Analisis Keterlambatan Proyek Pembangunan Gudang dengan Precedence Diagram Method (PDM) dan Program Evaluation and Review Technique (PERT)

Putra Chandra Rachmat Alim, Reno Pratiwi, Suheriah Mulia Devi

Abstract


Construction project delays are a common issue that significantly affect cost, quality, and completion time. This condition occurred in the construction of the PT Telkom Closed Warehouse in Balikpapan, which was originally planned to be completed within 90 calendar days but experienced a 28-day delay, resulting in a total completion time of 118 days. The delay was mainly caused by weak supervision and the absence of a structured planning method from the beginning. This study aims to analyze critical activities using the Precedence Diagram Method (PDM) and to calculate the probability of project completion using the Program Evaluation and Review Technique (PERT). The analysis results indicate that concrete structure work, wall installation, flooring, roofing, and mechanical-electrical work were identified as critical path activities. In addition, the PERT method provided an overview of the probability of achieving the actual project schedule. The conclusion of this research emphasizes that the application of PDM and PERT can help contractors plan schedules more accurately, reduce the risk of delays, and optimize the use of project resources.

Keywords


Building Information Modeling (BIM), BIM 5D, cost estimation, reinforced concrete, Cost Budget Plan (RAB).

Full Text:

PDF PDF

References


Amalia, R. N., Dianingati, R. S., & Annisaa’, E. (2022). The Effect of Number of Respondents on the Validity and Reliability Test Results of the Knowledge and Self-Medication Behaviour Questionnaire. Generics: Journal of Research in Pharmacy, 2(1), 9–15.

Aqila Pangestika, E., Syahrudin, & Rafie. (2022). Analisis Biaya Dan Waktu Pada Proyek Pembangunan Gedung Kuliah Terpadu Politeknik Negeri Pontianak Dengan Metode Pdm Dan Pert. https://jurnal.untan.ac.id/index.php/JMHMS/article/viewFile/53760/75676592668

Elviyanti, Iqbal Abdurrauf Zulikasio, & Helny Lalan. (2023). Analisa Schedule Dengan Precendence Diagram Method (Pdm) Proyek Gedung Oleh Pt.X. Journal of Scientech Research and Development, 5(1), 449–458. https://doi.org/10.56670/jsrd.v5i1.152

Jazir Alkas, M., P. Sari, D., Haryanto, B., & Aulia Ramadanri, N. (2023). Pengendalian Biaya dan Waktu Proyek dengan Metode Analisis Nilai Hasil Menggunakan Microsoft Project. In Jurnal Rekayasa Tropis, Teknologi, dan Inovasi (RETROTEKIN) (Vol. 1, Issue 1). DOI. https://doi.org/10.30872/retrotekin.v1i1.771

Lase, D. W., & Nusa, A. B. (2024). Analisis Penjadwalan Proyek Dengan Metode Pdm Dan Pert Pada Pembangunan Gedung Sekolah Minggu Hkbp Aek Kanopan Kecamatan Kualuh Hulu Kabupaten Labuhan Batu Utara. Jurnal Teknik Sipil, 3(1), 55–61. https://doi.org/10.30743/jtsip.v3i1.9553

Maskur, A., Saepudin, U., & Hilman, D. (2023). Analisis Penjadwalan Proyek Dengan Program Microsoft Project 2019 (Studi Kasus Proyek Pembangunan Ruang Pelayanan dan Business Centre di SMK Muhammadiyah Kawali). Jurnal Ilmiah Teknik Sipil, 1(1), 12–19. https://doi.org/10.25157/jiteks.v1i1.3190

Muhardis, M., Tola, B., & Haribowo, H. (2019). The respondent factors on the digital questionnaire responses. REID (Research and Evaluation in Education), 5(2), 144–151. https://doi.org/10.21831/reid.v5i2.26943

Pandya, M. W. Y., Nasution, D. S. D., Hendriyanti, I., & Pratiwi, R. (2024). Analisis Resource Leveling Menggunakan Precedence Diagram Method (PDM) pada Gedung Mako Lanal Balikpapan. Jurnal Talenta Sipil, 7(2), 445. https://doi.org/10.33087/talentasipil.v7i2.488

Populaire, S., Blanc, J., Denaux, T., Ginested, P., & Guitikeng, A. M. A. (2002). Fusion of expert knowledge with data using belief functions: A case study in waste-water treatment. Proceedings of the 5th International Conference on Information Fusion, FUSION 2002, 2(October), 1613–1618. https://doi.org/10.1109/ICIF.2002.1021011

Purwanto, A. Y., Utomo, G., & Pratiwi, R. (2024). Penerapan Metode PDM dan Pert pada Proyek Pembangunan Pusat Layanan Haji dan Umroh Terpadu Kota Balikpapan.

Rahardi, A. P., Hartono, W., & Handayani, D. (2024). PENGENDALIAN BIAYA DAN WAKTU MENGGUNAKAN EARNED VALUE ANALYSIS (EVA) DENGAN APLIKASI MICROSOFT PROJECT 2019 PADA PROYEK PENATAAN KALI PEPE HILIR PINTU AIR DEMANGAN LAMA-PINTU AIR DEMANGAN BARU SURAKARTA. Matriks Teknik Sipil, 12(1), 28. https://doi.org/10.20961/mateksi.v12i1.74377

Resta, M. B. (2023). Optimasi Biaya & Waktu Pada Penjadwalan Proyek Perumahan Dengan Microsoft Project (Studi kasus : Perumahan Cluster Pamulang). Jurnal Salome: Multidisipliner Keilmuan, 1(4), 295–306.

Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu. Jurnal Komposit, 7(2), 233–240. https://doi.org/10.32832/komposit.v7i2.14240

Sunatha, I. G. N., Diputera, I. G. A., & Hermawan, I. P. Y. (2023). ANALISIS RASIO BIAYA SUMBER DAYA RENCANA DAN REALISASI MENGGUNAKAN MICROSOFT PROJECT ( Studi Kasus : Kegiatan Pembangunan Jalan Pantai Pererenan ). Jurnal Ilmiah Kurva Teknik, 12(2), 166–173. https://e-journal.unmas.ac.id/index.php/jikt

Yulianti, D., Ulfah, L., Lubis, lega reskita, & Haki, H. (2025). Jurnal Talenta Sipil. Jurnal Talenta Sipil, 8(1), 430–439. https://doi.org/10.33087/talentasipil.v8i2.969

Zaiyanna Fitri, Dedek Ariansyah, H. P. (2022). Analisis Waktu Menggunakan Microsoft Project Pada Pekerjaan Gedung A1 Pemondokan Upt. Asrama Haji Embarkasi Aceh. Prince, 1(November), 60–67.




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1110

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.