Analisis Keterlambatan Proyek Pembangunan Gudang dengan Precedence Diagram Method (PDM) dan Program Evaluation and Review Technique (PERT)
Abstract
Keywords
References
Amalia, R. N., Dianingati, R. S., & Annisaa’, E. (2022). The Effect of Number of Respondents on the Validity and Reliability Test Results of the Knowledge and Self-Medication Behaviour Questionnaire. Generics: Journal of Research in Pharmacy, 2(1), 9–15.
Aqila Pangestika, E., Syahrudin, & Rafie. (2022). Analisis Biaya Dan Waktu Pada Proyek Pembangunan Gedung Kuliah Terpadu Politeknik Negeri Pontianak Dengan Metode Pdm Dan Pert. https://jurnal.untan.ac.id/index.php/JMHMS/article/viewFile/53760/75676592668
Elviyanti, Iqbal Abdurrauf Zulikasio, & Helny Lalan. (2023). Analisa Schedule Dengan Precendence Diagram Method (Pdm) Proyek Gedung Oleh Pt.X. Journal of Scientech Research and Development, 5(1), 449–458. https://doi.org/10.56670/jsrd.v5i1.152
Jazir Alkas, M., P. Sari, D., Haryanto, B., & Aulia Ramadanri, N. (2023). Pengendalian Biaya dan Waktu Proyek dengan Metode Analisis Nilai Hasil Menggunakan Microsoft Project. In Jurnal Rekayasa Tropis, Teknologi, dan Inovasi (RETROTEKIN) (Vol. 1, Issue 1). DOI. https://doi.org/10.30872/retrotekin.v1i1.771
Lase, D. W., & Nusa, A. B. (2024). Analisis Penjadwalan Proyek Dengan Metode Pdm Dan Pert Pada Pembangunan Gedung Sekolah Minggu Hkbp Aek Kanopan Kecamatan Kualuh Hulu Kabupaten Labuhan Batu Utara. Jurnal Teknik Sipil, 3(1), 55–61. https://doi.org/10.30743/jtsip.v3i1.9553
Maskur, A., Saepudin, U., & Hilman, D. (2023). Analisis Penjadwalan Proyek Dengan Program Microsoft Project 2019 (Studi Kasus Proyek Pembangunan Ruang Pelayanan dan Business Centre di SMK Muhammadiyah Kawali). Jurnal Ilmiah Teknik Sipil, 1(1), 12–19. https://doi.org/10.25157/jiteks.v1i1.3190
Muhardis, M., Tola, B., & Haribowo, H. (2019). The respondent factors on the digital questionnaire responses. REID (Research and Evaluation in Education), 5(2), 144–151. https://doi.org/10.21831/reid.v5i2.26943
Pandya, M. W. Y., Nasution, D. S. D., Hendriyanti, I., & Pratiwi, R. (2024). Analisis Resource Leveling Menggunakan Precedence Diagram Method (PDM) pada Gedung Mako Lanal Balikpapan. Jurnal Talenta Sipil, 7(2), 445. https://doi.org/10.33087/talentasipil.v7i2.488
Populaire, S., Blanc, J., Denaux, T., Ginested, P., & Guitikeng, A. M. A. (2002). Fusion of expert knowledge with data using belief functions: A case study in waste-water treatment. Proceedings of the 5th International Conference on Information Fusion, FUSION 2002, 2(October), 1613–1618. https://doi.org/10.1109/ICIF.2002.1021011
Purwanto, A. Y., Utomo, G., & Pratiwi, R. (2024). Penerapan Metode PDM dan Pert pada Proyek Pembangunan Pusat Layanan Haji dan Umroh Terpadu Kota Balikpapan.
Rahardi, A. P., Hartono, W., & Handayani, D. (2024). PENGENDALIAN BIAYA DAN WAKTU MENGGUNAKAN EARNED VALUE ANALYSIS (EVA) DENGAN APLIKASI MICROSOFT PROJECT 2019 PADA PROYEK PENATAAN KALI PEPE HILIR PINTU AIR DEMANGAN LAMA-PINTU AIR DEMANGAN BARU SURAKARTA. Matriks Teknik Sipil, 12(1), 28. https://doi.org/10.20961/mateksi.v12i1.74377
Resta, M. B. (2023). Optimasi Biaya & Waktu Pada Penjadwalan Proyek Perumahan Dengan Microsoft Project (Studi kasus : Perumahan Cluster Pamulang). Jurnal Salome: Multidisipliner Keilmuan, 1(4), 295–306.
Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu. Jurnal Komposit, 7(2), 233–240. https://doi.org/10.32832/komposit.v7i2.14240
Sunatha, I. G. N., Diputera, I. G. A., & Hermawan, I. P. Y. (2023). ANALISIS RASIO BIAYA SUMBER DAYA RENCANA DAN REALISASI MENGGUNAKAN MICROSOFT PROJECT ( Studi Kasus : Kegiatan Pembangunan Jalan Pantai Pererenan ). Jurnal Ilmiah Kurva Teknik, 12(2), 166–173. https://e-journal.unmas.ac.id/index.php/jikt
Yulianti, D., Ulfah, L., Lubis, lega reskita, & Haki, H. (2025). Jurnal Talenta Sipil. Jurnal Talenta Sipil, 8(1), 430–439. https://doi.org/10.33087/talentasipil.v8i2.969
Zaiyanna Fitri, Dedek Ariansyah, H. P. (2022). Analisis Waktu Menggunakan Microsoft Project Pada Pekerjaan Gedung A1 Pemondokan Upt. Asrama Haji Embarkasi Aceh. Prince, 1(November), 60–67.
DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1110
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |


