Analisis Percepatan Waktu Menggunakan Metode Crashing dengan Penambahan Jam Kerja Tiga Jam dan Sistem Shift

Aulia Sivani, Elvira Handayani, Dwitya Okky Azanna, Annisaa Dwiretnani, Riki Saputra, Rioni Rizki Aldiansyah

Abstract


During the construction process of a project, many unexpected events can occur, one of which is project delays. These delays may result from various factors such as unfavorable weather conditions, design changes, planning errors, and several others. Therefore, it is necessary to consider alternative strategies to support project acceleration. These alternatives may include extending working hours, using more productive equipment, increasing the number of workers, utilizing materials that are quicker to install, and implementing faster construction methods. This study analyzes the acceleration of project completion time in the construction project of SMPN 3 using the crashing method, with two alternatives: extending working hours by three hours and implementing a shift system. The objective of this research is to determine the total project duration after applying crashing with the two alternatives and to identify which critical path activities were accelerated in the SMPN 3 construction project. Based on the analysis, the total project duration after crashing using the three-hour extended workday alternative is 175 days, representing a time savings of approximately 20% compared to the normal duration of 218 days. Meanwhile, the total project duration after crashing using the shift system alternative is 109 days, resulting in a time savings of approximately 50% from the original duration of 218 days.

Keywords


Crashing; Shift; Overtime.

Full Text:

PDF

References


Aboelmagd, Y. M. R. (2021). Practical crash duration estimation for project schedule activities. Journal of King Saud University–Engineering Sciences, 33(1), 1–14. https://doi.org/10.1016/j.jksues.2019.09.005

Adil, M., Lusiana, L., & Syahrudin, S. (2023). Optimalisasi biaya dan waktu proyek menggunakan metode crashing dengan penambahan waktu kerja lembur dan sistem kerja shift. JeLAST: Jurnal Teknik Kelautan, PWK, Sipil, dan Tambang, 10(1). https://doi.org/10.26418/jelast.v10i1.62949

Afifah, A. (2017). Percepatan Jadwal (Crashing) Menggunakan Sistem Shift Dengan Analisis PDM. Jurnal Teknik Sipil Universitas Islam Indonesia.

Ahmad Ridwan (2021). Analisis Percepatan Proyek Menggunakan Metode Crashing dengan Penambahan Jam Kerja Empat Jam dan Sistem Shift. Universitas Kediri.

Bismoko Rahardian Suseno, 2021. Analisis Percepatan Waktu Penyelesaian Proyek Menggunakan Metode Crashing dengan Penambahan Jam Kerja dan Penerapan Sistim Shift. Institut Teknologi Nasional Yogyakarta.

Dimyanti, Hamdan & Nurjaman, Kadar. (2014). Manajemen Proyek. Bandung: CV. Pustaka Setia.

Ervianto, W. I (2005). Manajemen Proyek Konstruksi. Yogyakarta: Andi

Ervianto, W. I. (2002). Manajemen Proyek Konstruksi, Edisi Pertama. Yogyakarta: Salemba Empat.

Ervianto, W. I. 2006. Manajemen Konstruksi Edisi Revisi. Yogyakarta.

Hayun, A, Anggara, 2005. Perencanaan dan Pengendalian Proyek Dengan Metode CPM (Study kasus fly over Ahmad Yani Karawang). Jurnal The Winners, Vol 6, No2, pp 155-179.

Husen Abrar, 2009. Edisi Revisi Manajemen Konstruksi Proyek Perencanaan, Penjadwalan dan Pengendalian Proyek. Yogyakarta: Andi.

Herjanto, Eddy. 2003. Manajemen Produksi dan Operasi. Jakarta: Grasindo.

Husen Abrar. (2010). Manajemen Proyek. Yogyakarta: Andi.

Irsyad, A., Puspita, I. A., & Tripiawan, W. (2022). Schedule acceleration planning in construction project: Case study of Japek II Selatan Tollroad. International Journal of Innovation in Enterprise System, 6(1), 24–37. https://doi.org/10.25124/ijies.v6i01.145

Keputusan Menteri Tenaga Kerja dan Transmigrasi Republik Indonesia. NomorKep.102/M3n/VI/2004 tentang Waktu Kerja Lembur dan Upah Lembur.

Keputusan Menteri Tenaga Kerja. Nomor KEP-35/MEN/IV/2021, tentang Waktu Kerja Lembur dan Upah Kerja Lembur.

Malik, A. 2010. Pengantar Bisnis Jasa Pelaksanaan Konstruksi. Andi, Yogyakarta.

Mila. N. Purna Wati. 2015. Analisis Percepatan Proyek menggunakan Metode Time Cost Trade Off dengan Penambahan Jam Kerja Lembur Optimum. Surakarta: Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta.

Ningrum, 2016. Penerapan Metode Crashing dalam Percepatan Durasi Proyek Dengan Alternatif Penambahan Jam Kerja Lembur dan Sistem Shift Kerja. Tugas Akhir. Universitas Sebelas Maret.

Retor, G. D. J., & Oei, F. J. (2023). Analisis pengendalian proyek dengan metode crashing pada Proyek PT X di Jakarta. JMTS: Jurnal Mitra Teknik Sipil, 6(4). https://doi.org/10.24912/jmts.v6i4.24974

Soeharto, I. 1995. Manajemen Proyek dari Konseptual Sampai Operasional. Jakarta: Erlangga

Soeharto, I. 1997. Manajemen Proyek dari Konseptual Sampai Operasional Jilid II Erlangga, Jakarta.

Soeharto, I. 1999. Manajemen Proyek dari Konseptual Sampai Operasional Jilid I Edisi Kedua Erlangga, Jakarta.

Terry George, R. 1992. Prinsip-Prinsip Manajemen. Jakarta: Bumi Aksara.




DOI: http://dx.doi.org/10.33087/talentasipil.v9i2.1225

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.