Biaya dan Waktu Proyek Gedung Satnarkoba dengan Metode CPM dan Metode PERT
Abstract
In a building construction project, of course, there are many methods used to schedule a job as well as the cost budget. The purpose of this research is to determine the results of time and cost analysis on the Satnarkoba Police Lamongan Building Construction project. This research uses Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT) with the help of Ms Word 2010 application program to analyze cost and time management. From the results of the analysis, a Network Diagram was found in which there was a series of critical work. Cost analysis is obtained by processing RAB and AHSP data. From this data, the volume, coefficient and wages of workers are obtained as a reference for processing workers' wage data. Based on the results of the analysis found, the critical trajectory, namely with work codes A, E, D, C, G, J, K, N, AF, and AE on a project that lasts for 180 days, gets an acceleration result of 144 days, so the chances of the project can be completed within 144 + 36 = 180 days, with a probability of 4.02%. Based on the results obtained, the average level of probability is greater than 4.02%, this is included in the very high category. In terms of costs incurred from each development, it shows optimal cost efficiency.
Keywords
Full Text:
PDFReferences
Castollani, A., & Puro, S. (2020). Analisis Biaya dan Waktu pada Proyek Apartemen Dengan Metode Earned Value Concept. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 3(1), 39–48. https://doi.org/10.54367/jrkms.v3i1.701
Collins, S. P., Storrow, A., Liu, D., Jenkins, C. A., Miller, K. F., Kampe, C., & Butler, J. (2021). No Title 済無No Title No Title No Title. 4(2), 1568–1577.
Dwiretnani, A., & Kurnia, A. (2018). Optimalisasi Pelaksanaan Proyek Dengan Metode Cpm (Critical Path Methode). Jurnal Talenta Sipil, 1(2), 58. https://doi.org/10.33087/talentasipil.v1i2.8
Hidayah, R., Ridwan, A., & Cahyo, Y. (2018). Analisa Perbandingan Manajemen Waktu Antara Perencanaan Dan Pelaksanaan (Studi Kasus: Pada Gedung Asrama Pondok Pesantren Sananul Huda Di Selorejo Kab. Blitar). Jurnal Manajemen Teknologi & Teknik Sipil, 1(2), 281–290. https://doi.org/10.30737/jurmateks.v1i2.416
Hutasoit, P. hubertus, B.F.Sompie, & Pratasis, P. A. K. (2014). Pengaruh Percepatan Durasi Terhadap Peningkatan Biaya. (Studi Kasus : Perumahan Puri Kelapa Gading). Tekno Sipil, 12(61), 54–64.
Iluk, T., Ridwan, A., & Winarto, S. (2020). Penerapan Metode CPM Dan PERT Pada Gedung Parkir 3 Lantai Grand Pannglima Polim Kediri. https://doi.org/10.30737/jurmateks
Kurniatullah, K., Wibowo, T. J., & ... (2016). Perancangan dan Penjadwalan pada Proyek Storage Tank dengan Metode Critical Path Method. Jurnal INTECH Teknik …, 2(2), 63–69. http://e-jurnal.lppmunsera.org/index.php/INTECH/article/view/867%0Ahttps://e-jurnal.lppmunsera.org/index.php/INTECH/article/download/867/2529
Lokajaya, I. N. (2019). 2970-7799-1-Sm. Jurnal Teknik Industri, 16(2), 104–125.
Lugina, L., Agustian, S., & Geraldo, C. S. (2022). Penerapan Metode Project Evaluation adn Review Technique (PERT) dan Critical Path Method (CPM) terhadap Pembangunan Gedung. Jurnal Pendidikan Tambusai, 6(8), 880–888. https://jptam.org/index.php/jptam/article/view/3014
Mahulae, A., Manurung, E. H., & Mubarok, A. (2022). Analisis Nilai Hasil terhadap Waktu pada Proyek Konstruksi Gedung Bertingkat Tinggi. Formosa Journal of Science and Technology, 1(6), 615–624. https://doi.org/10.55927/fjst.v1i6.1514
Qomariyah, S., & Hamzah, F. (2013). Analisis Network Planning Dengan Cpm (Critical Path Method) Dalam Rangka Efisiensi Waktu Dan Biaya Proyek. 1(4), 408–416.
Rahma, K. A., & Kamandang, Z. R. (2023). Analisis Penjadwalan Proyek Gedung Bertingkat Menggunakan Metode CPM (Critical Path Method) dan PERT (Program Evaluation and Review Technique) (Studi Kasus: Proyek Pembangunan Tahap 1 Rumah Sakit Muhammadiyah Gresik). Jurnal Ilmiah Universitas Batanghari Jambi, 23(2), 1275. https://doi.org/10.33087/jiubj.v23i2.4126
Rini, I. P. (2017). Pengaruh Produktivitas Tenaga Kerja Terhadap Kinerja Waktu Proyek Pada Bangunan Bertingkat. Jurnal Infrastruktur, 3(2), 127–135.
Shah, T. A., & Suprapto, B. (2024). METODE CPM DAN PERT PADA PELAKSANAAN PEKERJAAN LAMONGAN. 14(2), 96–103.
Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu. Jurnal Komposit, 7(2), 233–240. https://doi.org/10.32832/komposit.v7i2.14240
DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.969
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |


