Analysis of Factors Affecting Material Supply Chain Performance in High-Rise Building Construction Projects

Jatiningrum Rahayu, I Nyoman Dita Pahang Putra

Abstract


The construction industry plays a vital role in the economic development and infrastructure of a country. One of its main challenges lies in the complexity of high-rise building projects, which require tight coordination in the procurement of materials, equipment, and resource management, involving multiple parties that form a complex supply chain. This study aims to analyze the factors that influence the performance of the material supply chain, in order to improve the performance of the material supply chain in the future, with a focus on the flow in the supply chain. The research involved respondents from several high-rise construction projects using purposive sampling techniques. The analysis was conducted using Partial Least Squares Structural Equation Modeling (PLS-SEM) to identify relationships among variables. The results show that information flow and financial flow have a positive and significant impact on material supply chain performance, whereas material flow does not show a significant effect. However, proper monitoring and management of material flow remain essential to improving supply chain performance. 


Keywords


Material Supply Chain Performance; High-Rise Construction; PLS-SEM

Full Text:

PDF

References


Amalia, K., Abma, D. V., & Abma, V. (2023). Risiko Dalam Penerapan Rantai Pasok Material Pada Proyek Infrastruktur Jalan. https://www.researchgate.net/publication/371291881_Risiko_Dalam_Penerapan_Rantai_Pasok_Material_Pada_Proyek_Infrastruktur_Jalan

Arifianti, E. R., Junianto, M. R., & Paksi, A. T. D. (2023). Pengukuran Quality Of Service And Facilities terhadap Customer Satisfaction. G-Tech: Jurnal Teknologi Terapan, 7(2), 646–653. https://doi.org/10.33379/gtech.v7i2.2382

Aritonang, A. H., Limbong, C. M., Hatmoko, J. U. D., & Kistiani, F. (2016). Simulasi Pengaruh Risiko Supply Chain terhadap Keterlambatan Pengadaan Material Baja Tulangan dengan Metode Monte Carlo. JURNAL KARYA TEKNIK SIPIL, 5(2), 18–28. https://ejournal3.undip.ac.id/index.php/jkts/article/view/12457

Dei, K. A., Candra Dharmayanti, G. A. P., & Jaya, N. M. (2017). Analisis Risiko dalam Aliran Supply Chain pada Proyek Konstruksi Gedung di Bali. 5(1), 1–87. http://ojs.unud.ac.id/index.php/jsn/

Effiyaldi, Pasaribu, J. P. K., Suratno, E., Kadar, M., Gunardi, Naibaho, R., Hati, S. K., & Aryati, V. (2022). Penerapan Uji Multikolinieritas dalam Penelitian Manajemen Sumber Daya Manusia. JUMANEGE, 1, 94–102. https://doi.org/https://doi.org/10.33998/jumanage.2022.1.2.89

Fei, W., Opoku, A., Agyekum, K., Oppon, J. A., Ahmed, V., Chen, C., & Lok, K. L. (2021). The Critical Role of the Construction Industry in Achieving the Sustainable Development Goals (SDGs): Delivering Projects for the Common Good. Sustainability (Switzerland), 13(16). https://doi.org/10.3390/su13169112

Hair, J. F. ., Hult, G. T. M. ., Ringle, C. M. ., & Sarstedt, Marko. (2017). A primer on partial least squares structural equation modeling (PLS-SEM). Sage. https://doi.org/https://doi.org/10.15358/9783800653614

Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011). PLS-SEM: Indeed a silver bullet. Journal of Marketing Theory and Practice, 19(2), 139–152. https://doi.org/10.2753/MTP1069-6679190202

Hair, J. F., Risher, J. J., Sarstedt, M., & Ringle, C. M. (2019). When to use and how to report the results of PLS-SEM. European Business Review, 31(1), 2–24. https://doi.org/10.1108/EBR-11-2018-0203

Hair Jr, , Joseph F., Hult, G. T. M., Ringle, C. M., Sarstedt, M., Danks, N. P., & Ray, S. (2021). Partial Least Squares Structural Equation Modeling (PLS-SEM) Using R. https://doi.org/https://doi.org/10.1007/978-3-030-80519-7

