Probabilistik Durasi Proyek Konstruksi Menggunakan Integrasi Critical Path Method dan Simulasi Monte Carlo pada Pembangunan Gedung Ruang Kelas Belajar MAN 4 Kampar
Abstract
Keywords
Full Text:
PDFReferences
Acebes, F., Pajares, J., Manuel, J., & López-paredes, A. (2014). A new approach for project control under uncertainty Going back to the basics. International Journal of Project Management, 32(1), 423–434. https://doi.org/http://dx.doi.org/10.1016/j.ijproman.2013.08.003
Durdyev, S. (2020). Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 2(2017), 1–10. https://doi.org/10.1108/ECAM-02-2020-0137
El-dash, K. M. M., Ramadan, O. M. O., & Youssef, W. M. M. A. (2019). Duration Prediction Models for Construction Projects in Middle East. Engineering, Technology & Applied Science Research, 9(2), 3924–3932.
Hartmann, V., Lahmer, T., & Smarsly, K. (2017). Project scheduling under uncertainty and resource constraints. Proc. Appl. Math. Mech, 840, 839–840. https://doi.org/10.1002/pamm.201710387
Ichsan, M., Isvara, W., & Karim, S. (2025). Monte Carlo Simulation for Enhancing the Schedule Completion Forecast of Jakarta Central Railway Station Construction Project. Applied Science, 15(13), 1–20. https://doi.org/https://doi.org/10.3390/app15137464
Jian-wen, H., & Xing-xia, W. (2009). Risk Analysis of Construction Schedule Based on PERT and MC Simulation. International Conference on Information Management, Innovation Management and Industrial Engineering, 1(2), 150–153. https://doi.org/10.1109/ICIII.2009.195
Khamooshi, H., & Golafshani, H. (2014). EDM: Earned Duration Management, a new approach to schedule performance management and measurement. International Journal of Project Management, 32(6), 1019–1041. https://doi.org/10.1016/j.ijproman.2013.11.002
Kim, B., & Pinto, J. K. (2019). What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion. Journal of Management in Engineering, 35(2), 1–30. https://doi.org/10.1061/(asce)me.1943-5479.0000671
Kim, B., & Reinschmidt, K. F. (2009). Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution. Journal Of Construction Engineering And Management, 1(March), 178–186.
Koulinas, G. K., Xanthopoulos, A. S., Tsilipiras, T. T., & Koulouriotis, D. E. (2020). Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System. Buildings, 10(134), 1–19. https://doi.org/doi:10.3390/buildings10080134
Lee, H., Shin, J., Park, M., & Ryu, H. (2009). Probabilistic Duration Estimation Model for High-Rise Structural Work. Journal Of Construction Engineering And Management, 2(December), 1289–1298. https://doi.org/10.1061/共ASCE兲CO.1943-7862.0000105
Mardiaman, & Siregar, J. (2023). Analisis Deviasi Kemajuan Pekerjaan Berdasarkan Persentase Durasi Waktu Pada Pekerjaan Konstruksi Bangunan. Menara : Jurnal Teknik Sipil, 18(152), 59–65.
Roberta, I., & Mardiaman. (2025). Evaluasi Perbandingan Kinerja Proyek Konstruksi Pabrik Kelapa Sawit Menggunakan Metode Earned Value : Studi Kasus Dua Proyek Pabrik Kelapa Sawit. Jurnal Arsip Rekayasa Sipil Dan Perencanaan (JARSP), 8(3), 242–249. https://doi.org/https://doi.org/10.24815/jarsp.v8i3.46033
Sadeghi, N., Fayek, A. R., & Pedrycz, W. (2010). Fuzzy Monte Carlo Simulation and Risk Assessment in Construction. Computer-Aided Civil and Infrastructure Engineering, 25(4), 238–252. https://doi.org/10.1111/j.1467-8667.2009.00632.x
Saputra, N., Handayani, E., & Dwiretnani, A. (2021). Analisa Penjadwalan Proyek dengan Metode Critical Path Method (CPM) Studi Kasus Pembangunan Gedung Rawat Inap RSUD Abdul Manap Kota Jambi. Jurnal Talenta Sipil, 4(1), 44. https://doi.org/10.33087/talentasipil.v4i1.48
Sari, D. M., Agustappraja, H. R., Arif, S., & Hepiyanto, R. (2025). Biaya dan Waktu Proyek Gedung Satnarkoba dengan Metode CPM dan Metode PERT. Jurnal Talenta Sipil Vol, 8(2), 900–906. https://doi.org/10.33087/talentasipil.v8i2.969
Setiawan, A., & Labombang, M. (2024). Scheduling The Construction of Low-Income Community Houses in Palu City Using the Probabilistic Duration Method Scheduling The Construction of Low-Income Community Houses in Palu City Using the Probabilistic Duration Method. IICESSD-2023, 1–8. https://doi.org/10.1088/1755-1315/1355/1/012013
Shinde, R. (2021). Probabilistic Integration of Cost and Schedule Risk Management in Construction Engineering : A Monte Carlo Framework for Enhanced Owner Decision-Making. Journal of Informatics Education and Research, 1(3), 67–72.
Sweis, G., Sweis, R., Abu Hammad, A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665–674. https://doi.org/10.1016/j.ijproman.2007.09.009
Utari, R. P., Wahyudiono, S., Amal, A. S., & Ardian, L. (2025). G-Tech : Jurnal Teknologi Terapan Cost and Time Control Using The Earned Value Concept ( EVM ) Method : G-Tech : Jurnal Teknologi Terapan, 9(4), 2229–2239.
Vanhoucke, M. (2015). On The Use Of Schedule Risk Analysis For Project Management. The Journal Of Modern Project Management, 1(April), 109–117.
Xiao, X., Wang, F., Li, H., & Skitmore, M. (2018). Modelling The Stochastic Dependence Underlying Construction Cost And Duration. Journal of Civil Engineering and Management, 24(6), 444–456.
Xie, W., Deng, B.-C., Yin, Y., Lv, X., & Deng, Z. (2022). Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation. Buildings, 12(11), 2028. https://doi.org/10.3390/buildings12112028
DOI: http://dx.doi.org/10.33087/talentasipil.v9i2.1337
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |