Evaluasi Produktivitas Angkat Baja pada Bangunan Pabrik Kelapa Sawit

Desmon Silitonga, Mardiaman Mardiaman, Indriasari Indriasari

Abstract


The growth of the industrial sector in Indonesia has driven the widespread use of steel structures due to their advantages in strength, construction speed, and cost efficiency. One significant application is in the construction of palm oil mills (PKS), which often face challenging site conditions requiring effective erection planning. However, steel structure erection productivity in PKS projects is frequently hindered by inappropriate work methods and unsystematic time recording. Significant variations in productivity across structural elements and the lack of comparative studies between crane and manual methods create a research gap that needs to be addressed. This study aims to evaluate and compare the productivity of steel structure erection in the Mill Building of a PKS project using crane and manual methods. A quantitative case study approach was applied at PT. Tunggal Yunus Estate, Tapung, Riau, with primary data collected through field observations, interviews, and project documentation. Productivity (kg/hour) was calculated based on the weight and installation duration of each structural element. The results show an average erection productivity of 480.98 kg/hour, with the highest productivity reaching 955.44 kg/hour for main columns and rafters using a crane. In contrast, manual methods for secondary elements such as wind bracing and canopy yielded the lowest productivity at 156.78 kg/hour. These findings confirm that crane methods are more effective for main structural elements, while the use of manual methods should be carefully adapted to site conditions to maintain time-cost efficiency.


Keywords


erection productivity, steel structures, crane method, palm oil mill project, time-cost efficiency

Full Text:

PDF

References


Choyroh, Annasya Nadhira, and Suripto. 2024. “PELAKSANAAN ERECTION PC-I GIRDER TYPE SKEW MENGGUNAKAN CRAWLER CRANE Keywords : Crawler Crane ; Erection ; Capacity ; PC-I Girder Merupakan Bagian Dari Jakarta Outer Pada Proyek Pembangunan Jalan Tol X Jalan Tol X Seksi 2 Pengangkatan Tiap Bentang PCI Gir.” In Seminar Nasional Teknik Sipil Politeknik Negeri Jakarta, 2023, 85–97.

Dwiantoro, Deny, Acep Yosep Yoansa, Desiderius Viby Indrayana, Sekar Mentari, and Filki Suri Widyatami. 2024. “Analisis Faktor Penyebab Keterlambatan Proyek ‘XYZ.’” Jurnal Talenta Sipil 7 (1): 388–403. https://doi.org/10.33087/talentasipil.v7i1.490.

Gunduz, Murat, and Abdulrahman Abu-hijleh. 2020. “Assessment of Human Productivity Drivers for Construction Labor through Importance Rating and Risk Mapping.” Sustainability 2020 12 (8614): 1–18. https://doi.org/doi:10.3390/su12208614.

Hasan, Abid, and Bassam Baroudi. 2018. “Factors Affecting Construction Productivity : A 30 Year Systematic Review.” Engineering, Construction and Architectural Management, 1–23. https://doi.org/10.1108/ECAM-02-2017-0035.

Horas, Jan, and Veryady Purba. 2020. Industri Sawit Indonesia Dalam Pembangunan Ekonomi Nasional.

Limanto, Sentosa. 2009. “Analisis Produktivitas Pemancangan Tiang Pancang Pada Bangunan Tinggi Apartemen.” In Seminar Nasional, 293–305.

Mardiaman, and Indriasari. 2021. “Faktor-Faktor Penentu Utama Keterlambatan Pada Pekerjaan Konstruksi Pabrik ( Studi Kasus : Pabrik Kawasan Cikarang ).” E-Journal CENTECH 2020 2 (1): 1–11. http://ejournal.uki.ac.id/index.php/cen.

Mardiaman, and Jhony Siregar. 2023. “Analisis Deviasi Kemajuan Pekerjaan Berdasarkan Persentase Durasi Waktu Pada Pekerjaan Konstruksi Bangunan.” Menara : Jurnal Teknik Sipil 18 (1): 59–65. https://doi.org/https://doi.org/10.21009/jmenara.v18i1.29213.

Osuizugbo, I C, and E E Uhunmwangho. 2021. “Factors Affecting Steel Structure Erection in Developing Countries : A Case Study of Nigerian Construction Industry.” Nigerian Journal of Technology (NIJOTECH 40 (5): 771–78. https://doi.org/http://dx.doi.org/10.4314/njt.v40i5.2 Factors.

Pane, Mara Naek, Azhar Azhar, and Mardiaman. 2023. “Evaluation of the Implementation Time of The Apbn/Apbd Project at The End of The Year With A Single-Year Budget.” Jurnal Syntax Admiration 4 (3). https://doi.org/10.46799/jsa.v4i3.569.

Park, By Hee-sung, and Hee-sung Park. 2006. “Conceptual Framework of Construction Productivity Estimation.” KSCE Journal of Civil Engineering 10 (5): 311–17. https://doi.org/10.1007/BF02830084.

Park, Hee-sung, Stephen R Thomas, and Richard L Tucker. 2005. “Benchmarking of Construction Productivity.” Journal Of Construction Engineering And Management © Asce / July 2005 131 (July): 772–78.

Rashid, Ibrahim, Said Aboul Haggag, and Hosam Elhegazy. 2015. “Improving the Crew Productivity and Projects ’ Performance for the Construction of Steel Structure Projects for the Construction of Steel Structure Projects.” World Applied Sciences Journal 33 33 (2): 178–283. https://doi.org/10.5829/idosi.wasj.2015.33.02.14572.

Rustan, Fathur Rahman, Try Sugiyarto Soeparyanto, and Try Sugiyarto Soeparyanto. 2020. “Produktivitas Kerja Pekerja Dalam Pemasangan Rangka Atap Baja Perumahan Ditinjau Dari Segi Labour Utilization Rate.” Fropil 8 (1): 1–24. https://doi.org/DOI: https://doi.org/10.33019/fropil.v8i1.1719 PRODUKTIVITAS.

Sitompul, Rislima Febriani, Endri Endri, Sawarni Hasibuan, Choesnul Jaqin, Arum Indrasari, and Lia Putriyana. 2022. “Policy Challenges of Indonesia’s Local Content Requirements on Power Generation and Turbine Production Capability.” International Journal of Energy Economics and Policy 12 (1): 225–35. https://doi.org/10.32479/ijeep.12504.

Slaughter, E Sarah, and Mario Eraso. 1997. “Simulation of Structural Steel Erection to Assess Innovations.” IEEE Transactions On Engineering Management, 44 (2): 196–207. https://doi.org/DOI: 10.1109/17.584927.

Sukamto, Didit Dwiyoga, Anis Amarwati, and Barian Karopeboka. 2024. “Jurnal KaLIBRASI Analisis Pemilihan Metode Pelaksanaan Untuk Produktivitas Erection.” Jurnal KaLIBRASI Karya 7 (1): 47–59. https://doi.org/https://doi.org/10.37721/kalibrasi.v7.i1.1427.

Tanto, Dwi, Sri Murni Dewi, and Sugeng P Budio. 2012. “Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Pengerjaan Atap Baja Ringan Di Perumahan Green Hills Malang.” JURNAL REKAYASA SIPIL 6 (1): 69–82.

Vereen, Stephanie C, M Asce, William Rasdorf, F Asce, and Joseph E Hummer. 2010. “Development and Comparative Analysis of Construction Industry Labor Productivity Metrics.” J. Constr. Eng. Manage, 1–9. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001112.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.957

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.