Pemodelan 3D pada Bangunan Gedung Guna Mendukung Implementasi Bim 5D pada Proyek Konstruksi

Rakha Radhitya Putra Yudiayanto, Lila Ayu Ratna Winanda, Hadi Surya Wibawanto Sunarwadi, Deviany Kartika

Abstract


Nowadays, many have developed in terms of technology and many other sectors. The use of The use of the latest technology also has a big impact on the construction business in Indonesia. Indonesia. Technological developments in the construction sector also have an impact on increasing the value of development efficiency. BIM can overcome work delays and minimize errors in calculating costs on some construction work Therefore, the purpose of this research is to modeling the structural system in three dimensions (3D) on the building as part of the Building Information Modeling (BIM) implementation. The method used in this research is by modeling working drawings and materials previously obtained from working drawings and materials previously obtained from the project used as the object of research into a three-dimensional (3D) object. object of research into a three-dimensional (3D) object using relevant and appropriate software, which will support the implementation of the project to support BIM Implementation. implementation of the project to support the Implementation of 5D BIM on construction projects. Construction project. The results showed that the three-dimensional (3D) structural system can be modeled (3D) structural system can be modeled on the work of columns, beams, foundations, stairs, ramp, and floor plate. The results of this research are expected to support implementation of BIM at least up to 5D level so that it can be known the cost efficiency of thecost efficiency in building work 

Keywords


BIM, Efisient Construction, Autodesk Revit

Full Text:

PDF

References


Akbar, M. N. F., Ratnawinanda, L. A., & Manaha, Y. P. (2024). Implementasi Building Information Modeling (BIM) Pada Konstruksi High Risk Building. 8(1), 356–366. https://doi.org/10.33087/talentasipil.v8i1.855

Akponeware, A. O., & Adamu, Z. A. (2017). Clash Detection or Clash Avoidance ? An Investigation into Coordination Problems in 3D BIM. 1–28. https://doi.org/10.3390/buildings7030075

Alrizqi, M. R., & Fazri, I. (2023). Keuntungan , Batasan , dan Tantangan Penggunaan Building Information Modeling dalam Proses Pembelajaran. 21–30.

Anindya, A. A., & Gondokusumo, O. (2020). Kajian Penggunaan Cubicost Untuk Pekerjaan Quantity Take Off Pada Proses Tender. Jurnal Muara Sains, Teknologi, Kedokteran Dan Ilmu Kesehatan, 4(1), 83. https://doi.org/10.24912/jmstkik.v4i1.6718

Badan Standardisasi Nasional. (2019). Persyaratan Beton Struktural untuk Bangunan Gedung. Sni 2847-2019, 8, 720.

Bobby A, S. S. (2024). Teknologi BIM ( Building Information Modeling ) dalam Manajemen Proyek Konstruksi Bobby Ahmad Sarmadi Siregar. 1–8.

Ferial, R., Hidayat, B., Pesela, R. C., & Daoed, D. (2022). Quantity take-off berbasis building information modeling (bim) studi kasus: gedung bappeda padang. Jurnal Rekayasa Sipil (JRS-Unand), 17(3), 228. https://doi.org/10.25077/jrs.17.3.228-238.2021

Heryanto, S., Subroto, G., Arsitektur, P. S., Podomoro, U. A., Podomoro, U. A., Arsitektur, P. S., & Podomoro, U. A. (2020). KAJIAN PENERAPAN BUILIDNG INFORMATION MODELLING ( BIM ) DI INDUSTRI JASA KONSTRUKSI Penerapan teknologi informasi dalam proses bangunan gedung ( building delivery menggunakan software Information Modellling penting dalam industry jasa konstruksi BIM telah. Journal of Architecture Innovation, 4(2).

IPM, P., Rozandi, A., Budiman, D., Indra Ramdani, & Vladimirovna, K. E. (2022). Implementasi Building Information Modeling (BIM) Pada Proyek Perumahan. Jurnal TESLINK : Teknik Sipil Dan Lingkungan, 4(1), 1–15. https://doi.org/10.52005/teslink.v4i1.105

Reista, I. A., & Ilham, A. (2022). Implementasi Building Information Modelling ( BIM ) dalam Estimasi Volume Pekerjaan Struktural dan Arsitektural. 2(1), 13–22.

Rofiq, M. A., & Witjaksana, B. (2023). PERHITUNGAN VOLUME BETON DAN BESI MENGGUNAKAN SOFTWARE AUTODESK REVIT ( STUDI KASUS : BANGUNAN PRASEDIMENTASI SPAM GRESIK ). 7(1), 1–9.

Saputra, R. E., Handra, H., & Primayesa, E. (2021). Analisis Pengaruh Infrastruktur Jalandan Teknologi Informasi Dan Komunikasi (Tik) Terhadap Pembangunan Manusia Di Wilayah Timur Indonesia. Jurnal Menara Ekonomi : Penelitian Dan Kajian Ilmiah Bidang Ekonomi, 7(1), 66–76. https://doi.org/10.31869/me.v7i1.2532

Simanjuntak, R., & Baskoro, T. (2020). P-59 Kajian Faktor-Faktor Manajemen Pembiayaan Proyek Dalam Implementasi Bim Pada Proyek Bangunan Gedung Review of Factors of Project Financing Management in Implementation of Bim on Building Projects. 411–416. https://ilovemyarchitect.com/2018/07/05/the-7-

Umam, F. N., Erizal, E., & Putra, H. (2022). Peningkatan Efisiensi Biaya Pembangunan Gedung Bertingkat Dengan Aplikasi Building Information Modeling (BIM) 5D. Teras Jurnal : Jurnal Teknik Sipil, 12(1), 245. https://doi.org/10.29103/tj.v12i1.704

Wijaya, I. G. R., Sudiarsa, M., & Setyono, E. Y. (2022). Analisis Faktor Penyebab Dominan Change Order Dan Pengaruhnya Terhadap Pelaksanaan Proyek Konstruksi. 1–20.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.877

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.