Hatmoko, J. U. D., & Kistiani, F. (2017). Model Simulasi Risiko Rantai Pasok Material Proyek Konstruksi Gedung. MEDIA KOMUNIKASI TEKNIK SIPIL, 23(1), 1. https://doi.org/10.14710/mkts.v23i1.14697

Hayati, K., Citra, K., Soviana, W., & Farhan, R. (2022). Analisis Risiko Rantai Pasok Material dalam Pelaksanaan Proyek Konstruksi Gedung di Aceh. Tameh: Journal of Civil Engineering. https://doi.org/https://doi.org/10.37598/tameh.v11i1.190

ILORI, O. O., & TANIMOWO, F. O. (2022). Heteroscedasticity Detection in Cross-Sectional Diabetes Pedigree Function: A Comparison of Breusch-Pagan-Godfrey, Harvey and Glejser Tests. International Journal of Scientific and Management Research, 05(12), 150–163. https://doi.org/10.37502/ijsmr.2022.51211

Indartini, M., & Mutmainah. (2024). Analisis Data Kuantitatif (H. Warnaningtyas, Ed.). Penerbit Lekisha. https://www.unmermadiun.ac.id/repository_jurnal_penelitian/Mintarti%20Indartini/BIDANG%20B%20PELAKSANAAN%20PENDIDIKAN/BUKU%20NASIONAL/Buku%20Analisis%20Data%20Kuantitatif-22%20Jan%2024-compressed.pdf

Ismael, I., & Junaidi. (2014). Identifikasi Faktor-Faktor yang Mempengaruhi Keterlambatan Pelaksanaan Pekerjaan pada Proyek Pembangunan Gedung di Kota Bukittinggi. Jurnal Momentum, 16(1), 25–36. http://ejournal.itp.ac.id/index.php/momentum/article/view/156

Kumarayasa Mudita, P., Sudarsana, I. K., & Nadiasa, M. (2016). Analisis Faktor-Faktor yang Mempengaruhi Waktu Tunggu Pengadaan Material Konstruksi pada Proyek Gedung di Kabupaten Badung. In Jurnal Spektran (Vol. 4, Issue 2). https://doi.org/https://doi.org/10.24843/SPEKTRAN.2016.v04.i02.p03

Kurniawan, H., Ayu, I., & Anggraeni, A. (2020). Analisis Risiko Rantai Pasok Material terhadap Keterlambatan Pelaksanaan Proyek Konstruksi. 14(1). https://doi.org/https://doi.org/10.21776/ub.rekayasasipil.2020.014.01.6

Labombang, M., & Musdalifah. (2023). Faktor yang Mempengaruhi Rantai Pasok Material Konstruksi Gedung di Kota Palu. https://doi.org/https://doi.org/10.62603/konteks.v1i5

Maddeppungeng, A., Suryani, I., & Yuliatin, R. (2014). Analisis Kinerja Supply Chain pada Proyek Konstruksi Bangunan Gedung. 3, 36–45. https://doi.org/https://dx.doi.org/10.36055/jft.v3i1.1714

Maditsaraga, G. A., & Pontan, D. (2021). Evaluasi Faktor Dominan yang Mempengaruhi Rantai Pasok pada Proyek Konstruksi Gedung Politeknik Negeri Bengkalis. 98–104. https://doi.org/https://doi.org/10.25105/psia.v2i2.10320

Makkarennu, Natsir, H. R., & Supratman. (2019). Supply Chain Management of the Plywood Industry in Indonesia. IOP Conference Series: Materials Science and Engineering, 593(1). https://doi.org/10.1088/1757-899X/593/1/012008

Munawir, R. (2021, December 31). Pemantauan Dan Evaluasi Kinerja Pengelolaan Rantai Pasok Material Dan Peralatan Konstruksi Pada Badan Usaha Jasa Konstruksi. https://binakonstruksi.pu.go.id/publikasi/karya-tulis/pemantauan-dan-evaluasi-kinerja-pengelolaan-rantai-pasok-material-dan-peralatan-konstruksi-pada-badan-usaha-jasa-konstruksi/

