Analisis Pekerjaan Struktur dengan Building Information Modeling (BIM) 5D pada Pembangunan Rusun Satuan Brimob Polda Kaltim

Fathurrahman Noorwahyudi, Irna Hendriyani, Martheana Kencanawati

Abstract


The advancement of science and technology, particularly in the field of construction technology, has had a significant impact on development. Despite the introduction of Building Information Modeling (BIM), volume and cost calculations using conventional methods are still often performed manually by consultants, which typically result in higher estimates. This study aims to implement the concept of BIM 5D using Autodesk Revit software to analyze the volume and cost of structural works in the Rusun Satuan Brimob Polda Kalimantan Timur Km.13 project, located in Balikpapan City. The research methodology involves a literature review, as well as the collection of both primary and secondary data. The subsequent stage includes structural modeling with Autodesk Revit, followed by volume and cost analysis, which are then compared with consultant calculations. Accordingly, this study applies BIM 5D to evaluate volumes and costs while benchmarking the results against conventional methods, specifically for structural works. Based on the analysis, the total structural cost estimated using BIM 5D amounts to IDR 1,158,061,415.04, whereas the consultant’s estimation reaches IDR 1,245,151,648.63, resulting in a cost difference of IDR 87,090,233.59 or 6.99%. Compared to the consultant’s method, the application of BIM 5D with Autodesk Revit produces lower and more efficient cost estimates, thereby offering a relevant and effective solution for construction cost planning.

Keywords


BIM 5D, Cost, Volume

Full Text:

PDF

References


Darma, I. Made Darma Susila, Yohanes Priyo Atmojo, Erma Sulistyo Rini, and Ida Bagus Suradarma. 2021. “Implementasi Teknologi Mobile Untuk Pelaporan Kemajuan Kerja Proyek Jasa Konstruksi.” Jurnal Sistem Dan Informatika (JSI) 15(2):122–33. doi:10.30864/jsi.v15i2.349.

Diantoro, Bayu Rahmad, Irna Hendriyani, and Reno Pratiwi. 2024. Implementasi Bulding Information Modelling (BIM) 5D Pada Pekerjaan Struktur Beton Bertulang (Studi Kasus Proyek Pembangunan Gedung Kelas SMP Terpadu Balikpapan Regency). Vol. 1.

Eka Pratama, Rizky, Irna Hendriyani, and Reno Pratiwi. 2024. “Implementasi Konsep Building Information Modelling (BIM) 5D Pada Pekerjaan Struktur Untuk Efisiensi Biaya Proyek.” 12(2).

Ervianti, Oktavina, Ratna Kartika Sari, and Divya Rachmadana. 2024. “Analisis Manajemen Persediaan Obat Di Rumah Sakit Muhammadiyah Gresik Dengan Metode ABC Dan EOQ.” 13(1).

Fardila, Dinda, and Nuur Robbyatul Adawyah. 2021. “Optimasi Biaya Dan Waktu Proyek Konstruksi Dengan Lembur Dan Penambahan Tenaga Kerja.” INERSIA: LNformasi Dan Ekspose Hasil Riset Teknik SIpil Dan Arsitektur 17(1):35–46. doi:10.21831/inersia.v17i1.39499.

Hariyanto, and Muchlas Adi Dwi Kurniawan. 2024. “Pemodelan Struktur Dengan Metode BIM Menggunakan Software Autodesk Revit.” Jurnal Ilmiah Teknosains 10(2).

Hastutiningsih, Arum Dwi, Pramudiyanto Pramudiyanto, Elviana, and Nuryadin Eko Raharjo. 2024. “Pelatihan Building Information Modeling Bagi Guru Sekolah Menengah Kejuruan Di DIY Dan Jawa Tengah.” Penamas: Journal of Community Service 4(2):389–99. doi:10.53088/penamas.v4i2.1288.

Jaya, Liem Ruwady Pratama, Irna Hendriyani, and Reno Pratiwi. 2025. “Implementasi Building Information Modeling (BIM) 5D Pada Proyek Konstruksi (Studi Kasus Pada Proyek Pembangunan Resto Manggar).” Jurnal Komposit 9(1):127–37. doi:10.32832/komposit.v9i1.17282.

Kusumastuti, Adhi, and Ahmad Mustamil Khoirin. 2019. Metode Penelitian Kualitatif. Semarang: Lembaga Pendidikan Sukarno Pressindo (LPSP).

Nashrullah, Mochamad, Okvi Maharani, Abdul Rohman, Eni Fariyatul Fahyuni, Nurdyansyah, and Rahmania Sri Untari. 2023. Metodologi Penelitian Pendidikan (Prosedur Penelitian, Subyek Penelitian, Dan Pengembangan Teknik Pengumpulan Data). edited by M. T. Multazam. Sidoarjo: UMSIDA Press.

Putra, Zam Zam Dade, Fachry Danuarta, Reno Pratiwi, and Irna Hendriyani. 2024. “Analisis Pekerjaan Beton Bertulang Dengan Building Information Modelling (BIM) 5D Pada Proyek Pembangunan Kantor Dan Pos Jaga Depot Supply Point Pertamina Lubricants Tarakan.” Jurnal Komposit 8(2):271–78. doi:10.32832/komposit.v8i2.15893.

Rachman, Tiara Annisa, Irna Hendriyani, and Reno Pratiwi. 2024. “Analisis Volume Dan Biaya Pada Proyek Pembangunan Rumah Tinggal Berbasis BIM 5D (Studi Kasus Proyek Pembangunan Rumah Tinggal 3 Lantai Tipe 130 Di Kota Balikpapan).” Jurnal Talenta Sipil 7(2):860. doi:10.33087/talentasipil.v7i2.629.

Ramadhanti, Azka Salsabila, and Eli Safrida. 2023. Analisis Implementasi Pengendalian Internal Berbasis COSO Pada Yayasan Orangutan Sumatera Lestari. Vol. 6.

Salsabila, Julieta, and Vendie Abma. 2023. “Perbandingan Realisasi Biaya Pelaksanaan Tehadap Rab Berbasis Bim.”

Setiawan, Ikbal, Irna Hendriyani, Reno Pratiwi, Dan Perencanaan, and Universitas Balikpapan. 2025. “Analisis Building Information Modelling (BIM) 5D Pada Pekerjaan Beton Bertulang Bangunan Kantor Kebun Muara Lawa.” 6(2):129–36. doi:10.52158/jaceit.v6i2.1006.

Zain, Hafizh Abdullah, Bagyo Mulyono, and Gathot Heri Sudibyo. 2022. “Analisis Perbandingan Efektivitas Metode Konvensional Dan BIM Pada Elemen Struktur Beton (Studi Kasus Gedung Pelayanan Pendidikan Fisip UNSOED).” 13(1):37–44. doi:10.34001/jdpt.v12i2.




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1127

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.