Schedule Actual Proyek dengan Metode Precedence Diagram Method (PDM) dan Program Evaluation and Review Technique (PERT ) pada Proyek Pembangunan Pasar

Muhammad Kholish Muwaffa, Gunaedy Utomo, Reno Pratiwi

Abstract


The construction and development of the Klandasan Block C Market Distribution Facility in Balikpapan City is a strategic construction project that plays an important role in supporting the economic activities of the local community. This project requires optimal planning and time management to ensure that all stages of the work can be completed according to the target. Problems that often arise in the implementation of construction projects are delays due to uncertainty in the duration of activities and a lack of synchronization between interdependent activities. Therefore, this study was conducted with the aim of identifying critical paths and calculating the probability of successful project completion using the Precedence Diagram Method (PDM) and Program Evaluation and Review Technique (PERT) approaches. The PDM method is used to describe the dependency relationships between activities, determine the critical path, and identify activities that have the potential to cause delays. Meanwhile, the PERT method is applied to estimate the project completion time by considering the variability of activity duration through three time estimates, namely optimistic, realistic, and pessimistic. The analysis results show that the project has several activities that are classified as critical and require intensive monitoring of resource allocation to prevent schedule deviations. Based on the calculations, projects with a planned duration of 150 days have a high probability of being completed on time. In conclusion, the combination of PDM and PERT methods provides effective results in the process of planning and controlling project schedules, helping project managers determine activity priorities, optimize time efficiency, and minimize the risk of construction delays.

Keywords


Project Management, PDM, PERT, Critical Path, Completion Probability.

Full Text:

PDF

References


Burhannudin. (2010). Karakteristik Teritorialitas Ruang Pada Permukiman Padat Di Perkotaan (Vol. 2).

Eisner, H., & Wiley, J. (2001). Essentials Of Project And Systems Engineering Management Second Edition.

Gibran, M., Arrizal, N., Fiveriati, A., Prasetya, I. S., Rulianto, J., Muzaka, K., & Id, A. (2024). Analisa Penjadwalan Docking Kapal Di Pt. Pelayaran Hub Maritim Indonesia Dengan Menggunakan Metode Predence Diagramming Method (Pdm) Dan Project Evaluation And Review Technique (Pert). R2j, 6(6). Https://Doi.Org/10.38035/Rrj.V6i6

Hepiyanto, R., Dhana, R. R., & Febrianto, A. D. (2025). Manajemen Biaya Dan Waktu Pelaksanaan Proyek Pembangunan Co-Working Space Kabupaten Lamongan. Jurnal Talenta Sipil, 8(2), 837. Https://Doi.Org/10.33087/Talentasipil.V8i2.951

Herroelen, W. (2005). Project Scheduling-Theory And Practice.

Lock, D. (2016). The Essentials Of Project Management, 4 Th Edition.

Meredith, J. R. ., & Mantel, S. J. . (2003). Project Management : A Managerial Approach. Wiley.

Nurhidayat, A., Arianto, B., & Tedja Bhirawa, D. W. (2020). Optimalisasi Pembangunan Proyek Apartemen Sgc Cibubur Dengan Menggunakan Metode Precedence Diagram Method (Pdm).

Pandya, M. W. Y., Nasution, D. S. D., Hendriyanti, I., & Pratiwi, R. (2024). Analisis Resource Leveling Menggunakan Precedence Diagram Method (Pdm) Pada Gedung Mako Lanal Balikpapan. Jurnal Talenta Sipil, 7(2), 445. Https://Doi.Org/10.33087/Talentasipil.V7i2.488

Putri, D. F., Widiastuti, E., Afrila, H., & Hidayat, G. (2025). Scheduling Analysis Of Plan, Realisation, And Estimation By Using Precedence Diagram Method (Pdm) (Case Study : Construction Development Project Multi-Purpose Sports Hall Phase Iv In Katingan Regency).

Sari, D. M., Agustappraja, H. R., Arif, S., & Hepiyanto, R. (2025). Biaya Dan Waktu Proyek Gedung Satnarkoba Dengan Metode Cpm Dan Metode Pert. Jurnal Talenta Sipil, 8(2), 900. Https://Doi.Org/10.33087/Talentasipil.V8i2.969

Siregar, A. C., Noorkhayati, N., Yatnikasari, S., Aprisandi, D., & Agustina, F. (2024). Optimization Of Time Scheduling Planning With The Precedence Diagram Method (Pdm) On The Drainage Construction Project. Teknika: Jurnal Sains Dan Teknologi, 20(1), 124. Https://Doi.Org/10.62870/Tjst.V20i1.24193

Tamalika, T., Syahrul Fuad, I., Azrin, A., & Mukminatun Ardaisy, Dan. (2025). Aplikasi Penjadwalan Proyek Dengan Pdm (Precedence Diagram Method) Pada Pekerjaan Konstruksi Di Cv. Wahyu Jaya Persada Konsultan Palembang. In Jurnal Pengabdian Masyarakat (Vol. 3, Issue 1). Http://Jurnal.Dokicti.Org/Index.Php/Bersama/Index

Walker, H. T. D. (2010). Managing Project In Business.

Wulan Dari, P., Anjarwati, S., & Kurniawan Suksmono, A. (2025). Analisis Penjadwalan Proyek Konstruksi Dengan Metode Precedence Diagram Method (Studi Kasus: Proyek Pembangunan Mitra 10 Purwokerto) Analysis Of Construction Project Scheduling Using The Precedence Diagram Method (A Case Study: Mitra 10 Purwokerto Building Construction Project). In Hal (Vol. 6, Issue 1). Http://Jurnalnasional.Ump.Ac.Id?Index.Php/Civeng




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1136

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.