Nurcahyo, C. B., Putu, I., & Wiguna, A. (2016). Analisis Risiko Rantai Pasok Beton Ready Mix pada Proyek Pembangunan Apartemen di Surabaya. Jurnal Aplikasi Teknik Sipil, 14. https://doi.org/http://dx.doi.org/10.12962%2Fj2579-891X.v14i2.3048

Pradila, M., Uda, S. A. K. A., & Waluyo, R. (2024). Analisis Penerapan Faktor-Faktor Green Supply Chain pada Proyek Konstruksi Gedung di Kota Palangka Raya. Jurnal Talenta Sipil, 7(2), 749. https://doi.org/10.33087/talentasipil.v7i2.599

Pratiwi, A. C., & Dwiyanto, M. B. (2021). Pengaruh Perceived Value terhadap Purchase Intention Digital Music Streaming Services dengan Satisfaction sebagai Variabel Intervening (Studi pada Aplikasi Joox dan Spotify). Indicators Journal of Economics and Business, 3(1), 98–108. https://doi.org/https://doi.org/10.47729/indicators.v3i1.103

Rian Marliana, R. (2020). Partial Least Squares-Structural Equation Modeling pada Hubungan antara Tingkat Kepuasan Mahasiswa dan Kualitas Google Classroom berdasarkan Metode Webqual 4.0. Jurnal Matematika Statistika Dan Komputasi, 16(2), 174–186. https://doi.org/10.20956/jmsk.v%vi%i.7851

Sanaky, M. M., Saleh, L. M., & Titaley, H. D. (2021). Analisis Faktor-Faktor Penyebab Keterlambatan pada Proyek Pembangunan Gedung Asrama MAN 1 Tulehu Maluku Tengah. JURNAL SIMETRIK, 11, 432–439. https://doi.org/https://doi.org/10.31959/js.v11i1.615

Sandangan, A. L., Latupeirissa, J. E., & Tiyouw, H. C. P. (2022). Analisis Risiko Dalam Sistem Rantai Pasok Pada Proyek Upgrade Trans Studio Mall Makassar. Paulus Civil Engineering Journal (PCEJ), 4. https://doi.org/https://doi.org/10.52722/9nan9m62

Sardi, I., Carlo, N., & Adriadi, R. (2025). Transformasi Kinerja Kontraktor melalui Inovasi Rantai Pasok pada Proyek Pengendalian Banjir dan Pembangunan Embung di Kabupaten Dharmasraya. Jurnal Talenta Sipil, 8(1), 117. https://doi.org/10.33087/talentasipil.v8i1.678

Sidabutar, M., Aidilsyah, M. R., Aulia, Y. K., Umari, N. ’Iffah, Khairi, F. A., Usman, A., & Altania, E. (2020). Pengaruh Motivasi Belajar terhadap Prestasi Akademik Mahasiswa. Jurnal EPISTEMA, 1, 117–125. https://doi.org/http://dx.doi.org/10.21831/ep.v1i2.34996

Silvia, S., Fernandez, Y. Z., & Limbong, Y. A. C. (2020). Hubungan Hasil Belajar Kalkulus Diferensial dan Kalkulus Integral Terhadap Hasil Belajar Kalkulus Lanjut Mahasiswa Pendidikan Matematika Universitas Sanata Dharma. Jurnal Sains Dan Edukasi Sains, 3(2), 58–65. https://doi.org/10.24246/juses.v3i2p58-65

Sintia, I., Danil Pasarella, M., & Andi Nohe, D. (2022, May). Perbandingan Tingkat Konsistensi Uji Distribusi Normalitas pada Kasus Tingkat Pengangguran di Jawa. https://jurnal.fmipa.unmul.ac.id/index.php/SNMSA/article/view/844

Suntara, A. A., Widagdo, P. P., & Kamila, V. Z. (2023). Analisis Penerapan Model Unified Theory Of Acceptance And Use Of Technology (UTAUT) Terhadap Perilaku Pengguna Sistem Informasi Uang Kuliah Tunggal Universitas Mulawarman. Kreatif Teknologi Dan Sistem Informasi (KRETISI), 1(1), 1–8. https://doi.org/10.30872/kretisi.v1i1.275




DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.919

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.