pekerjaan dengan Metode Crashing (Studi Kasus Proyek Rehabilitasi SDN 2 Sedadi Grobogan) (Doctoral dissertation, Universitas Islam Sultan Agung Semarang).
Septianus, A., Laorent, D., & Nugraha, P. (2014). Penggunaan Linear Programming Dan Genetic Algorithms Dalam Menyelesaikan Time-cost Trade-off Problem. Jurnal Dimensi Pratama Teknik Sipil, 3(1).
Simamora, R. (2024). Penaksiran Parameter Regresi Nonlinear Menggunakan Particle Swarm Optimization dan Genetic Algorithm. Leibniz: Jurnal Matematika, 4(2), 71-83.
Sofia, D. A., & Putri, A. A. E. (2021, September). Analisis Perbandingan Penambahan Jam Kerja dan Tenaga Kerja terhadap Waktu dan Biaya Proyek dengan Metode Time Cost Trade Off. In Prosiding Industrial Research Workshop and National Seminar (Vol. 12, pp. 846-854).
Sumadireja, I., Prianto, C., & Saputra, M. H. K. (2020). Optimasi nilai pendapatan menggunakan algoritma genetika (Vol. 1). Kreatif.
Syahada, K. N., Rindo, G., Santosa, A. W. B., & Prasetyo, N. A. (2024). Analisis Reschedule Keterlambatan Proyek Reparasi Dua Kapal dengan Metode Critical Path Method (CPM) dan Time Cost Trade Off (TCTO) pada KM. Kendhaga Nusantara 4 dan TB. Sorowako Star. Jurnal Integrasi, 16(2), 156-164.
Utari, R. P., Hadad, M. N., & Wahyudiono, S. (2022). Analisis Percepatan Proyek dengan Metode Time Cost Trade Off (Studi Kasus Pada Gedung Student Center UIN Datokrama Palu). Media Teknik Sipil, 20(1), 7-13.
Wang, T., Abdallah, M., Clevenger, C., & Monghasemi, S. (2021). Time–Cost–Quality Trade-Off Analysis for Planning Construction Projects. Engineering, Construction and Architectural Management, 28(1), 82-100.
Yuwono, A. J., & Setiawan, B. (2023). Analisis Faktor Keterlambatan Proyek Konstruksi Manara 17 PWNU Jatim. In Prosiding Seminar Nasional Teknik Sipil UMS (pp. 604-609).
Zahir, L. A. (2021). Strategi Optimasi Waktu Dan Biaya Menggunakan Time Cost Trade Off (Tcto) Pada Pembangunan Gedung Ruang Kelas Smpn 1 Besuki. JURNAL DAKTILITAS, 1(2), 36-51.
DOI: http://dx.doi.org/10.33087/talentasipil.v9i2.1288
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |