Evaluasi Strategi Lot Sizing pada MRP untuk Optimasi Biaya Logistik Material Konstruksi
Abstract
Material Requirement Planning (MRP) is a critical approach for managing material procurement in construction projects to ensure timely delivery, avoid surplus inventory, and optimize logistical costs. In construction, inefficient planning often results in material shortages, excess stock, and delayed project completion, contributing to significant cost overruns. The choice of lot sizing strategy within the MRP system plays a central role in balancing ordering frequency and storage costs. While classical methods such as Economic Order Quantity (EOQ), and Lot for Lot (LFL) are widely known, limited studies have applied a comparative evaluation of these methods specifically in construction logistics under real-world constraints. Most prior research emphasizes manufacturing applications, leaving a knowledge gap in dynamic, schedule-driven environments like public infrastructure projects. This study evaluates two lot sizing strategies, EOQ and LFL, using empirical data from a palm oil mill construction project in Mandailing Natal, Indonesia. A quantitative descriptive method was applied, utilizing data from master production schedules, bill of quantities (BOQ), and actual procurement cost records. The evaluation measured total procurement costs, ordering frequency, and inventory levels. The findings reveal that the LFL strategy results in the lowest total logistic cost at Rp 685,976,950.54, compared to EOQ at Rp 769,658,817.20, due to the complete elimination of holding costs despite higher ordering frequency. This implies that LFL is more suitable for government construction projects with short-term schedules and varying material demands, where minimizing storage risk is prioritized. The study contributes to procurement optimization under Indonesia’s public goods and services framework and recommends selective lot sizing strategies based on material characteristics and project dynamics.
Keywords
Full Text:
PDFReferences
Atmaja, Jajang, Monika Natalia, Siraj Ramadhani, Yessa Rahmadini, and Sulleyman Sourkan. 2025. “Material Management Comparison between Lot for Lot and Field Actual Condition.” In E3S Web of Conferences 604 , 06002 (2025) Th The 4 ICDM 2024 Https://Doi.Org/10.1051/E3sconf/202560406002, 06002:1–8. https://doi.org/https://doi.org/10.1051/e3sconf/202560406002.
Hamdy, Muhammad Ihsan, and Ahmad Masari. 2020. “Penerapan Re Order Point (ROP) Dan Safety Stock Pada Pengadaan Chemical Demulsifier Dan Chemical Reverse Demulsifier.” Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri 5 (2): 87. https://doi.org/10.24014/jti.v5i2.8998.
Handoko, Agil, and Nia Budi Puspitasari. 2021. “Perencanaan Persediaan Bahan Baku Menggunakan Metode Material Requirement Planning (MRP) Pada PT XYZT.” Jurnal PASTI XII (3): 386–93.
Hariyadi, Masad, and Boy Isma Putra. 2018. “Pengendalian Persediaan Bahan Baku Nalco Water Treatment Dengan Menggunakan Metode Lot Sizing.” PROZIMA (Productivity, Optimization and Manufacturing System Engineering) 2 (2): 80–87. https://doi.org/10.21070/prozima.v2i2.2199.
Herlambang, and Nanda Sekar Ayu. 2021. “Assessing the Cost Efficiency of Raw Materials Inventory Using the Economic Order Quantity Method.” Priviet Social Sciences Journal 1 (2): 13–19. https://doi.org/10.55942/pssj.v1i2.101.
Jin, Zhaoyang Larry, Mehdi Maasoumy, Yimin Liu, and C Ai. 2025. “Stochastic Optimization of Inventory at Large-Scale Supply Chains.” In Math. OC, 1–24. https://arxiv.org/pdf/2502.11213.
Khayyam, Yassine El, and Brahim Herrou. 2018. “Integrated Production and Logistics Planning.” International Journal of Online Engineering 14 (12): 84–96. https://doi.org/10.3991/ijoe.v14i12.9068.
Mardiaman, and Indriasari. 2021. “Faktor-Faktor Penentu Utama Keterlambatan Pada Pekerjaan Konstruksi Pabrik ( Studi Kasus : Pabrik Kawasan Cikarang ).” E-Journal CENTECH 2020 2 (1): 1–11. http://ejournal.uki.ac.id/index.php/cen.
Mardiaman, and Doddy Setiawan. 2023. “Evaluation of Readiness for Implementation of Domestic Component Levels of Architectural Work to Support the Implementation of Green Building in Government Bogor Regency.” E3S Web of Conferences 429. https://doi.org/10.1051/e3sconf/202342901011.
Musrifah, Ai, and Firman Hidayat. 2020. “Perancangan Sistem Informasi Perencanaan Dan Pengendalian Persediaan Material Dengan Metode Lot Sizing Pada Material Requirement Planning.” Jurnal Teknik Informatika 6 (2): 30–35.
Muttaqin, Muh. Darul, and I Nyoman Dita Pahang Putra. 2024. “Perencanaan Sumber Daya Material Pada Pekerjaan Arsitektur Dengan Material Requerement Planning (MRP) Pada Proyek Gedung Bertingkat.” Jurnal Talenta Sipil Vol 7 (2): 658–69. https://doi.org/10.33087/talentasipil.v7i2.572.
Nurprihatin, Filscha, Rafie Djajasoepena, Vanessa Bertholdo Vargas, Moacyr Machado Cardoso Junior, and Ali Vaezi. 2023. “Inventory Lot Sizing Decisions for Material Requirements Planning to Minimize Inventory Costs.” Journal of Industrial Engineering and Management System 16 (2): 28–38. https://doi.org/10.30813/jiems.v16i2.4722.
Rani, Hafnidar Abdul, Tamalkhani Syammaun, Firmansyah Rachman, and Jurisman Amin. 2025. “Optimization of Construction Material Inventory Using Material Requirement Planning.” Jurnal LINEARS 8 (1): 1–7. https://doi.org/https://doi.org/10.26618/j-linears.v8i1.17116.
RathinaKumar, V, K Lalitha Priya, Prasanna Kumar.I, and C Ravekumar. 2018. “Construction Material Management through Inventory Control Techniques.” International Journal of Engineering & Technology 7 (3.12): 899. https://doi.org/10.14419/ijet.v7i3.12.16558.
Senthilnathan, Samithambe. 2019. “ECONOMIC ORDER QUANTITY (EOQ).” Eoq. http://ssrn.com/abstract=3475239Electroniccopyavailableat:https://ssrn.com/abstract=34752392http://ssrn.com/abstract=3475239.
Sri Nurjanah, Sinta, Suci Putri Lestari, and Barin Barlian. 2023. “Analysis of Raw Materials Inventory Control Using Economic Order Quantity (EOQ) (Case Study of Synthetic Leather Raw Materials at Borselly).” Jurnal Ekonomi, Manajemen, Akuntansi Dan Keuangan 4 (2): 273–88. https://doi.org/10.53697/emak.v4i2.1183.
Stadtler, H. 2005. “Multilevel Capacitated Lot-Sizing and Resource-Constrained Project Scheduling: An Integrating Perspective.” International Journal of Production Research 43 (24): 5253–70. https://doi.org/10.1080/00207540500270406.
DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.923
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University |