Keterlambatan Pembongkaran dan Pemasangan Lift Baru Menggunakan Metode House Of Risk (HOR)
Abstract
Keywords
Full Text:
PDFReferences
Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004
Dwiantoro, D., Yoansa, A. Y., Indrayana, D. V., Mentari, S., & Widyatami, F. S. (2024). Analisis faktor penyebab keterlambatan proyek “XYZ”. Jurnal Talenta Sipil, 7(1), 388-403. https://doi.org/10.33087/talentasipil.v7i1.490
Fadhil, M., & Rahman, A. (2020). Risk assessment and mitigation in construction project using FMEA and HOR method. Journal of Engineering and Applied Sciences, 15(7), 1661–1669.
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing country: Ghana as a case study. International Journal of Project Management, 21(5), 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8
Pamungkas, I., Irawan, H. T., & Hadi, K. (2023). Identifikasi dan mitigasi risiko pada proyek konstruksi menggunakan metode House of Risk: Studi kasus. Jurnal Optimalisasi, 10(1), 45–55.
Pujawan, I. N., & Geraldin, L. H. (2009). House of Risk: A model for proactive supply chain risk management. Business Process Management Journal, 15(6), 953–967. https://doi.org/10.1108/14637150911003801
Pujawan, I. N. (2017). Supply Chain Management (3rd ed.). Surabaya: Guna Widya.
Purwaningsih, R., Ibrahim, C. N., & Susanto, N. (2021). Analisis dan mitigasi risiko supply chain pada pengadaan material produksi dengan model House of Risk (HOR) pada PT. Toba Pulp Lestari Tbk, Porsea, Sumatra Utara. MIX: Jurnal Ilmiah Manajemen, 11(1), 64–77. https://doi.org/10.22441/mix.2021.v11i1.005
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
Susanti, A., & Wibowo, M. A. (2020). Analisis risiko keterlambatan proyek konstruksi gedung dengan metode FMEA. Jurnal Konstruksi, 18(2), 115–124.
Ulfah, M., Sutopo, W., & Hisjam, M. (2016). Analisis dan perbaikan manajemen risiko rantai pasok gula rafinasi dengan pendekatan House of Risk. Jurnal Teknologi Industri Pertanian, 26(1), 87–103. https://doi.org/10.24961/j.tek.ind.pert.2016.26.1.87
Wijaya, H., & Pratama, A. (2019). Manajemen risiko keterlambatan proyek konstruksi dengan metode probabilistik. Jurnal Teknik Sipil, 14(1), 23–32.
Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601–614. https://doi.org/10.1016/j.ijproman.2007.03.001
El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry. International Journal of Project Management, 26(4), 431–438. https://doi.org/10.1016/j.ijproman.2007.07.004
Chan, D. W. M., & Kumaraswamy, M. M. (2002). Compressing construction durations: Lessons learned from Hong Kong building projects. International Journal of Project Management, 20(1), 23–35. https://doi.org/10.1016/S0263-7863(00)00032-6
DOI: http://dx.doi.org/10.33087/talentasipil.v9i2.1001
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |


