Implementasi Total Quality Management (TQM) dalam Pengendalian Kualitas pada Proyek Pembangunan Gedung Bertingkat Tinggi di Jakarta

M. Alit Suryawan

Abstract


The rapid growth of the construction industry in Jakarta has driven an increasing need for an effective quality control system in high-rise building projects. Project complexity, the involvement of many parties, and the demands for construction efficiency and quality have made the implementation of Total Quality Management (TQM) increasingly relevant. This study aims to examine the implementation of TQM in quality control of high-rise building projects in Jakarta and identify challenges and solutions to its implementation. The study used a qualitative approach with a library research method that analyzed reputable international literature, construction quality standards (SNI, ASTM, BS, ISO), and case studies of high-rise building projects in Indonesia. The results showed that the implementation of TQM is still hampered by a lack of top management commitment, limited competent human resources, and a low understanding of TQM tools such as Statistical Process Control, Quality Circles, and Continuous Improvement. Based on a gap analysis between theory and practice, this study developed an integrated TQM framework that takes into account organizational culture, local regulations, and the conditions of the Indonesian construction market. The study concluded that the implementation of an adaptive and sustainable TQM framework can improve the quality of construction results, reduce rework rates, and increase client satisfaction in high-rise building projects in Jakarta.

Keywords


Total Quality Management; Quality Control; Construction; High-rise Buildings; Jakarta.

Full Text:

PDF

References


Agustian, D., Studi Pendidikan Vokasional Teknik Elektro, P., Sultan Ageng Tirtayasa, U., Raya Palka Km, J., & Serang Provinsi Banten, K. (2025a). STUDI PENERAPAN METODE QUALITY FUNCTION DEPLOYMENT (QFD) TERHADAP PENGEMBANGAN PRODUK DI BERBAGAI BIDANG. JAPTI: Jurnal Aplikasi Ilmu Teknik Industri, 6(1), 20–27. www.journal.univetbantara.ac.id/index.php/japti

Dwi Permana, S., & Siregar, T. (2023). Manajemen Risiko Keselamatan dan Kesehatan Kerja pada Perawat Menggunakan Hazard Identification Risk Assessment And Risk Control (Vol. 04, Issue 2). http://jk3l.fkm.unand.ac.id/index.php/jk3l/index

Fahmi Fasihuddin, A. (2025). Prosiding Seminar Nasional Teknologi Industri Berkelanjutan V (SENASTITAN V) Surabaya.

Fantasia, I. F., & Wahyudi, D. R. (2023). Identifikasi Pengendalian Kualitas Produk Menggunakan Metode Statistical Process Control Pada PT X. http://jurnal.utu.ac.id/invasi/

Ibnu Sholeh, M., Arifin, Z., Rosyidi, H., Syafi, A., & Kh Muhammad Ali Shodiq Tulungagung, S. (2024). PENDEKATAN TOTAL QUALITY MANAGEMENT UNTUK MENINGKATKAN KUALITAS LULUSAN BERJIWA INTERPRENEURSHIP DI INSTITUSI PENDIDIKAN ISLAM. In Jotika Journal in Education (Vol. 4, Issue 1).

Ikhsan, M. N., Kunci, K., Bahaya, I., Kerja, K., Manual, P., Risiko, P., & Risiko, P. (2025). Identifikasi dan Pengendalian Risiko pada Pekerjaan Lifting Manual Menggunakan Metode Hazard Identification, Risk Assessment, and Risk Control (HIRARC). In Journal of Industrial Engineering and Technology (Vol. 1, Issue 1).

Mahaputra, S. M. (2011). Analisis Pengendalian Kualitas Produk Plastik Injeksi dengan Menggunakan Metode Statistical Process Control (SPC) dan Kaizen di CV. Gradient Kota Bandung.

Muttaqin, A., Studi Manajemen, P., Ekonomi dan Bisnis, F., & Trisakti, U. (2025). Pengaruh Self Efficacy, Empowerment dan Service Oriented Organizational Citizenship Behavior Terhadap Komitmen Organisasi: Studi Kasus pada Perusahaan Transportasi. 5(2).

Muttaqin Rani, F., & Ilham, R. (2025). Analisis Pengendalian Kualitas Kecacatan Produk Pada Proses Produksi Kain Menggunakan Metode Statistical Quality Control (Studi Kasus : PT. Triana Harvestindo Nusantara).

Neyestani, B. (2017, January 23). Effects of ISO 9001 Standard on Critical Factors of Project Management in Construction Industry. https://doi.org/10.17758/uruae.ae0117503

Pujiandi, A., Kusumo Bintoro, B., & Author, C. (2020). Analysis on the Influence of Planning, Implementation and Supervision of Cost Overruns on High Rise Building Project in Jabotabek. International Journal of Research and Review (Ijrrjournal.Com), 7(1), 1.

Retno Sari, S., & Digdowiseiso, K. (2022). Empowering Leadership Dalam Peningkatan Kreativitas Karyawan. In Jurnal Kajian Ilmiah (Vol. 22, Issue 1). http://ejurnal.ubharajaya.ac.id/index.php/JKI

Rohimi, S. (2025). Integrasi Lanskap dalam Desain Arsitektur Bangunan Komersial.

Sihombing, L. B., & Sumurung, G. A. (2023). The quality assurance factors that affect the product quality performance: A case of the building X construction project in Jakarta. IOP Conference Series: Earth and Environmental Science, 1195(1). https://doi.org/10.1088/1755-1315/1195/1/012040

Sugiyono. (2022). Metode penelitian kunatitatif kualitatif dan R&D. Bandung.

Trianung, T., Oktra Rajagukguk, H., Sartika, D., & Negeri Jakarta, U. (2024). Total Quality Management untuk Mewujudkan Perguruan Tinggi yang Bermutu. https://jurnaldidaktika.org

Widiasanti, I., Kemala Dewi, S., Akbar, B., Pradana, A., Hammadi, F. R., Adhetri, N. T., & Kuncoro, E. A. (2024). Studi Manajemen Kualitas Pada Sektor Konstruksi Gedung. JAMBURA, 6(3). http://ejurnal.ung.ac.id/index.php/JIMB




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1106

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.