Analisis Keterlambatan pada Proyek Peningkatan Gedung Kantor DPU Kota Balikpapan Menggunakan Lean Six Sigma Framework

Hesra Bunga, Gunaedy Utomo, Reno Pratiwi

Abstract


Construction project delays are a common problem that can have a significant impact on time efficiency, costs, and the quality of work. Therefore, a systematic and data-driven management approach is needed to identify the main causes of delays and determine the appropriate improvement strategies. This study aims to analyze the factors causing delays in the Balikpapan City Public Works Office (DPU) building improvement project using the Lean Six Sigma approach through the Define, Measure, Analyze, Improve, and Control (DMAIC) stages. The research data was obtained from project documents, field observations, interviews, and questionnaires administered to workers and project supervisors. The analysis was conducted using Pareto charts, comparisons of planned and actual workforce allocations, and fishbone diagrams to identify the root causes of delays. The results of the study show that the dominant factors causing project delays are human resources aspects, particularly the mismatch between the number of workers available and the work requirements in a given period, as well as the transfer of workers to other projects. Meanwhile, factors such as machinery, work methods, materials, and environmental conditions were not found to have a significant impact on project delays, as most were considered to be in fairly good condition and did not hinder the work process. Based on the results of this analysis, the recommended improvement strategies include improving worker attendance monitoring, adjusting worker allocation according to the needs of each stage of the project, and recruiting additional workers during periods of high workload

Keywords


Project Delays, Lean Six Sigma, DMAIC, Construction Management, Time Efficiency.

Full Text:

PDF

References


Anggraini, A., Dwiantoro, E., & Sazuatmo, S. (2025). Analisa Optimasi Biaya Dan Waktu Pelaksanaan Proyek Konstruksi Dengan Penambahan Jam Kerja Dan Penambahan Tenaga Kerja Berdasarkan Metode Time Cost Trade Off (Studi Kasus: Penanganan Jalan Muara Sahung – Naga Rantai Kabupaten Kaur Provinsi Bengkulu). Riggs: Journal Of Artificial Intelligence And Digital Business, 4(4), 4456–4462. Https://Doi.Org/10.31004/Riggs.V4i4.4276

Chrestofer William Daniel, Benediktus Dairo Bio, & I Wayan Gunarta. (2023). Dampak Arsitektur Terhadap Iklim Yang Mempengaruhi Keawetan Bahan Bangunan Di Daerah Asah Gobleg Di Kabupaten Buleleng. Jurnal Anala, 11(1), 19–28. Https://Doi.Org/10.46650/Anala.11.1.1399.19-28

Dwitama, M. F., Suraji, A., & Hg, S. H. (2025). Evaluasi Safety In Design (Sid) Dalam Perencanaan Konseptual Smkk Di Proyek Jembatan. Jurnal Talenta Sipil, 8(2), 763. Https://Doi.Org/10.33087/Talentasipil.V8i2.984

Fardila, D., & Adawyah, N. R. (2021). Optimasi Biaya Dan Waktu Proyek Konstruksi Dengan Lembur Dan Penambahan Tenaga Kerja. Inersia: Informasi Dan Ekspose Hasil Riset Teknik Sipil Dan Arsitektur, 17(1), 35–46. Https://Doi.Org/10.21831/Inersia.V17i1.39499

Hendriyani, I., Pratiwi, R., & Qadri, N. (2020). Optimasi Waktu Dan Biaya Pada Pelaksanaan Proyek Peningkatan Jalan Bina Bakti Kelurahan Gunung Seteleng Kabupaten Penajam Paser Utara Dengan Metode Time Cost Trade Off (Tcto). Jurnal Ilmiah Teknik Sipil Transukma, 3(1), 65–76. Https://Doi.Org/10.36277/Transukma.V3i1.72

Hetharie, V. I., & Taihuttu, F. (2025). Analisis Pengaruh Cuaca Dan Mobilisasi Terhadap Waktu Kerja Proyek Konstruksi Jembatan Studi Kasus Provinsi Maluku. Jurnal Kacapuri : Jurnal Keilmuan Teknik Sipil, 8(2), 215. Https://Doi.Org/10.31602/Jk.V8i2.18253

Maretha Sujana, C., & Aditya Hakim, R. (2021). Perbandingan Produktivitas Tenaga Kerja Pembesian Dan Bekisting Saat Jam Kerja Normal Dan Lembur Menggunakan Metode Productivity Rating. Jurnal Rekayasa Konstruksi Mekanika Sipil (Jrkms), 4, 145–158.

Murdiagatma, S. S. (2025). Pengaruh Perubahan Iklim Pada Konstruksi Bendungan: Review Artikel. Jurnal Teknik Sipil, 21(1), 128–143. Https://Doi.Org/10.28932/Jts.V21i1.8009

Rachman, T. A. (2020). Produktivitas Tenaga Kerja Pada Proyek Pembangunan Jembatan Di Banjarmasin. Jurnal Kacapuri : Jurnal Keilmuan Teknik Sipil, 3(2), 175. Https://Doi.Org/10.31602/Jk.V3i2.4239

Rahmatullah, R., Andri, A., Umurani, K., Fathimah, H. S., & Hafiz, M. (2025). Evaluasi Penerapan Keselamatan Dan Kesehatan Kerja Bekerja Di Ketinggian Pada Konstruksi Bangunan Gedung. Jurnal Talenta Sipil, 8(2), 638. Https://Doi.Org/10.33087/Talentasipil.V8i2.915

Ruji Santoso. (2025). Analisis Persepsi Cuaca Hujan Terhadap Proyek Konstruksi, Pada Proyek Apartemen Solterra. Jurnal Tera, 3(2), 33–45. Https://Doi.Org/10.59832/Jt.V3i2.326

Sardi, I., Carlo, N., & Adriadi, R. (2025). Transformasi Kinerja Kontraktor Melalui Inovasi Rantai Pasok Pada Proyek Pengendalian Banjir Dan Pembangunan Embung Di Kabupaten Dharmasraya. Jurnal Talenta Sipil, 8(1), 117. Https://Doi.Org/10.33087/Talentasipil.V8i1.678

Septi, F. T., & Sari, D. P. (2026). Analisis Time Cost Trade Off Sebagai Strategi Percepatan Proyek Untuk Efisiensi Pembangunan Gedung Laboratorium Teknik 4 Institut Teknologi Sumatera. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 10(1), 1–08. Https://Doi.Org/10.32832/Komposit.V10i1.22126

Ximenes, F. F. (2025). Analisis Waktu Dan Biaya Dalam Pengendalian Proyek Konstruksi Menggunakan Metode Earned Value: Studi Kasus Proyek Gedung Untl. Axial : Jurnal Rekayasa Dan Manajemen Konstruksi, 13(1), 011. Https://Doi.Org/10.30742/Axial.V13i1.4333

Yoedianto, M., Hidayat, S., & Ratna Winanda, L. A. (2024). Analisis Biaya Dan Waktu Pada Proyek Pembangunan Dermaga Di Tuban Dengan Metode Earned Value Analysis. Action Research Literate, 8(9), 2686–2693. Https://Doi.Org/10.46799/Arl.V8i9.619




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1134

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.